I worked for Caelli constructions for 12 years as a formwork carpenter. The last 5 years I was employed as a leading hand. Overlooking slabs, walls, reo, pt, core and stair installations. I was required to deal with all other crews on site and organise construction to run smoothly and on time.
I have been a leading hand at Connor structures for the past 2 years. Both at the Metro and North East link. I have just currently finished pouring the vent tunnel arch forms. I have extensive experience in FRP works, arched and pressure pours.
At the NEL I have been leading hand at TBM cradle works, capping beam and panel install at Bulleen, spoil shed ground works at Trinity, arch install and pressure pours at Watsonia vent tunnel.
Managed formwork installation for various construction projects.
-stick build shutters
-installation of reo
-cast ins
-stairs
-slabs
- panels (licensed rigger)
-arch forms(install and pour)
Leading hand for the past 10 years
Qualified and licensed intermediate rigger