Highly motivated Civil Engineer – Track and Rail engineer with a decade of experience in Indian Railways specialized in planning and design of track alignment, bridges and station yard layouts and kick-started career in Australia with Big Build Victoria’s prestigious West Gate Tunnel Project. I have coordinated the planning, designing and construction of 05 new line and 05 doubling projects of costs over …. In Indian Railways. Coordinate with team for hanging, erection, launching and dry matching of precast segments for the various road bridges of the project over the span of six months.

Overview

14
14
years of professional experience

Work History

Structural Drafter/Designer

Freyssinet : West Gate Tunnel :Alliance CPBJH JV
2023.05 - 2023.11
  • Liaised with various stakeholders to interpret and address needs and requisites.

· Collect & Collate design and drawing data and understand the specifications.

· Coordinate with team for hanging, erection, launching and dry matching of precast segments for the various road bridges of the project.

· Understanding the Australian construction codes, Manuals & VIC roads standards for the preparation of the span booklets and kinematic sketches based on the Australian codes and VIC roads standards.

· Monitor the day-to-day work and activities.

· Coordinate with team for erection of the precast piers and false work for 7 spans of the road bridge.

  • Coordinated and administered construction engineering activities, monitored construction requirements, that projects are implemented in accordance with plans, designs, and specifications.

· Monitor the quality & safety of construction and preparation of SWMS and NCR if any.

Senior Civil Engineer, South Western Railway

Indian Railway
2014.08 - 2023.03
  • Utilized high level CAD skill and knowledge to develop high quality digital technical drawings and plans for dynamic, supportive and innovative work place and engineering projects.
  • Worked independently to develop alignments of roads and railway tracks using the survey data.
  • Worked in the team for laying railway track as per the design, Through rail renewal, de-stressing of rails, through sleeper renewal, laying of ballasts.
  • USFD(Ultrasonic Flaw Detection) testing of rails and welds, testing weld tolerance as per the guidelines followed.
  • Prepared Long welded rail (LWR/CWR) drawings duly showing the location of switch expansion joints(SEJ/SRJ) , glued joints, and other track components for more than 350 km of railway track.
  • Prepared working section for more than 350 km railway formation duly calculating earth work.
  • Prepared more than 60 railway yard remodeling and turnout /points & crossings arrangements plans.
  • Preparation & Compilation of the drawings, reports and annexure for the approval of competent authority to commission the railway project.
  • Preparation and analysis of speed calculation in curves.
  • Realignment of existing curves to a better speed potential without infringements.
  • Preparation and compilation of documents and drawings to seek approval for condonations from the Commissioner of Railway safety.
  • Developed feasibility reports with in the given time frame for an amount of 350 million AUD for sanction of 3 railway projects. Worked with other team members on developing high level concept designs and drawings during concept development stages of projects. (Project cost: 350 million AUD)
  • Adept monitoring construction projects, coordinating with fellow engineers and subcontractors to achieve the stipulated targets on time.
  • Read and interpreted designs and specifications to create engineering drawings and diagrams.
  • Liaised with various stakeholders to interpret and address needs and requisites.
  • Controlled overall quality of construction work, including budgets, schedules, and plans, while reporting daily/regularly on progress and cost.
  • Coordinated and administered construction engineering activities, monitored construction requirements, that projects are implemented in accordance with plans, designs, and specifications.
  • Offered on-site engineering support to facilitate project objectives' accomplishment duly ensuring the quality of construction and preparation of non conformity report if there is any deviation from the standard specifications.
  • Monitor construction progress for adherence to program and report to the site manager or project manager.
  • Monitored construction progress for program adherence and reported to project managers. Supervised site mobilization and oversaw procurement, installation, and construction progress of equipment and facilities.
  • Execute working knowledge of contracts and legislation relevant to the project. Undertook quantitative and qualitative safety, environment, and quality risk assessments to ensure acceptable structure and finish quality. Provided constructability reviews of design packages.
  • Collaborated closely with the Project Engineering and supervisory team to ensure timely program delivery from cost and time perspectives. Monitored incoming equipment and material quality and quantities, verified work drawings, construction, and specifications against site plans and conditions, arranging corrections or modifications where necessary.
  • Managed subcontractor timesheets, updated dashboards, and tracked weekly man-hours against targeted man-hours as per contract.
  • Coordinate with subcontractors and the engineering team and preparation of safe working method statements.
  • Worked as a team member to create working drawings and temporary staging drawings using Auto CAD for construction of 10 number of road bridges in lieu of major level crossings as part of the project “Elimination of Major Level Crossings”. (Project cost 80 million AUD)
  • Worked as a team member in preparation of quantity calculation & tender.
  • Developed 10 no level crossing drawings (Level crossing No:64,77,71,74,81,83,84,102,27,32) and obtained authority sanction for closure of level crossings using survey data.
  • Developed drawings for extension of 7 level crossing (Level crossing No; 61,63,65,66,68,81) for laying an additional railway track.

