Summary
Overview
Work History
Skills
Qualifications
References
Timeline
Generic

Alan Adler

Summary

A Dual Trade Electrical Instrumentation technician & hazardous area inspector with experience working in the mining, oil & gas, infrastructure and heavy commercial industries.

.

My work history includes performing work locally, FIFO across Australia in day/night shift rotations and shut downs


Applying knowledge and experience across Construction, commissioning and operation phases to ensure compliance with Electrical and hazardous area standards, testing and function testing to ensure a fault free start up.


Contribute to a zero-harm workplace and participate in company safety initiatives.
A commitment to advancing current skill set and qualifications.
Attention to detail following standards, specifications and achieving quality workmanship.


Overview

15
15
years of professional experience

Work History

E&I Technician

Wood
03.2023 - 07.2023

INCITEC PIVOT FERTILISERS

-Decommissioning and preservation of equipment , cabling and instrumentation

-Follow work permit and isolation procedures

-Follow decommissioning procedures so not to interrupt existing operations

-Safely Bleed and purge Instrumentation tubing for safe disconnection and demolition by mechanical teams

-Red line mark up of existing drawings and complete associated FIC

-Temporary power installations


Electrician/HA Inspector

EnerMech
11.2022 - 03.2023

CHIYODA- HYDROGEN GAS PILOT PLANT

-Cable tray fabrication and installation

-Cable installation

-Equipment and instrumentation terminations

-QA/QC checks using Hexagon CCMS

-Liaise with Haztech Auditor in resolving punch list items

-Hazardous area Inspections using Hexagon CCMS

-Follow permit to Work/Isolation procedures.

-Reading and interpreting diagrams, drawings, and specifications to set up job requirements

Electrician

RSGX
09.2022 - 10.2022

APLNG WELLHEAD RECTIFICATION

- Hazardous Area inspection

- QA/QC and RLMU using Hexagon CCMS

- SWA Cable glanding and terminating

- Instrumentation installation

- RTU, WES, Micro turbine terminations

- Detailed recording for insurance purposes

- Hold permits and verify isolations

E&I Technician

RSGX
06.2022 - 09.2022

QGC TRAIN2 GE COMPRESSOR DRY GAS SEALS

OCT 2022 - NOV 2022

1521 Low Pressure & High Pressure compressor disconnect and reconnect

- Function testing

-Work closely with mechanical teams for RTD bearing and Bently nevada displacement probe installations.

-HA inspection


APLNG TRAIN 2 TURNAROUND
JUL22 AUG22
Pressure, temperature and Flow Rosemount transmitter calibrations

Valve stroking and end to end testing


QGC TRAIN 2 TURNAROUND
JUN22 JUL22
1511 and 1521 LP and HP compressor disconnect and re- connect

-Function test

-Work closely with mechanical teams for RTD bearing installations ,Bently nevada displacement probe installations, mechanical/electrical compressor float

-HA inspection








Electrician

RSGX
04.2022 - 06.2022

CROSSRIVER RAIL - MAYNE YARD

Light, power and Camera installation across the stabling yard

- Cable installation

- MCC and field equipment terminations

- QA/QC

Electrician

Downer
09.2021 - 02.2022

SANTOS LNG

Instrumentation and control system upgrades on remote compressor stations

- Cable install

- RTU upgrade

- Upgrade and replace existing instrumentation

- Install new gas cameras and associated EX junction boxes and CCTV

- New inlet Valve installation

- Hazardous area inspection

-Assist GPA engineering with commissioning and start up

E&I Technician

RSGX
06.2021 - 08.2021

RSGX E&I TECHNICIAN - APLNG TRAIN 1 TURNAROUND AUG21 SEP21 Pressure, Temperature and Flow transmitter calibrations HA Inspections, CCI anti surge valve tuning

RSGX E&I TECHNICIAN - QGC TRAIN 2 TURBINE TURNAROUND JUN 2021- JUL 2021 Turbine, Fuel gas and HSPT disconnect and reconnect Pressure and flow calibrations, HA inspections

E&I Technician

RSGX
01.2021 - 05.2021

NORTHCONNEX PROJECT SYDNEY
-PLC I/O Testing and Rectifications Tunnel wide
-MVAC Commissioning
-Emergency lighting Commissioning

Electrician

ARA Electrical
09.2020 - 12.2020

BYERWEN STAGE 2 CHPP PROJECT, QLD

- Installation and termination of Motors and associated LCS -Substation glanding and terminations
-Installation and termination of Conveyor controls -Decommission and Reinstallation of Reagent hazardous area equipment

E&I Technician

RSGX
02.2019 - 08.2019

WESTCONNEX PROJECT SYDNEY, NSW
-Commissioning of ITS Cabinets and associated equipment, PTZ Cameras, Advance warning, Variable message, Traffic loops, Boom gates, MET Phones, Photometers, over height detection, Stop signal and movable medium strip control -Modifications, Red line and green line mark ups -Communications and Allen Bradley PLC Fault finding -Controller programming (compusign)

