Summary
Overview
Work History
Education
Skills
Certification
Personal Information
Timeline
Generic

Anthony Jabbour

Ashcroft

Summary

Hardworking and passionate. Detail-oriented team player with strong organizational skills. Reliable and efficient. Great communication and customer service skills. Take pride in completing projects on-time. Experience and knowledge in Commercial, Industrial and Infrastructure.

Overview

9
9
years of professional experience
1
1
Certification

Work History

Electrician

Monodelphous
02.2024 - 06.2024
  • Cable ladder fabrication and installation.
  • Cable lid install
  • Metal conduit/strut fabrication and installation.
  • LCS Install and termination
  • Termination of MCC panels
  • Termination of weightometer control panel
  • Termination of flow elements and flow indicator transmitters.
  • Installation and Termination of motors and VSD.
  • Team effort cable pull
  • Emergency pull wire and hand switch installation and termination.
  • Conveyer belt maintenance. Belt sway switches. Weight limit sensors.
  • Radial stacker

Electrician

JTMEC - Western Sydney Airport
06.2023 - 11.2023
  • Run and terminate cables from the motor to the cutter head
  • Run and terminate CAT6 cables for screen monitoring and communications
  • Install and terminate lights throughout each gantry
  • Commission all lighting and power boxes on TBM
  • Terminate Distribution board and panels
  • Run and terminate motor cables from Generator
  • Install and terminate Conveyor belt Isolators, Pull Cord Switches, and Belt Sway Switches
  • Terminate cables supplied to water valve
  • Disconnection of temporary HV, and Re-Connection of permanent HV to TBM
  • Maintenance on Dewatering pump and Extraction pumps
  • Maintenance on Cat6 cables
  • Maintenance on Distribution panels
  • Install and terminate Lime Silo Control Panel.

Electrician

JTMEC - Tunnelec
03.2023 - 06.2023
  • Terminate High Voltage connections onto Transformer
  • Terminate Low Voltage 400mm2 single core from transformer into MSB
  • Install and Terminate Ring Main Units
  • Install toroids under each circuit breaker and terminate decron cables
  • BusBar Installation and modification in MSB - 40mm to 120mm
  • Install and terminate circuit breakers ranging between 100amp - 2400amp
  • Install and terminate ACB breakers
  • 1200amp, 2400amp and 4000amp
  • Terminate HV control panel
  • Instal and terminate Earth Leakage Relays
  • Install and terminate fluorescent lights, Emergency lights, Exit signs
  • Fluke meter testing - Fault loop impedance, RCD trip times, Injection testing, Insulation Resistance
  • Modify and Install strut/cable tray.

Electrician

Barangaroo Station - c2o Group
11.2022 - 02.2023
  • Installation, terminations and testing of DC Traction cables varying in sizes 240 - 400mm2 rated at 1480v DC
  • DC terms trained to use various specialist tools to strip DC cables which include cable sheath stripper, semi-con stripper, XLPE Stripper tool along with 400mm hydraulic crimpers with the correct manufacturer procedures
  • Measure, cut and punch out gland plates for MC rated cable glands for DC cables of various sizes (32-63mm2) according to site and manufacturer specifications and guidelines
  • Install separate insulated earthing systems dedicated for the DC Earth bonds, protective earth bonds and traction earth/ screen bonds
  • Installation and engineering of DC rectifiers, transformers, NRP, TDP, DCCB and overheads
  • Install fire rated cable tray and uni strut for insulated stainless cable cleats for traction cables
  • Crimp and install screen cables from DC cables onto the screen bar
  • QA/ QC assurance/ check to generate punch list for rectification works
  • Liaise with supervisor and site engineer on resolving issues and rectification works
  • Rectification work on punch list items
  • Fabricate, design and manufacture Earth/ Neutral bars for single and double stud lugs on trackside, DC switchboard rooms
  • Performing within scope of work under permits and isolations procedures(LOTO) as per permit conditions and with workers with the utmost highest duty of care
  • Follow builder and contractors safety protocols and hierarchy of controls (JSA,SWMS, Start cards and daily pre starts)
  • Interpret and understand wiring diagrams, schedules, termination diagrams, room layouts engineering reports and rectify issues before encountered.

