Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Extracurricular Activities
Certification
References
Languages
Timeline
Generic

Ashish Bogati

Melbourne,Australia

Summary

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

7
7
years of professional experience
1
1
Certification

Work History

Project Manager | Estimator

Projekt Render
VICTORIA, AUSTRALIA
01.2022 - Current
  • Prepared material take offs, bill of quantities, cost estimates, project budgets and proposals for clients to win design and project management consulting assignments
  • Formulated estimates (300+) and budgets ranging from $10,000 to $1,500,000,.
  • Preparing technical maintenance information and documents for clients to maintain constructed assets
  • Maintained detailed and organized records of bid documents, correspondence and other project-specific information.
  • Focused on project monitoring and management by developing forecasts and tracking expenses.
  • Created and implemented processes to ensure successful completion of projects.
  • Managed multiple projects with competing deadlines simultaneously.
  • Drafted project construction schedule and updated as job progressed.
  • Submitted budget estimates, progress reports and cost tracking reports.
  • Built and established strong partnerships with teams, vendors and contractors.
  • Few projects that I managed: Lirica Apartments, Luminess Apartments, Cladding Safety Victoria (CSV) – 7 projects

Quality Line Inspector

Carbon Revolution
Waurn Ponds, Victoria
07.2021 - 01.2022
  • Set up and operated production machinery according to specific standards and protocols of company.
  • Inspected, tested and measured materials for conformance to specifications and regulatory requirements.
  • Compared product and materials colors, shapes, textures and grades with predetermined templates.
  • Trained new personnel on proper use of inspection instruments and equipment and standard operating procedures.
  • Calibrated products to match design and operational specifications.
  • Operated and monitored production machinery to ensure efficient functioning of the line.
  • Hand-assembled needed parts with bolts and screws.

Assisting Hand (Cladding)

Independent Subcontractor | Danny Liu
Geelong, Victoria
02.2021 - 07.2021
  • Conducted site surveys prior to installation to take measurements and determine needed materials for project completion.
  • Determined material requirements and dimensions by studying sketches and building plans.
  • Operated hand tools and sanding equipment to prepare materials and finish project surfaces.
  • Installed insulation behind cladding systems as required by local regulations.
  • Followed safety protocols when operating power tools and ladders.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.

Crew Team Member

McDonalds
Geelong, Victoria
11.2020 - 02.2021
  • Entered orders into computer system to send order details to kitchen, mentioning customers' special requests and food allergies in person.
  • Cleaned work areas regularly throughout shift.
  • Served food quickly for positive guest experiences.

Team Member

Lonsdale Golf Club
Point Lonsdale, VIC
02.2020 - 02.2021
  • Adhered fully to kitchen standards involving required portion sizes, individual recipe instructions and safe food handling procedures.
  • Prepared variety of foods according to exact instructions and recipe specifications.
  • Distributed food to waiters and waitresses to serve customers.
  • Explained menu items, took orders and delivered food courses according to instruction.
  • Worked with managers to report and resolve customer issues or concerns.

Civil Designer/ Quantity Estimator

Griha Prabesh Design Studio Pvt. Ltd.
KATHMANDU, NEPAL
04.2019 - 06.2019

  • Prepared drawings of architectural plans for buildings and structures.
  • Evaluated existing structures to identify structural deficiencies or potential improvements.
  • Reviewed legal documents related to land use applications for accuracy before submitting them for approval.
  • Exercised knowledge of NBC codes to draft projects.
  • Utilized CAD and drafting software to accurately develop technical drawings.