-Punch listing and rectifications -Assist with tunnel control operations

E&I Technician

Downer
05.2017 - 11.2018

ICHTHYS LNG PROJECT


Combined cycle power plant

-instrumentation loop checks

-Hazardous area inspections

-Hold permits and carry out isolations across construction and into operation phases as ISSOW L3

-PAGA public address system commissioning


Electrician

Downer
01.2016 - 03.2017

GORGON LNG

-Installation and terminations throughout AGRU, Inlet,Jetty and C02 Injection areas

- Instrumentation loop checks - Acid gas removal unit

- Fabricate and install cable ladder and tray

- Instrumentation terminations

- Heat trace installations

- Modify instrumentation transmitter locations and tapping points on the amine absorber vessel

- Glanding of HV single core and multi core cables.

Electrician

Downer
03.2014 - 12.2016

APLNG UPSTREAM GPF

GAS PROCESSING FACILITY– REEDY CREEK

-Installation and testing of Earth Grids
-INLET equipment terminations
-Compressor cable installation and terminations -All aspects of HV, LV and ELV cable pulls


APLNG UPSTREAM GPF
GAS PROCESSING FACILTY CONDABRI NORTH
Installation and terminations on HP, LP Coolers and TEG packages


APLNG UPSTREAM GPF
GAS PROCESSING FACILTY COMBABULA
-I nstallation and terminations on HP, LP Coolers and TEG packages

Electrician

Klenner Murphy Electrical
01.2013 - 03.2014

APLNG UPSTREAM GPF

GAS PROCESSING FACILTY REEDY CREEK

-Camp extension installation and testing -Site establishment works
-Temporary power
-Transformer control terminations

Electrician

BMH Electrical
08.2011 - 12.2013

COMMERCIAL ELECTRICAL

-Carry out works in supervised and unsupervised environments around greater Brisbane and remote -Medium scale Commercial construction project work

Electrician

Electraserve
01.2010 - 07.2011

COMMERCIAL & INDUSTRIAL ELECTRICAL

-Switchboard construction and cabling
-Install Switchboards and associated equipment as part of irrigation systems
-Test and commission Irrigation systems
-Irrigation system, Dairy and water industry maintenance -Residential and commercial air conditioning

Electrician

William Hickman
01.2009 - 12.2009

COMMERCIAL ELECTRICAL

- Westfield Riccarton shopping mall

- Ferrrymead Apartment s

Skills

  • Factory acceptance testing
  • QA/QC inspection
  • Hazardous area inspection
  • Instrumentation calibrations
  • Commissioning and start -up
  • GE turbines and compressors
  • Substation and equipment terminations
  • PLC, SCADA and DCS
  • Beamex and fluke calibration equipment
  • ITS and TCMS road management systems
  • Bently Nevada monitoring equipment
  • GE Turbine and Compressor function testing

Qualifications

Cert 4 Hazardous areas
51308820Q4 (2019 refresher CERT07450)


Diploma of Electrical Instrumentation UEE50211


Cert 3 Electrical Instrumentation and Control CTF574/5862


Cert 4 Electrical Instrumentation 51207382Q4


Swagelok installation, verification and testing FST2727


Enter and work in a confined space RIIWHS202DJ


Confined small work place emergencies PUAWER0800B, 2023 Refresher RIIWHS202E


Work in accordance with an issue permit MSMPER200J


High risk license WP-11m 003265067


White card construction-1702773


Safe work at heights

LVR/CPR


Rail Industry worker 20-00213505
Queensland rail - Working in electrified territory 09473

Rail corridor access induction


QLD Electrical licence-119742


Cert 2 Air conditioning


CEC Design install and commission on grid and off grid renewable energy

References

References are available for all past positions

They are not listed so current contact information can be provided or uploaded

Timeline

E&I Technician

Wood
03.2023 - 07.2023

Electrician/HA Inspector

EnerMech
11.2022 - 03.2023

Electrician

RSGX
09.2022 - 10.2022

E&I Technician

RSGX
06.2022 - 09.2022

Electrician

RSGX
04.2022 - 06.2022

Electrician

Downer
09.2021 - 02.2022

E&I Technician

RSGX
06.2021 - 08.2021

E&I Technician

RSGX
01.2021 - 05.2021

Electrician

ARA Electrical
09.2020 - 12.2020

E&I Technician

RSGX
02.2019 - 08.2019

E&I Technician

Downer
05.2017 - 11.2018

Electrician

Downer
01.2016 - 03.2017

Electrician

Downer
03.2014 - 12.2016

Electrician

Klenner Murphy Electrical
01.2013 - 03.2014

Electrician

BMH Electrical
08.2011 - 12.2013

Electrician

Electraserve
01.2010 - 07.2011

Electrician

William Hickman
01.2009 - 12.2009
Alan Adler