Australian permanent resident and Chartered Civil Engineer with more than 34 years’ experience, has successfully delivered large scale Infrastructure, TBM drive Tunnels, Civil Engineering, Renewable Energy and FIFO Projects in Australia, the United Kingdom and Singapore. MAJOR ACHIEVEMENTS Awarded successive promotions during the past thirty years, commencing as a Site Engineer and progressing to become Project Manager, Area Manager and currently Construction Director. Extensive Project Management and Commercial experience, managed projects under a variety of Contract forms including NEC 3, ICE 5th, GC works and FIDIC. Extensive Design and Construct experience in both Australia, Singapore and the UK. Ability to intervene and mitigate loss and delay on large value Projects through the implementation of strategic delivery plans. Worked globally including remote locations in the Scottish Western Isles, Singapore, Australia and New Zealand. Actively promotes high standards in Health and Safety and has received recognition for incident rate reduction from high profile Clients including Rio Tinto, HS2 and Crossrail limited. Managed a variety of large-scale Civil Engineering Projects in excess of 800 Million AUD, including Rail infrastructure, Pipelines, Major Earthworks, Power Stations, Remediation, Demolition, Bridges, Tunnelling and Reinforced Concrete structures.

Overview

38
38
years of professional experience

Work History

Project Director

Vinci Construction UK
02.2014 - 12.2022
  • Crossrail West stations upgrade, The project involves the enhancement and upgrade of 13 existing stations on the Great Western line between Paddington and Reading stations in preparation for the new Crossrail train fleet
  • Works involve the enhancement of existing station buildings and concourses, platform extensions, earthing and bonding, OLE mast bases and associated Civil and M&E works adjacent to the existing operational railway
  • Including the installation of Driver Only Operated CCTV system, the first of its kind on a UK rail line
  • Design and construct contract developing Network Rail GRIP4 designs to detailed AFC designs in association with design consultant Arcadis
  • Client: Network Rail Contract value: £245 Million, value: £83.6 Million 1994 Doncaster Railport intermodal terminal
  • The provision of a twin track from the East Coast Main line to service a new site consisting of some 30,000m2 of pavement quality concrete hard standing
  • Works also included the provision of drainage and services into the site and construction of offices and facilities
  • Client: Doncaster borough council Contract value: £7.8 million

Senior Project Manager

ALSTOM Power Inc.
01.2011 - 11.2012
  • Tuas Combined Cycle Power Station
  • The project involved the construction of all Civil engineering infrastructure for the 430 MW Tuas combined cycle Gas/ Oil fired power station at Tuas Island in Singapore
  • 35,000M3 of heavy RC foundations for turbine house and condenser
  • Installation of 4400 number 35m long bored CFA piles
  • 2250 NR 18M long driven pre-cast concrete piles to foundations
  • Construction of marine structures for sea water intake and outfalls
  • Provision of 2KM long cooling water intake and discharge culvert
  • Construction of a 25m deep cofferdam to enable the construction of sea water intake and outlet structures
  • 5km of sheet pile cofferdam walls to 25m depth as temporary works
  • Construction of a 20m high steel building to house turbines and condenser including two overhead travelling cranes
  • Drainage, roads, and landscaping works
  • 330 Million Euros
  • Wallerawang 330/132kv switchyard
  • Civil and Electrical works associated with the augmentation at the 330kv Wallerawang switching yard and 132kv substation in the Blue Mountains, regional NSW Australia
  • Works included
  • Installation of two new 330/132 375 MVA transformers
  • Installation of two 11kv/415v 500KVA auxiliary transformers
  • Modification and extension of existing earth grid
  • Construction of two new 330KV transformer switchbays
  • Installation of a new spill oil system including two new spill oil tanks, containment dam and associated pipe work
  • Modification to the existing secondary 132KV and 330KV systems including new control, protection and AC systems associated with new transformers and switchbays
  • Client: Transgrid NSW Contract value: $ 156 Million
  • National Physical Laboratories Demolition and Remediation
  • This Project for the UK department of Trade and Industry involved the complex demolition and remediation of the former National Physical Laboratories in West London
  • Demolition of some 44 reinforced concrete structures
  • Demolition of two large post tensioned high-rise buildings
  • Bioremediation of hydrocarbon contaminated soils
  • Removal and disposal of blue, brown, and white Asbestos lagging and cladding to buildings and structures
  • Removal and disposal of biological and radioactive waste from buildings, sumps, and drains
  • Demolition of two former sub stations including removal of transformers containing PCB’s
  • Processing, crushing and re-deposition of some 240,000m3 of reinforced concrete demolition waste
  • Close liaison with stakeholders including the Environment agency, Greater London Authority and DTI
  • Client: UK Government (Department of Trade and Industry)
  • Contract Value: £64.6 Million
  • Normanby Steel works Remediation
  • This project was carried out on behalf of British Steel and the Yorkshire development Authority and involved the complete demolition and remediation of the 1000 Hectare Normanby steel works in Scunthorpe UK
  • Excavation of some 3,500,000 M3 of contaminated steel slag
  • Construction of two 1,000,000M3 capacity clay lined landfill cells incorporating leachate and gas collection systems to house the contaminated steel slag
  • Re-deposition of some 1,800,000 M3 of clay fill to form development plateaus
  • Demolition, crushing and processing of some 1,200,000 M3 of reinforced concrete foundations and underground structures
  • Installation of a ground water treatment system to treat high alkaline leachates
  • Licensed disposal of Asbestos, heavy metals, and special wastes
  • Provision of 12Km of dual carriageway access roads and infrastructure
  • Client, British Steel Contract value: £89 Million
  • Murrayfield, This Project for the Scottish Rugby Union involved the total redevelopment of the Scottish Rugby Union National stadium in Edinburgh
  • Demolition of two former 22,000-seat cantilever stands
  • Installation of 450 number 15m long precast driven piles
  • Pile caps, ground beams and gable end retaining walls to two new 30,000 seat two tier stands
  • In situ and precast terrace construction
  • Extensive public realm and accommodation works to Stadium approach roads
  • 35,000m3 of in situ reinforced concrete structures
  • The Scottish Rugby Union Board
  • Contract Value: £64.6 Million

