Over 18 years of experience in the resources industry as a Piping Supervisor and SMP Supervisor Gained industry best practice experience by working closely with industry majors Chevron,BHP,RIO, Fluor, CSBP, Kentz, Woodside, Alcoa, UGL,Kaefer, Aerison and AGC amongst others. Exposure to working in diverse environments such as FPSOs, onshore LNG plants, offshore drill rigs, Coal mines, Iron ore, and Gold mines, petrochemical refineries, Grain, Fertiliser, Magnetide, Nickel and Lithium plants. Leadership experience includes the management of up to 40 multi-disciplinary trade teams including Boilermakers, Mechanical fitters, Riggers, Scaffolders, Pipe fitters and Welders. I have a vast amount of experience as a Workshop Supervisor and have been part of many successful projects. Previously awarded Supervisor of the Month on the Pluto LNG project including various Team Safety awards on other projects. Significant international experience. Worked in South Africa, Swaziland Angola Tanzania Zambia and Australia

Overview

19
19
years of professional experience
1
1
Certification

Work History

Piping Supervisor

Kaefer Integrated services
07.2024 - 10.2024
  • Participate in daily Management and planning meetings
  • Conduct Site pre-start, labour And Resources allocation
  • Supervision of teams conducting Pipe Installation, Structural, Cranage And Rigging, Pump Installation and punch listing
  • Monitor Quality, Safety, Productivity And Compliance
  • Ensure work is carried out to Company And Client Specification And Procedures
  • Loss prevention Inspections and Safety walks

Mechanical Maintenance Supervisor

SIMPEC
10.2023 - 03.2024
  • Oversee teams conducting daily inspections on fixed plant
  • Refurbish Filters
  • Change out pumps, valves, piping
  • General fixed plant Maintenance

SMP Supervisor

SIMPEC
11.2021 - 07.2023
  • Participate in Daily Management and planning meetings
  • Conduct pre-start, de-brief and Toolbox meetings with the crew
  • Supervising a team of Boilermaker, Pipefitters, Riggers and Welders in the Preparation and Installation of pre-assembled Piping modules, Pipe supports, Process Water, Slurry and Vendor Piping around the ten LFCU's in the Wet Plant
  • Ensure teams are trained and deemed competent for the required tasks
  • Planning and Prioritising of Daily tasks
  • Material control, monitoring and requests
  • Critical Risk inspection and controls monitoring
  • Ensuring teams are adhering to Safety procedures
  • Construction verification and Completion of Sub-systems DAC walks with the Client( FMG) for Handover of Project

Piping Supervisor

Monadelphous
06.2021 - 10.2021
  • Fabrication and Installation of 13 Kilometres of 280mm and 450mm HDPE overland Piping from the Primary Crusher to the Head end
  • Ensuring Quality and Safety compliance
  • Material management and requests
  • Time and Cost management

SMP Punch list Co-ordinator

Aerison
10.2020 - 05.2021
  • Company Overview: BHP Nickel Refinery
  • Completion of FTR Sign offs with Client
  • Participate and Co-ordinate CVC Walks with Commissioning and Operations
  • Generate and close out Construction Punch lists items
  • Generate Works to go reports
  • Generate As Built Red line Mark up drawings
  • Supervision of Piping teams in Construction
  • Participate in Field Leadership Safety Observations
  • BHP Nickel Refinery

Mechanical Supervisor

Kaefer Integrated Services
07.2020 - 08.2020
  • Prepare Shutdown workpacks
  • Prepare a list of materials, tools and equipment required
  • Labour list preparation and allocation of resources
  • Supervise a team of Boilermakers, Riggers and Fitters in the installation of Ceramic lined tiles in the 4 Weigher Splitter bins
  • Monitor Quality and Safety, ensuring teams carry out tasks in a cost effective and timely manner

Mechanical Supervisor

Kaefer Integrated Services
02.2020 - 07.2020
  • Supervise and coordinate the activities and Assignments of Boilermakers/Welders and Riggers in the tasks of Structural integrity remediation
  • Fostering an environment of teamwork and cooperation and a culture of workplace safety
  • Planning and Monitoring performance against key targets
  • Actively lead and participate in safety KPI's and housekeeping, by ensuring our safety goals are met within the project
  • Monitor Quality, Time, Risk and Cost management to Client and Company expectations
  • Present daily pre-start and de-briefs, Time sheets and Daily diaries
  • Attend and participate in daily Progress meetings, weekly look ahead planning meetings

