Summary
Overview
Work History
Skills
Timeline
Generic

Ammon Kiwa

Mandurah,WA

Summary

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised or in a team enviroment and quickly mastering new skills.

Overview

4
4
years of professional experience

Work History

Advanced Rigger

Sure People Solutions
, WA
06.2023 - Current
  • Various shutdown/ project work on multiple sites from BHP, FMG in the Pilbara to work in Kwinana and Boddington. Work varies from mechanical rigging to rigging on cranes. Have worked with various crane and mechanical engineering companies for rigging work.
  • I am competent in being able to carry out various job task big or small and complete all required documentation for the lift. I have created and completed Lift studies with required drawings and details of rigging equipment required for the task.
  • Liaised with various work crews and client to achieve the desired outcome and result in a manner that is productive and safe, following all policies and procedures.

Advanced Rigger

Australian Labour Solutions (ALS)
Pilbara/Goldfields, WA
02.2023 - Current
  • Currently on the shutdown cranage work with Freo Cranes through ALS. Work on various BHP sites with Freo Cranes and various crane assets and brands. Have worked on Liebherr, Grove, Tadano, Demag, Terex etc, and different tonnage from 25T franna to 750T Liebherr.
  • Duties include participation in writing a JHA specific to job task and any other documentation needed for job. Assisted with completion of complex lift studies etc.
  • Assisted in the safe completion of various job task from crane set ups and loading/ unloading of counter weights. Install and removal of plant e.g belts, pulleys, chutes, screens, crushing bowl/ mantle etc.
  • Installed slings, shackles, hoists and other lifting devices according to manufacturer specifications.
  • Ensured all rigging equipment was properly labeled and stored correctly in designated areas.

Advanced Rigger

MPC Kinetic
Iron Bridge, WA
06.2022 - 02.2023
  • Worked on the installation of the new pipeline from Port Hedland to Iron Bridge 136km South of Port Hedland. Was tasked with rigging and set up of pipes to be welded prior to installation. Worked with various crews to ensure job was completed according to engineers specifications.
  • Duties varied from inspection and selection of all rigging equipment, ensuring equipment is tagged and fit for use.
  • Assisted in completion of complex lift studies that were required for the task, some lifts requiring multiple cranes, diggers, side booms to lift pipework for install. Working with various crews to safely complete task.

Rigger

Warrikal
, WA
10.2019 - 02.2022
  • Inspect rigging equipment for any visible damage or defects prior to use.
  • Securely attach loads to rigging equipment using clamps, shackles, and other fasteners.
  • Assist team with the mechanical rigging and job completion of various task from installation and removal of plant and structure. Jobs varied from hard skirts and soft skirts, skellerups, chute, rollers etc.
  • Determine appropriate load-bearing capacity of various types of rigging systems and components to safely remove or install plant where crane lifts are not possible. Completion of lift study prior to lift.

Skills

  • Honest and Ethical
  • Teamwork and Collaboration
  • Verbal and Written Communication
  • Construction Quality Standards

Timeline

Advanced Rigger

Sure People Solutions
06.2023 - Current

Advanced Rigger

Australian Labour Solutions (ALS)
02.2023 - Current

Advanced Rigger

MPC Kinetic
06.2022 - 02.2023

Rigger

Warrikal
10.2019 - 02.2022
Ammon Kiwa