Electrician

Campsie Station, Downer
07.2022 - 11.2022
  • Work with high voltage cable including pulling cable
  • Performed duct and tray work
  • Install and fit off emergency lights and non-emergency lights
  • Roughing in and terminating exit lights
  • Installing pole lights and external LED Spot lights
  • Terminate lift
  • Station room upgrades
  • Conducted thorough inspection of completed construction
  • Ensure safety procedure was followed and enforced
  • Identified hazards, repairs and risk factors
  • Worked with a diverse group of people to be time efficient and effective in our work.

Electrician

Art Gallery, Nilsen
03.2022 - 07.2022
  • Install conduits and exit signs
  • Installed 1200mm Fluorescent lights
  • Cable tray and Ducting
  • Terminate MDB on all levels
  • Installed exterior lighting and P/E Cells
  • Coded projects using drawings and manuals
  • Reported improper conduct and events potentially dangerous or harmful to the supervisor
  • Performed electrical utility services for industrial-based and new building projects
  • Identified and addressed hazards, defects, and repair requirements through inspection of electrical equipment
  • Assessed, tested, and operated a variety of electrical components and systems.

Electrician

Data Center, Stowe
01.2022 - 03.2022
  • Traced and diagnosed electrical malfunctions using hand tools and test equipment
  • Collaborated with a diverse team of electricians
  • Worked in confined spaces with supervision and help from coworkers
  • Reported dangerous or harmful equipment to supervisors
  • Performed electrical utility services
  • Identified and addressed hazards, defects, and repair requirements through inspection of electrical equipment
  • Assessed, tested, and operated a variety of electrical components and systems.

Electrician

Amazon Stowe
04.2021 - 12.2021
  • Installed conduit, wire, and motor controls
  • Connected wires to circuit breakers and transformers
  • Interpreted schematics, blueprints, and diagrams to complete projects on time
  • Placed and installed safety systems
  • Tested entire electrical assembly for performance levels and safety concerns
  • Fault finding
  • Testing and Commissioning 12v DC
  • Point to point testing
  • Installing AZI appliances.

Electrician

Jabbour Power
01.2015 - 01.2020
  • Installed conduit, wire, and motor controls
  • Install and Connect 3 Phase motors
  • Connected wires to circuit breakers and transformers
  • Switchboard upgrades
  • Kitchen and Bathroom upgrades
  • Traced and diagnosed electrical malfunctions using hand tools and test equipment
  • Interpreted schematics, blueprints, and diagrams to complete projects on time
  • Directed electricians on installation, maintenance, and repair of electrical wiring and equipment
  • Assessed, tested, and operated a variety of electrical components and systems
  • Identified and addressed hazards, defects, and repair requirements through inspection of electrical equipment
  • Contributed to various projects, providing value to department, company, and client base.

Education

All Saints Catholic Primary School
Liverpool, Sydney

All Saints Catholic Boys College
Liverpool, Sydney

All Saints Catholic Senior College
Liverpool, Sydney

Skills

  • Safety Management
  • Quality Assurance
  • Electrical Equipment Maintenance
  • New Construction
  • Commercial construction experience
  • Diagram interpretation
  • Wiring installation
  • Sub-panel installation
  • Low-voltage Systems
  • Lighting Systems
  • Electrical Panel Upgrades
  • Wiring Termination Requirements
  • Conduit fabrication

Certification

  • Contractors License
  • White Card
  • Rail Industry Worker
  • High Risk Work
  • Elevated Work Platform
  • Working safely at heights
  • LVR/CPR
  • Criminal History Check

Personal Information

  • Date of Birth: 22/07/1998
  • Gender: Male

Timeline

Electrician

Monodelphous
02.2024 - 06.2024

Electrician

JTMEC - Western Sydney Airport
06.2023 - 11.2023

Electrician

JTMEC - Tunnelec
03.2023 - 06.2023

Electrician

Barangaroo Station - c2o Group
11.2022 - 02.2023

Electrician

Campsie Station, Downer
07.2022 - 11.2022

Electrician

Art Gallery, Nilsen
03.2022 - 07.2022

Electrician

Data Center, Stowe
01.2022 - 03.2022

Electrician

Amazon Stowe
04.2021 - 12.2021

Electrician

Jabbour Power
01.2015 - 01.2020

All Saints Catholic Primary School

All Saints Catholic Boys College

All Saints Catholic Senior College
Anthony Jabbour