Summary
Overview
Work History
Education
Skills
Websites
Additional Information
References
Timeline
Generic

Arjun K C

Joondalup,WA

Summary

Forward-thinking construction leader and dedicated Project Manager offering 6+ years of construction and contracting experience on 3 projects. Well-versed in supervising all phases of construction, from pre-construction through final walk throughs and closeout. Proven skills in multitasking on over 2 projects per year. Diligent, diplomatic and inspirational with solid leadership, organizational and decision-making skills focused on delivering exceptional value to customers with high-quality construction.

Overview

9
9
years of professional experience

Work History

CIVIL ENGINEER

Monford Group
09.2022 - Current
  • Prepare ITP’s and ITC’s
  • Co-ordinate with design team and ensure that construction activities align with the approved design
  • Taking asbuilt of laid HV/DC cable and prepare the Cad file
  • Conduct inspection with client and address any quality issues
  • Prepare lookahead schedule and send to the client
  • Co-ordinate with procurement team
  • Communicate regularly with project manager/ clients and other stake holders
  • Supervise sub-station work.

PROJECT ENGINEER / ASPHALT ENGINEER

Strukton Construction and Trading W.L.L
03.2018 - 06.2022
  • Resolved issues during construction and commissioning phases to maintain tight schedules and budget levels
  • Monitored daily construction and evaluated project progress, contract compliance and safety
  • Review BOQ and estimate the budget of the project
  • Co-ordinate with quantity surveyors about ordering and pricing of materials
  • Monitor site activities related to road works such as installation of curbstone, interlocks and laying of Asphalt
  • Liaising with QA/QC team to ensure the quality of work as per Qatar Construction Specification 2014 and follow up inspection of executed work
  • Prepare the weekly look ahead plan and schedule the weekly meeting regarding work progress with project team, consultant and clients
  • Calculate the weekly requirement of Asphalt on the project and follow with Asphalt plant to ensure continuous delivery of Asphalt material
  • Managed project operations, budget and timeline and collaborated with stakeholders to review status
  • Review the road work drawings prior to implement on site
  • Follow up with third party laboratory and supervised the post inspection test for laid Asphalt such coring, rolling straight edge and evenness
  • Check and verify the sub-contractor invoice
  • Conduct and participate the tool box talk with site team about safety rules and regulation
  • Arranged all the equipment’s required for the Asphalt laying such as Asphalt pavers, rollers
  • Liaising with survey team and assign task as per priority
  • Review the invoice of the executed work prior to final submission
  • Led weekly status meeting and followed up with stakeholders and subcontractors
  • Obtained completion notices and compliance certifications from construction administration consultants.

SITE ENGINEER

Pigeon Engineering Projects, Trading & General Services
12.2015 - 02.2018
  • Co-ordinate with clients, consultant and main contractor to ensure that their requirements are meet
  • Monitor and supervised the entire site works and handover the daily task to the foreman and workers
  • Ordered the necessary raw material on advanced to avoid the shortage problem
  • Check the technical design and drawings and explain to foreman to ensure that they are followed correctly
  • Prepare the measurement sheet for the carried out work and supportive documents for the invoice
  • Prepare and summit the daily report to the clients and main contractor
  • Raise the site inspection and co-ordinate with QA/QC team to ensure the quality of work
  • Every week conduct the safety tool box talk with project team and safety officer to ensure site safety
  • Oversaw engineering efforts during field operations, providing guidance on compliance with business goals
  • Reviewed construction activities for compliance with health and safety requirements
  • Guided projects to meet timescales, budgets and agreed specifications
  • Answered technical concerns and devised solutions to resolve site and engineering problems
  • Resolved conflicts between internal and external workers and between multiple third-party contractors and vendors.

SITE ENGINEER

Baglung Urban Water & Sanitization
03.2015 - 11.2015
  • Carried out survey works needed for the installation of pipeline
  • Analyzed the pipeline project thoroughly and prepare a submission to the project engineer
  • Prepared the BBS, supervised the installation of rebar works.

Education

Bachelor in Civil Engineering

Sagarmatha Engineering College - Tribhuvan University
2015

Higher Secondary Education - Science And Technology

Trinity International College
2010

Skills

  • Effective interpersonal and communication skills are demonstrated through employment Period
  • Attitude to work with cooperation and collaboration with team members as got experienced
  • Project budgeting
  • Slight knowledge of Auto Cad/Blue beam
  • Construction equipment
  • Safe job site set-up
  • Construction management
  • Superb management skills
  • MS Office proficient
  • Concrete estimation

Additional Information

Done Migration Skills Assessment Competency Demonstration Report (CDR) and Member of Australia Engineer.

References

Available upon request.

Timeline

CIVIL ENGINEER

Monford Group
09.2022 - Current

PROJECT ENGINEER / ASPHALT ENGINEER

Strukton Construction and Trading W.L.L
03.2018 - 06.2022

SITE ENGINEER

Pigeon Engineering Projects, Trading & General Services
12.2015 - 02.2018

SITE ENGINEER

Baglung Urban Water & Sanitization
03.2015 - 11.2015

Bachelor in Civil Engineering

Sagarmatha Engineering College - Tribhuvan University

Higher Secondary Education - Science And Technology

Trinity International College
Arjun K C