SMP Supervisor

AGC
10.2019 - 12.2019
  • Supervision of Piping, Mechanical, Structural and Scaffolding crews on Nightshift
  • Oversee construction activities at work site, including scheduling of workers and progress on the project
  • High focus on ensuring that all aspects of the construction work is performed safely
  • Ensuring work is performed in conformation with plans, specifications, schedules and cost control estimates

Supervisor

Simpec
02.2019 - 10.2019
  • Supervise crew of Pipefitters, Boilermakers, Welders and Riggers in the Fabrication, Installation of Structural, Mechanical and Piping components in the Pyromet and Dryer area
  • Oversee the daily construction activities on site, including scheduling of workers, delivery of equipment and materials, daily progress and lookahead
  • High focus on Safety, Quality and Productivity
  • Perform works in conformation with plans, specifications, schedules and cost control estimates
  • Performance management of crews through goal setting, ongoing assessment and coaching
  • Capturing scope change and variations, disruptions to avoid scope creep
  • Report to upper Management - to achieve Project Objectives and Outcomes

SMP Supervisor

Civmec
10.2018 - 12.2018
  • Company Overview: Gruyere Gold Mine
  • Supervise all construction related work activities within the Ball mill area are performed to Client satisfaction and Specification
  • Maintain the Quality aspect of all Piping works
  • Report to Project Manager on a daily basis
  • Lead and direct the team to achieve desired outcomes through goal setting, ongoing assessments and coaching
  • Focus on completing project within budget and time frame
  • Gruyere Gold Mine

Piping Supervisor

Pacific Industrial Company
02.2018 - 06.2018
  • Company Overview: Kwinana – contract awarded by Tianqi Lithium Australia Hydroxide Processing Plant Project
  • Coordinated and setup two pipe fabrication workshops
  • Supervise crew in both workshops; one in the fabrication of stainless steel and the other in the fabrication of carbon steel piping
  • Ensure Safety, Quality and Productivity according to company and client specifications is strictly adhered to
  • Confirming that the crew understand their scope of work, the quality, cost and the time management that is expected
  • Requisition, control and issue of welding consumables and components
  • Issue progress reports and welding control procedures
  • Consult with senior management with regard to progress, quality management, resource management, equipment, tools, transport and human resources
  • Kwinana – contract awarded by Tianqi Lithium Australia Hydroxide Processing Plant Project

Piping Supervisor

UGL/Kentz Joint Venture
09.2016 - 11.2017
  • Company Overview: Inpex -Darwin LNG
  • Supervise crew to ensure Safety, Quality and Productivity is a priority ensuring they understand their scope of work, the quality, cost and the time management that is expected
  • Conduct daily pre-starts, refocus and de-briefs with crew and safety advisors ensuring crew adhere to company Policies and Procedures
  • Complete daily time sheets and submit
  • Conduct weekly Toolbox talk with emphasis on 'you see it - you own it' and completing KPI's
  • Attend daily meetings with Senior Management to discuss progress, delays and constraints
  • Conduct joint walk downs on pipe lines with JKC (client) to ensure compliance before testing of systems
  • Conduct joint walk downs with JKC (client) to ensure Quality requirements comply with Re-instatement of equipment and finally signed off ready for RFC and RFSU
  • Inpex -Darwin LNG

Piping Supervisor - Gorgon Project

CB&I Kentz JV (CKJV)
07.2014 - 07.2016
  • Company Overview: won a Chevron contract to carry out the mechanical, electrical, instrumentation and commissioning work on the Gorgon Project
  • Supervise a crew of 14 tradesmen to undertake piping works on site, and ensure adherence to safety procedures and guidelines
  • Ensure work targets and quality standards are met, and that crews complete FIWP Base scope in a timely manner
  • Prioritise systems for RFC and RFSU, and monitor time sheets for the workforce; ensure crews receive relevant training and VOCs
  • Coordinate with the Project team in daily planning meetings; relay new site instructions and manage change and variations
  • Formulate regular Look-Ahead plans which include details on plant and equipment, materials, and labour
  • Order and receive materials, and request permits for commissioning and operational areas
  • Interact with clients, management, engineers, supervisors, suppliers and all relevant bodies to facilitate workflow
  • Oversee subcontractors to ensure compliance with contract requirements in terms of quality, safety, and timeliness of work delivery
  • Plan and execute daily prestart and weekly toolbox meetings, ensuring compliance with all company, client, and statutory policies, practices, and procedures
  • Resolve conflicts and conduct incident investigations as required
  • Complete all required documentation and reports, including ITRs, in a timely and accurate manner
  • Won a Chevron contract to carry out the mechanical, electrical, instrumentation and commissioning work on the Gorgon Project