Senior Customer Service Engineer

ACC Cement LTD, Holcim Group
2013.06 - 2014.05

· Providing guidance to customers on best practices for construction

· Liaise with end customers, engineers, contractors, and architects on the benefits of utilizing the product for environmentally friendly construction and good construction practice

· Develop an improved concrete mix design to enhance the strength and durability of the concrete.

· Developed training materials and procedures or trained users in proper use of concrete & cement.

  • Track assigned tasks and prioritize the completion of tasks accordingly.
  • Conducted field surveys, inspections and technical investigations to obtain data for construction drawing revisions.
  • Worked as a mentor to less experienced or fresher staff and always keen to build strong relationship with colleagues of both senior and junior level.

Technical Service Officer

Dalmia Cements LTD
2012.07 - 2013.05
  • Perform laboratory testing of construction materials like coarse aggregate/fine aggregate/cement/steel & concrete
  • Effective supervision of the construction site & Ensuring consistency and compatibility of cement & concrete with admixture.
  • Demonstrated excellent communication skills in resolving product and consumer complaints.
  • Developed strong customer relationships to encourage repeat business.
  • Track assigned tasks and prioritize the completion of tasks accordingly.
  • Conducted field surveys, inspections and technical investigations to obtain data for construction drawing revisions

Assistant Technical Officer

Zuari Cement LTD, Heidelberg Group
2010.10 - 2012.06
  • ·Site visits and attending quality complaints regarding concrete structures
  • The casting of concrete cubes at different construction sites during the concreting process to determine the compressive strength of the concrete
  • Conduct Non-Destructive Test (NDT) in various construction sites based on customer demand to check the quality of construction.
  • ·Monitor day to day site activities.
  • Explain bar bending schedule to the supervisor.

Site Engineer

Holy Faith Builders Pvt LTD
2010.04 - 2010.09
  • Checked technical designs and drawings for adherence to standards.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Oversaw quality control and health and safety matters for construction teams.

Education

Diploma(TAFE) Building & Construction Management - Civil Engineering

Building & Construction Training Australia
Dandenong, VIC
05.2024

Diploma in Civil Engineering - Civil Engineering

Government Polytechnic, Kalamassery
India
04.2010

Industrial Training - Land Surveyor

National Council For Vocational Training
India
07.2006

No Degree - Science Education

Board of Secondary Education
India
03.2004

Skills

  • AutoCAD Expertise.
  • Civil 3D: Undergone Basic Training , keen to enhance the skill.
  • Microsoft Office 365
  • Reading and interpreting drawings & specifications.
  • Curve Designing and realignment.
  • Railway Track Designing.
  • Railway station yard track layout designing.
  • Bridge Drawings.
  • Ability to Learn Quickly
  • Interpersonal & Communication Skills
  • Time Management.
  • Adaptability & willingness to take responsibility

Accomplishments

  • General Manager South Western Railway award for best employee 2020.
  • Chief Engineer Construction South Western Railway Award for best employee2017.
  • Chief Administrative Officer South Western Railway Award for best employee 2016.
  • Completed one new Broad Gauge Line project (166 Km) including all building & construction works of Indian Railway: Approx. Cost 350 million AUD.
  • Completed one Railway Double line project (120 Km) including all building and construction work of Indian Railway: Approx. cost of 220 million AUD.
  • Completed the preliminary planning work of two double line (97Km) and two new railway line (172 km) projects: Approx. Cost of 350 million AUD

Additional Information

Victorian Driving License

Construction Industry White Card

Timeline

Structural Drafter/Designer

Freyssinet : West Gate Tunnel :Alliance CPBJH JV
2023.05 - 2023.11

Senior Civil Engineer, South Western Railway

Indian Railway
2014.08 - 2023.03

Senior Customer Service Engineer

ACC Cement LTD, Holcim Group
2013.06 - 2014.05

Technical Service Officer

Dalmia Cements LTD
2012.07 - 2013.05

Assistant Technical Officer

Zuari Cement LTD, Heidelberg Group
2010.10 - 2012.06

Site Engineer

Holy Faith Builders Pvt LTD
2010.04 - 2010.09

Diploma(TAFE) Building & Construction Management - Civil Engineering

Building & Construction Training Australia

Diploma in Civil Engineering - Civil Engineering

Government Polytechnic, Kalamassery

Industrial Training - Land Surveyor

National Council For Vocational Training

No Degree - Science Education

Board of Secondary Education
Anoop Chembakassery Narayanankutty