Construction Manager (Civil Engineer)

Chakreshwori Nirman Sewa Pvt. Ltd.
KATHMANDU, NEPAL
11.2018 - 06.2019
  • Reviewing client’s briefs, preparing calculations and assessing plans and strategies to commence the construction work
  • Ensuring good relations between all parties involved in the project, attending regular meetings with clients for brief work progress and status, preparing agendas and minutes of the meetings and addressing design queries to the consultant
  • Preparing and providing updated work schedules to both clients and subcontractors on a monthly interim basis
  • Preparing improved site planning, schedule and procurement strategy
  • Project administration through management of project documentation and providing technical assistance to the sub-contractors
  • Working collaboratively with a multidisciplinary engineering team, attending weekly meetings to manage project delivery and ensure all tasks are completed within the requisite deadlines
  • Identifying and address any risks through the project
  • Identifying strategies and remedial actions to mitigate risk and future project delays
  • Supervising construction on-site and inspecting work completed to ensure compliance with the documented design
  • Provided technical advice to support compliant site construction
  • Few projects that I managed: National ID Building - Singhadurbar, National Stadium Retrofitting - Rangasala, Administration Building for National Stadium – Rangasala, Multi-function office building – Department of Water Resource and Irrigation, Head office – Department of Water Resource and Irrigation

Site Foreman (Civil Construction)

Shiva Shakti Construction Company Pvt. Ltd.
KATHMANDU, NEPAL
08.2016 - 11.2018
  • Ensured that jobsite materials were properly stored and handled in accordance with industry best practices.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Obtained specifications and directed work for construction crews.
  • Supported project quality assurance and quality control planning for assigned tasks.
  • Planned and managed manpower and resource requirements to support project activities.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Coordinated operations and oversee workers at construction site
  • Road level surveys, profile and cross-sectioning of area for RL establishment for construction work
  • Marking of line for irrigation and road construction
  • Use of level machine and Theodolite for level transmission and verifying for construction works
  • Assist in day-to-day construction activities including operating fork-lift, dampers and machineries
  • Few projects that I worked on: 7 km feeder road stretch for Godawari, Various Road Extension project for Lalitpur Metropolitan

Education

Master of Construction Management (Professional) -

Deakin University
10.2021

Bachelor of Science - Civil Engineering

Tribhuvan University
Kathmandu, Nepal
01.2018

CONSTRUCTION WHITE CARD -

Skills

  • Project Management
  • Contract Management
  • Vendor Sourcing
  • Financial Administration
  • Budget Preparation
  • Contract Development
  • Microsoft Office Suite Expert
  • Estimate Preparation
  • Obtaining Bids
  • Cost Estimation
  • Subcontractor Management
  • Quality Assurance
  • Project Coordination
  • Project Oversight
  • Financial Recordkeeping
  • Bookkeeping Software
  • Invoice Processing

Accomplishments

  • Academic Excellence Award (Scholarship) 2017-2018

Affiliations

Mechanical Workshop Training | June to November 2014

Volunteer Social Work | Gothalo Nepal 2014

Concreting and bricklaying workshop | Jan to March 2015

Extracurricular Activities

Active member of Gatos Montes FC Futsal Soccer Club Played inter-basketball tournament from my college

Certification

  • Professional Engineer through MSA | Engineers Australia
  • Civil Engineer | Nepal Engineering Council
  • Civil Engineer | Nepal Engineering Association

References

References available upon request.

Languages

English
Full Professional
Nepali
Full Professional

Timeline

Project Manager | Estimator

Projekt Render
01.2022 - Current

Quality Line Inspector

Carbon Revolution
07.2021 - 01.2022

Assisting Hand (Cladding)

Independent Subcontractor | Danny Liu
02.2021 - 07.2021

Crew Team Member

McDonalds
11.2020 - 02.2021

Team Member

Lonsdale Golf Club
02.2020 - 02.2021

Civil Designer/ Quantity Estimator

Griha Prabesh Design Studio Pvt. Ltd.
04.2019 - 06.2019

Construction Manager (Civil Engineer)

Chakreshwori Nirman Sewa Pvt. Ltd.
11.2018 - 06.2019

Site Foreman (Civil Construction)

Shiva Shakti Construction Company Pvt. Ltd.
08.2016 - 11.2018

Master of Construction Management (Professional) -

Deakin University

Bachelor of Science - Civil Engineering

Tribhuvan University

CONSTRUCTION WHITE CARD -

Ashish Bogati