Piping Supervisor - CSBP Project

AGC Ltd
03.2013 - 12.2013
  • Company Overview: www.agc-ausgroup.com AGC offers onshore/offshore construction services including structural, piping, mechanical, and equipment installation for oil & gas and resources sectors
  • Managed a crew of pipefitters, boilermakers, and welders for the fitting and welding of 2600mm stainless steel ducting; carbon and stainless steel pipe fabrication; and the installation of pipes of all sizes
  • Managed day-to-day issues, including scheduling, resource allocation, quality, safety, and productivity
  • Coordinated with the client and upper management on matters pertaining to work scoping, planning, and execution
  • Liaised with the QC/QA department to close out workpacks; signed off on ITPs to signal project completion
  • Ensured teams adhered to company standards, policies, and procedures
  • Www.agc-ausgroup.com AGC offers onshore/offshore construction services including structural, piping, mechanical, and equipment installation for oil & gas and resources sectors

Mechanical / Piping Supervisor - Karara Mining Project

AGC Ltd
01.2012 - 01.2013
  • Managed a crew of 40 boilermakers, pipefitters, and welders on the rectification/re-fabrication of structural steel and piping to company specifications
  • Allocated tasks to crew members and ensured quality assurance; ensured all safety policies and procedures were complied with
  • Led and participated in pre-start and toolbox meetings, and submitted JHAS
  • Interfaced with engineers, as well as the QA/QC and Safety teams on a daily basis; reported on progress to the Project Manager and client
  • Completed all required project documentation, including incident investigations, timesheets, and variations
  • Conducted daily pre-starts, debriefs, and toolbox presentations

Supervisor - Sino Iron Project

Construction Industries Australia
09.2011 - 01.2012
  • Company Overview: Construction Industries Australia delivers a range of design and construction services to the mining industry
  • Supervise pipe fitters and boilermakers on the installation of pipes and supports; monitored safety, efficiency, and quality of work carried out
  • Collaborated with clients, site managers, superintendents, and supervisors to facilitate the flow of work
  • Participated in pre-start and toolbox meetings, and promoted a proactive safety culture
  • Coordinated with other work crews on site to ensure safety and productivity, and multi-tasked to meet business objectives
  • Construction Industries Australia delivers a range of design and construction services to the mining industry

Supervisor - Kwinana High Efficiency Gas Turbine Installation Project

UGL Ltd
06.2011 - 09.2011
  • Company Overview: www.ugllimited.com UGL Limited (UGL), formerly known as United Group Limited, is an engineering and property services company with revenues of over $5 billion
  • Managed a team of pipefitters on a project involving the installation of large diameter pipes and supports
  • Liaise with clients, site managers, superintendents and supervisors re: progress
  • Met tight deadlines through effective workflow management
  • Www.ugllimited.com UGL Limited (UGL), formerly known as United Group Limited, is an engineering and property services company with revenues of over $5 billion

Supervisor - BP Kwinana Project

AGC Ltd
01.2011 - 05.2011
  • Oversaw the removal of redundant Effluent coolers and piping, as well as the re-installation of new units
  • Facilitated client visits through the workshop, and assisted with the conduct of project inspections
  • Coordinated with Clients, Site managers, Superintendents, and Supervisors to report and discuss work progress
  • Attended and participated in various pre-start, safety, toolbox, and debrief meetings
  • Assisted Engineers with timely completion of work packs

Workshop Supervisor

Pluto LNG
08.2009 - 12.2010
  • Managed the operations and OH&S aspects of the fabrication workshop
  • Led a team of boilermakers and pipe fabricators on pre-spooling jobs for the site; allocated work, verified quality, and monitored progress of work carried out
  • Formulated the Safety Management Plan (SMP) for both the site and the fabrication workshop
  • Carried out Loss Prevention Inspections with client and safety officers
  • Interfaced with clients, site managers, superintendents, and supervisors with regards to work progress and problem management
  • Facilitated pre start, safety, toolbox, and debrief meetings
  • Read and interpreted isometric drawings and provided directions to the team
  • Set up the workshop for weld and tack test of tradesmen
  • Assessed tradesmen on grinder Verification of Competency (trade certification)
  • Ordered materials and performed materials control; ensured materials were sorted and batched in line with project specifications
  • Verified and signed off on JSAS, and completed other required documentation relating to safe pre-starts

Piping Foreman

Boddington Gold Mine
03.2009 - 07.2009
  • Company Overview: Project
  • Oversaw piping crews at the mine site; supervised workshop fabrication and piping installation
  • Allocated work and managed performance of all crew members
  • Coordinated with the Project Manager to conduct Look-Ahead Forecasts
  • Drove OHSE initiatives to achieve safety targets, and ensured procedures and work practices complied with legislation, regulations, and standards
  • Identified hazards with the potential for significant impact on personnel or the environment; implemented remedial measures to minimise risk
  • Planned and conducted daily pre-start and weekly toolbox meetings
  • Ensured quality control, and completed all relevant documentation and reports
  • Project

