Overview
Work History
Education
Skills
Timeline

ALI A. AL-ARIDHI

Brisbane,QLD

Overview

21
21
years of professional experience

Work History

Designer & Project Manager

Various Medical Clinics
06.2023 - Current
  • Designed and prepared comprehensive engineering and architectural drawing sets
  • Coordinated with mechanical and hydraulic disciplines to ensure project synergy
  • Conducted stringent site monitoring procedures, overseeing contractors to ensure adherence to construction quality, safety standards, and efficient resource utilization
  • Key Projects:
  • THE GAP Village medical centre
  • Paradise garden medical centre
  • Lismore medical Centre
  • Warwick Medical Centre

Site Manager / Lead Designer for Light Gauge Steel

Blue Sky Group Building and Construction
05.2022 - Current
  • Delivered structural design drawings and prepared light gauge steel framing shop drawings for approval
  • Collaborated with structural consultants to achieve feasible design solutions using computer modeling analysis
  • Managed planning, design, and construction submissions to obtain construction permits
  • Supervised site progress and provided reports on workmanship, labor distribution, and material procurement
  • Conducted factory and site visits to stay updated on industry trends
  • Key Projects:
  • 814-818 South Pine Road, Everton Park, QLD
  • 16 Glenview Court, Avondale Heights, VIC
  • 3-7 Pink Hill Boulevard, Beaconsfield, VIC

Technical Manager

10.2018 - 01.2022
  • Directed engineering activities, including shop drawings, material submittals, and method statements
  • Managed site operations, ensuring seamless coordination between suppliers, subcontractors, and on-site teams
  • Prepared procurement schedules aligned with project baselines and monitored material requirements
  • Conducted client and consultant meetings to resolve technical issues and ensure project progress
  • Secured authority approvals, including DCD, DM, and others
  • Key Projects:
  • I Love Florence Tower (Business Bay): B+G+3P+34+R
  • Belgravia Residential Building (JVC): B+G+4+R
  • LEGOLAND Hotel (Dubai Parks and Resorts): G+4+R
  • School of Research Science (Al Warqa): B+G+4+R

Technical Manager

04.2017 - 10.2018
  • Oversaw interior design and architectural coordination with MEP and civil disciplines
  • Produced draft designs, shop drawings, and production drawings
  • Supervised subcontractor progress and ensured coordination between teams
  • Revised drawings to accommodate changes and obtained authority approvals
  • Key Project:
  • Five-Star Al Wathba Desert Resorts (by Jumeirah)

Project Architect

Golden Square Engineering Consultant
12.2016 - 04.2017
  • Managed drafting departments and coordinated project changes with stakeholders
  • Reviewed designs, specifications, and BOQs to ensure compliance with codes and client satisfaction
  • Achieved authority approvals and oversaw successful project execution
  • Key Projects:
  • Al Ghurair Residential Building (2B+G+7+R, Al Mankool)
  • Flaknaz Residential Building (2B+G+7+R, Al Qusais)
  • Al Jadaf Residential Building

Civil Draftsman

SD Concept
02.2013 - 12.2016
  • Designed fit-out plans using CAD drafting and created2D and3D visual presentations
  • Coordinated with engineers, architects, and officials for public works projects
  • Reviewed technical drawings, ensuring accuracy and compliance
  • Key Projects:
  • Four Seasons Hotel (DIFC)
  • Bluewater Hotel (JBR)
  • Al Ghurair Residential Complex
  • Al Barari Residential Villas

Senior Project Engineer

ALMCO Design and General Construction Company
03.2008 - 01.2015
  • Prepared2D and3D designs, including layouts for plumbing, drainage, car parking, and landscaping
  • Collaborated with engineers and supervisors to ensure project alignment with drafted plans
  • Delivered high-quality construction drawings and managed revisions as needed

Project Engineer

Tigris River Bank for Contracting
08.2003 - 02.2008
  • Executed drafting assignments based on conceptual and design worksheets
  • Produced precise engineering and fabrication drawings under project leader supervision

Education

Master of Management -

La Trobe University
01.2022
Ongoing

B.Sc - Architectural Engineering

Baghdad University
01.2003

Skills

  • Architectural and structural design
  • Project management and coordination
  • Site supervision and quality assurance
  • CAD, Revit, and3D Max expertise
  • Procurement and material management
  • Authority submissions and approval processes

Timeline

Designer & Project Manager - Various Medical Clinics
06.2023 - Current
Site Manager / Lead Designer for Light Gauge Steel - Blue Sky Group Building and Construction
05.2022 - Current
Technical Manager -
10.2018 - 01.2022
Technical Manager -
04.2017 - 10.2018
Project Architect - Golden Square Engineering Consultant
12.2016 - 04.2017
Civil Draftsman - SD Concept
02.2013 - 12.2016
Senior Project Engineer - ALMCO Design and General Construction Company
03.2008 - 01.2015
Project Engineer - Tigris River Bank for Contracting
08.2003 - 02.2008
Baghdad University - B.Sc, Architectural Engineering
La Trobe University - Master of Management,
ALI A. AL-ARIDHI