Completed around 30 builds on this crane being the Main rigger building and stripping the crane for each tower build.
Can confidently complete crane builds without guidance or people to check my work.
Frequently completing and controlling dual lifts.
Fixing and de rigging all components for turbine installation.
Always striving to achieve and continue to learn and grow as a rigger with safety and awareness as my main priority.
Tele handler operations
Various all terrain and franna works.
Rigger/Form Worker
Acciona
Gold Coast
05.2023 - 01.2024
Complete install of bridge Girders
Lift and instal Column Cages
Lift and Install Soffit Tables
Tele Handler operations
Lift and install side shutters
Temporary works
Form Worker
Rocktown
Rookwood Weir Project
01.2022 - 05.2023
Build, install and set Doka Form work
Reset and jump formwork.
Conventional formwork infills.
Work within 3mm Tolerances.
2:1 Roster.
Dogman/Form Work Carpenter
Rocktown
Cross River Rail Project
09.2022 - 05.2023
Dogman Duties
SRG slip form works including, setting and tapering guide Beams Jumping and fixing guide Beams Temporary works Conventional face shutters Strip form work Leading concrete pours.