Mechanical Supervisor

Alcoa
08.2005 - 02.2009
  • Company Overview: Pinjarra Efficiency Upgrade / Alcoa Project
  • Supervised work crews to ensure high quality of workmanship and efficiency to meet project schedules
  • Carried out Job Hazard Analysis (JHAS) to assess risks involved in tasks and managed identified hazards to prevent incidents, injury, and damage
  • Monitored all work, and re-directed employees to optimise job completion timelines as necessary
  • Completed time sheets for all reporting personnel
  • Attended meetings with the Project manager and Client representative to discuss job progress, problem occurrences, and work co-ordination
  • Pinjarra Efficiency Upgrade / Alcoa Project

Education

Statement Of Attainment - Provide First Aid

CBD College
Perth, WA
06.2021

Certificate IV - Project Management

Online
Perth, WA
08.2016

Diploma of Leadership and Management - Scope, Time ,Cost And Quality

Online
Perth, WA
08.2016

Certificate II in Surface Extraction Operations -

01.2014

Skills

Oil And Gas

Petro -Chemical

Mining

Plant Maintenance

References

Excellent references provided upon request.

Professional Development

  • Cert IV-Project Management-Scope, Cost, Time, Quality.
  • Diploma of Leadership and Management, 08/01/16
  • Section 44-Appointed persons Training course, 2018
  • First aid, 2022
  • RTIO Compliance Qualifications, 2020
  • Coaching IIF in Action-Ichthys, 09/01/16
  • Project Leadership Workshop-Ichthys, 2016
  • Hazard and Risk management, 2015
  • Flange face inspection Awareness-All Criticality Joints, 2017
  • Certificate II in Surface Extraction Operations, 2014
  • Confined Space Entry, 09/01/20
  • Working at Heights, 09/01/20
  • Work Team Leader - Permit to Work in Construction, 2015
  • Work Team Leader - Commissioning/Operational Area, 2017
  • SIPP Triple Course - Gorgon Project, 2014
  • Commissioning area Induction-Ichtys project, 2017
  • Supervisors HSE Management Course, 2010
  • IFAP Supervisors Training, 2010
  • Gas test Atmospheres, 2015
  • Operate commercial vehicle, 2014

Certification

Working At Heights

Enter Confined Space

Fire fighting

Gast Test Atmosphere

RIO Essentials

FMG

Languages

English
Elementary

Timeline

Piping Supervisor

Kaefer Integrated services
07.2024 - 10.2024

Mechanical Maintenance Supervisor

SIMPEC
10.2023 - 03.2024

SMP Supervisor

SIMPEC
11.2021 - 07.2023

Piping Supervisor

Monadelphous
06.2021 - 10.2021

SMP Punch list Co-ordinator

Aerison
10.2020 - 05.2021

Mechanical Supervisor

Kaefer Integrated Services
07.2020 - 08.2020

Mechanical Supervisor

Kaefer Integrated Services
02.2020 - 07.2020

SMP Supervisor

AGC
10.2019 - 12.2019

Supervisor

Simpec
02.2019 - 10.2019

SMP Supervisor

Civmec
10.2018 - 12.2018

Piping Supervisor

Pacific Industrial Company
02.2018 - 06.2018

Piping Supervisor

UGL/Kentz Joint Venture
09.2016 - 11.2017

Piping Supervisor - Gorgon Project

CB&I Kentz JV (CKJV)
07.2014 - 07.2016

Piping Supervisor - CSBP Project

AGC Ltd
03.2013 - 12.2013

Mechanical / Piping Supervisor - Karara Mining Project

AGC Ltd
01.2012 - 01.2013

Supervisor - Sino Iron Project

Construction Industries Australia
09.2011 - 01.2012

Supervisor - Kwinana High Efficiency Gas Turbine Installation Project

UGL Ltd
06.2011 - 09.2011

Supervisor - BP Kwinana Project

AGC Ltd
01.2011 - 05.2011

Workshop Supervisor

Pluto LNG
08.2009 - 12.2010

Piping Foreman

Boddington Gold Mine
03.2009 - 07.2009

Mechanical Supervisor

Alcoa
08.2005 - 02.2009

Certificate II in Surface Extraction Operations -

Statement Of Attainment - Provide First Aid

CBD College

Certificate IV - Project Management

Online

Diploma of Leadership and Management - Scope, Time ,Cost And Quality