Graduate Site Engineer, Section Engineer and Site Agent

Dew Civil Engineering Ltd
01.1989 - 10.1992
  • And progressed to become a,
  • My role was site based on major Civil Engineering projects including water treatment plants and sewerage works
  • Setting out of works
  • Management of direct labour and plant resources
  • Maintenance of site records and quality documentation.

Senior Project Manager

DTMT Construction
11.2012 - 02.2014
  • For the $330 Million Cape Lambert port expansion Project in regional Western Australia
  • Full responsibility for Project management, safety and financial performance
  • Control of direct workforce and plant with most of the Project scope being self performed with minimal specialist subcontracting
  • Main duties included:
  • Management of a $330 million Project budget including monthly appraisals and forecasting, scheduling of the works to interface with Mechanical and Electrical engineering disciplines
  • Management of 542 direct employees including Carpenters, Steel fixers and Concrete crews
  • Management of 93 strong site Management/Engineering/ Safety and Supervisory team
  • Management of site industrial relations
  • Management of value engineering concepts to reduce overall cost and time
  • Management of site Health, Safety and Environmental management systems, realised a reduction in the Project TRIFR rate through the introduction of several key safety initiatives
  • Management of Contractual claim submissions and negotiations
  • Reporting directly to General Manager of operations
  • Mentoring of Project Manager’s and Engineer’s.

Senior Project Manager

Alstom Power Ltd
01.2010 - 01.2011
  • Civil, for the 340 Million Euro Tuas combined cycle power plant in Singapore
  • Responsibilities include liaison with several key stakeholders including the Client -Tuas Power Ltd, and the EPCM Worley Parsons International
  • Main duties included:
  • Management of an S$240 million Project budget including monthly appraisals and forecasting, scheduling of the works to interface with Mechanical, Electrical and Process engineering disciplines
  • Management of several large value Civil and Building Subcontracts
  • Complex interfaces with Mechanical and Electrical disciplines
  • Management of in house and Subcontract Civil design teams
  • Management of Value engineering concepts to reduce overall cost and time
  • Implementation of site Health, Safety and Environmental management systems.

Senior Project Manager

Downer EDI Engineering
01.2009 - 01.2010
  • For the AU$60 Million Wallerawang Power station enhancement works in the Blue Mountains of New South Wales Australia, also involved with the delivery of the 127 turbine Collgar wind farm in Western Australia
  • Management of a $156 million Project budget including monthly appraisals and forecasting, scheduling of the works to interface with power station operations
  • Compliance with internal and client KPI’s namely cost control, Safety and environmental targets
  • Six direct reports and 105 total Project staff.

Contracts Director

Cheetham Hill Construction Ltd
01.1994 - 12.2008

Site Agent

George Dew Civil Engineering
01.1989 - 01.1994

Education

B.Eng. (Hons) Degree - Civil Engineering

Salford University
Salford UK
06.1989

Chartered Civil Engineer - undefined

UK (CEng MICE)

Chartered Professional Engineer with Engineers Australia (CPEng MIEAust) Training certification Sentinel PTS card Network Rail SMSTS Card CSCS Gold card NSW blue card. Senior first aid certificate. OHS for Project Manager’s certificate (Australia). RIW Australian rail access card Additional information - undefined

Timeline

Project Director

Vinci Construction UK
02.2014 - 12.2022

Senior Project Manager

DTMT Construction
11.2012 - 02.2014

Senior Project Manager

ALSTOM Power Inc.
01.2011 - 11.2012

Senior Project Manager

Alstom Power Ltd
01.2010 - 01.2011

Senior Project Manager

Downer EDI Engineering
01.2009 - 01.2010

Contracts Director

Cheetham Hill Construction Ltd
01.1994 - 12.2008

Graduate Site Engineer, Section Engineer and Site Agent

Dew Civil Engineering Ltd
01.1989 - 10.1992

Site Agent

George Dew Civil Engineering
01.1989 - 01.1994

B.Eng. (Hons) Degree - Civil Engineering

Salford University

Chartered Civil Engineer - undefined

UK (CEng MICE)

Chartered Professional Engineer with Engineers Australia (CPEng MIEAust) Training certification Sentinel PTS card Network Rail SMSTS Card CSCS Gold card NSW blue card. Senior first aid certificate. OHS for Project Manager’s certificate (Australia). RIW Australian rail access card Additional information - undefined

AIDEN GOGGINS