Installation and repairs of Stainless Steel pipes at Water Corporation facilities in Joondalup project
GRE, Carbon steel pipeline installation including repairs in Karratha Gas Plant (KGP) Pluto Liquefied Natural Gas (LNG) Karratha project.
Technical Ammonium Nitrate (TAN) Yara Pilbara/ Tecnicas Reunidas in Tan Burrup Karratha.
GRE pipes installation and repairs in Wheatstone Gas Plant project. -Prepare the materials and equipment to be used.
Fit up all kinds of fitting such as flanges,tees and elbows. -Install and fit up of pipe spools and fittings which include Stainless steel, Carbon steel and GRE.
Polly Pipe Installation at Namuldi Site, Rio Tinto -Read and interpret the blue print prior to commencing the job.
Punch list works before hydro testing.
Measuring, cutting and shaving for GRE and CPI pipes.
Maintain good quality of workmanship.
Toolbox meeting with the clients every week.
Follow safety rules at all times
Traceability records must submit daily to the project engineer
Set up and operate production equipment accordance with current good manufacturing practices and standard operating procedures.
Cutting plates into size and shapes can also trim and beveling of plates top and bottom using profile/plasma machine
Aluminum Ship Building fabrication and repairs
Remove and replace billet and linears, adjust hard skirts at surge bin.