Summary
Overview
Work History
Education
Skills
Timeline
Generic

Alan Flynn

Sydney,NSW

Summary

Motivated person committed to learning and implementing skilled trades and meeting customer needs. Follows instructions and leads others with equal proficiency. Cultivates productive working relationships and instills confidence and trust.

Overview

6
6
years of professional experience

Work History

Formworker/Concrete Finisher/ Pipe Layer

Greenstone Construction Group PTY LTD
Sydney, NSW
09.2023 - Current
  • Finished surfaces by troweling, floating and brushing following project requirements and specifications.
  • Used numerous types of power tools and other equipment daily.
  • Constructed forms to create various concrete structures.
  • Finished surfaces by troweling, floating and brushing following project requirements and specifications.
  • Removed debris and waste to clean site after completing work.
  • Inspected and maintained tools and equipment.
  • Poured concrete into forms using pump hose and leveled.
  • Set up and reinforced forms to accurately pour concrete for walkways and other structures.
  • Calculated concrete quantities needed for jobs.
  • Compacted grade using jumping jack or plate compactor equipment.
  • Positioned wire mesh and rebar to reinforce concrete.

Formwork Carpenter

Turners Civil Pty ltd
Wagga Wagga, NSW
05.2023 - 08.2023
  • Measured and cut timber to size in order to create formwork components.
  • Assisted with the installation of formwork for concrete structures, including walls, columns and slabs
  • Inspected completed forms for conformance to building codes and specifications.
  • Dismantled existing formwork systems when required by project schedules.
  • Repaired damaged or weakened formworks using appropriate materials like wood glue, epoxy resin or screws.
  • Work with coworkers to accomplish goals and address issues related to our products and services.
  • Bench up pits to required falls

Formworker/Concrete Finisher

Greenstone Construction PTY
Sydney, NSW
09.2022 - 04.2023
  • Constructed forms to create various concrete structures.
  • Finished surfaces by troweling, floating and brushing following project requirements and specifications.
  • Removed debris and waste to clean site after completing work.
  • Inspected and maintained tools and equipment.
  • Poured concrete into forms using pump hose and leveled.
  • Set up and reinforced forms to accurately pour concrete for walkways and other structures.
  • Calculated concrete quantities needed for jobs.

Formworker/Concrete Finisher

Healion Contractors Ltd
Tullamore, Offlay
06.2021 - 09.2022
  • Constructed formwork as per drawings
  • Used vast amount of timber and power tools to successfully complete tasks
  • Used, push pulls and slims as propping methods
  • Able to read site plans and other drawings to identify correct grades and positioning of pipe work
  • Poured footpaths and large concrete slabs by troweling, floating,power floating and brushing following project requirements and specifications.
  • Calculated concrete quantities needed for jobs.
  • Block and bench pits
  • Maintained safety of work areas by adhering to strict regulations.
  • Used numerous types of power tools and other equipment daily.
  • Laid and repaired concrete to make level and long-lasting surfaces.

Carpenter/Formworkwer/Concrete Finsher

Kenny Flynn Ltd
07.2020 - 02.2021
  • Measured, cut and shaped wood materials to specifications using hand tools, such as saws and chisels.
  • Erecting plywood forms around sewage tanks in water treatment plants.
  • Used different thicknesses of timber to make radiuses specified on drawings.
  • Fabricated formwork for concrete stairs
  • Built jigs and fixtures to assist in the production of parts.
  • Read blueprints, schematics and drawings to determine layout requirements.
  • Poured and finished concrete to a high standard

Carpenter/Concrete Finisher/Formworker

Kenny Flynn LTD
Tullamore , Co Offaly
10.2018 - 02.2019
  • Erected formwork around a vast number of schools for new concrete floors, work on windfarms forming up bases for windmills
  • Make Manholes out of timber and pour them.
  • Followed written instructions, schematics and blueprints to lay out formwork correctly
  • Poured concrete slabs on various new schools around Ireland, poured,screened, troweled and finished using power floats.
  • Form up kerb and gutter
  • Assisted in setting up formwork prior to pouring concrete.
  • Used numerous types of power tools and other equipment daily.

Education

Bachelor of Business - Business

GMIT Galway
Galway, Ireland
05.2018

Skills

  • Superior Work Ethic
  • Problem Solving
  • Worksite safety
  • Demolition and Destruction
  • Team Player

Timeline

Formworker/Concrete Finisher/ Pipe Layer

Greenstone Construction Group PTY LTD
09.2023 - Current

Formwork Carpenter

Turners Civil Pty ltd
05.2023 - 08.2023

Formworker/Concrete Finisher

Greenstone Construction PTY
09.2022 - 04.2023

Formworker/Concrete Finisher

Healion Contractors Ltd
06.2021 - 09.2022

Carpenter/Formworkwer/Concrete Finsher

Kenny Flynn Ltd
07.2020 - 02.2021

Carpenter/Concrete Finisher/Formworker

Kenny Flynn LTD
10.2018 - 02.2019

Bachelor of Business - Business

GMIT Galway
Alan Flynn