Summary
Overview
Work History
Education
Skills
Timeline
Generic

Andrej Bundevski

Summary

Tile Installer and skilled tradesman specializes in kitchen, bath and home additions. Employs proper judgment and decision-making to consider relative costs and benefits of potential actions. Shows up on time, ready to work and stands behind final product.

Overview

7
7
years of professional experience

Work History

Tiler

ILLAWARRA TILE WORKS
01.2025 - Current
  • Installed various tile types, ensuring precise alignment and finish quality.
  • Operated cutting tools and equipment to achieve accurate tile dimensions.
  • Collaborated with clients to select materials that meet project specifications.
  • Prepared surfaces by cleaning, leveling, and applying necessary adhesives.
  • Installed various tile types, ensuring precise alignment and optimal aesthetics.
  • Maintained tools and equipment, ensuring readiness for all projects.

Production Operator

Kromberg & Schubert
12.2019 - 03.2023
  • Used equipment properly to avoid workplace hazards or injuries
  • Supported workplace safety through strict adherence to safety protocols and regular inspections of machinery
  • Participated in training sessions to enhance skills and knowledge
  • Documented production information via daily system logs and discussed issues with management
  • Inspected final products for defects and flaws using proper QA procedures
  • Maintained detailed records of production data, ensuring accuracy for inventory tracking and performance evaluation purposes
  • Set up and adjusted equipment and properly configured machines for daily operation
  • Made sure that products were produced on time and are of good quality
  • Maintained organized work area by cleaning and removing hazards
  • Organized and prepared workstations and materials needed for operations to maximize productivity
  • Met production targets and tight deadlines by collaborating closely with team members.

Private Floor Tiler

01.2019 - 12.2019
  • Reduced material waste with careful planning and accurate calculations for each tiling project
  • Consistently maintained a clean workspace which minimized accidents while also increasing overall productivity
  • Diligently followed blueprints and architectural plans for accurate tile placement
  • Kept up-to-date with industry trends, consistently incorporating new techniques into daily practice for improved results
  • Ensured client satisfaction with customized tile designs, incorporating their preferences and requirements
  • Achieved precise tile alignment by utilizing spacers, levels, and professional tools in the installation process.

Private Plasterer

03.2018 - 10.2018
  • Enhanced building stability by applying layers of plaster to interior and exterior walls, ceilings, and partitions
  • Contributed to a safe work environment by adhering to safety protocols and maintaining clean job sites
  • Protected surfaces surrounding work areas such as windows, doors, or sidewalks
  • Performed adeptly in challenging environments, including high ceilings and tight spaces, to deliver top-quality results
  • Maintained consistency in texture and color throughout projects using proper mixing techniques and careful application practices
  • Improved customer satisfaction by delivering high-quality results through precise application techniques and attention to detail
  • Maintained knowledge of industry materials, tools, and equipment.

Education

National WHS General Construction Induction Training - TR21999

Accelerated Training
Dapto, NSW
09-2024

TRAFFIC CONTROLLER - 21489

Accelerated Training
Dapto, NSW
09-2024

TRAFFIC MANAGEMENT IMPLEMENTER - TR21489

Accelerated Training
Dapto, NSW
09-2024

Machine Engineering -

Technical High School Gjorgji Naumov
Macedonia
05.2019

Machine Mechanic -

Technical High School Gjorgji Naumov
Macedonia
05.2018

Certificate III - IN WALL AND FLOOR TILING

Duke College
Richmond, NSW

Skills

  • Grout application
  • Tool maintenance
  • Surface preparation
  • Tile polishing
  • Floor tiling
  • Adhesive selection
  • Demolitions
  • Leveling techniques
  • Waterproofing
  • Floor leveling
  • Precision cutting
  • Problem-solving abilities

Timeline

Tiler

ILLAWARRA TILE WORKS
01.2025 - Current

Production Operator

Kromberg & Schubert
12.2019 - 03.2023

Private Floor Tiler

01.2019 - 12.2019

Private Plasterer

03.2018 - 10.2018

National WHS General Construction Induction Training - TR21999

Accelerated Training

TRAFFIC CONTROLLER - 21489

Accelerated Training

TRAFFIC MANAGEMENT IMPLEMENTER - TR21489

Accelerated Training

Machine Engineering -

Technical High School Gjorgji Naumov

Machine Mechanic -

Technical High School Gjorgji Naumov

Certificate III - IN WALL AND FLOOR TILING

Duke College
Andrej Bundevski