Summary
Overview
Work History
Education
Skills
Personaldetails
Personal Information
Timeline
Generic
Beau Valentine

Beau Valentine

Johnston,NT

Summary

Driven hard-working with experience in Drilling, Bricklayer and Project management with over 12 years of experience in my combined fields. I enjoy every day of work growing alongside the team. Proactive and self-driven person who is looking for a full-time position where I can grow with a company. I adapt to new environments and tasks well with enthusiasm and excitement to learn knowing nothing is out of my ability. I strive for efficiency and precision because flow and quality are what determine the business and ultimately business profits. I can work very well in groups in either a Leadership role or as a Team member treating both roles almost the same with goals to motivate and encourage. Motivated Trainee Driller eager to advance professionally and contribute to business success. Exceptional leadership and planning abilities with deep understanding of Mining Industry practices. Teachable and ready to learn from experienced professionals. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Adept at giving detailed instructions and ensuring efficiency and safety of drilling team. Committed to proactive maintenance and staying focused after long hours in harsh weather conditions.

Overview

13
13
years of professional experience

Work History

Trainee Driller

Topdrill-Perth WA
03.2020 - Current
  • Gaining an understanding of equipment and processes through studying 'In-house Trainee Driller' modules
  • On the job exposure to drilling process by being involved in associated tasks as directed by the Senior Driller
  • Interacting with Geological observers and possibly rotating different vessel
  • Assist to set up and operate drilling rigs
  • Also involves operating secondary equipment such as diesel tanks, lines and high pressure equipments
  • Also work very closely with the Driller and need to follow their instructions.

Bricklayer

Jolley Construction-Perth WA
09.2018 - 07.2019
  • Calculating needed materials, choosing appropriate construction methods, building foundations, preparing mortar, and making sure structures are level
  • Operate cement mixer, jackhammer, saws, nail guns and all other tools of trade
  • Lay and align bricks and blocks to build or repair structures
  • Building scaffolding
  • Reinforcing structures with grout and steel
  • Maintaining a safe work environment
  • Specialized in commercial and industrial brickwork.

Bricklayer

Fitzgerald Bricklaying Pty Ltd-Sydney NSW
12.2017 - 08.2018
  • Calculating needed materials, choosing appropriate construction methods, building foundations, preparing mortar, and making sure structures are level
  • Operate cement mixer, jackhammer, saws, nail guns and all other tools of trade
  • Lay and align bricks and blocks to build or repair structures
  • Specialized in commercial and industrial brickwork
  • Building scaffolding
  • Reinforcing structures with grout and steel
  • Maintaining a safe work environment.

Bricklayer

Euro Bricklaying Pty Ltd-Sydney NSW
10.2016 - 12.2017
  • Calculating needed materials, choosing appropriate construction methods, building foundations, preparing mortar, and making sure structures are level
  • Operate cement mixer, jackhammer, saws, nail guns and all other tools of trade
  • Lay and align bricks and blocks to build or repair structures
  • Specialized in commercial and industrial brickwork
  • Building scaffolding
  • Reinforcing structures with grout and steel
  • Maintaining a safe work environment.

Contractor

NIJ construction-Perth WA
07.2013 - 08.2016
  • Site prep (loading runs), Remove excess mortar with trowels and hand tools, and finish mortar joints with jointing tools, for a sealed, uniform appearance
  • Construct corners by fastening in plumb position a corner pole or building a corner pyramid of bricks, and filling in between the corners using a line from corner to corner to guide each course, or layer, of brick
  • Measure distance from reference points and mark guidelines to layout work, using plumb bobs and levels
  • Break or cut bricks, tiles, or blocks to size, using trowel edge, hammer, or power saw
  • Mix mortar, plaster, and grout, manually or using machines, according to standard formulas
  • Laboring for between 3 and 5 bricklayers
  • Setting up/Erect scaffolding (600 and 1200) or other installation structures
  • Site cleans (as if no ones been there but there's walls)
  • Setting up runs including chalking, frames and string line
  • Cleaning of all equipment to a professional standard.

Food and Beverage Supervisor

Hogs Breath Café Midland-Midland WA
05.2012 - 03.2016
  • Welcoming and seating guests according to diner number and appropriate section
  • Maintain a welcoming pleasant dining experience through smiling and report building
  • Table service to a high standard taking orders clearing empty plates/glasses and bills taken to table
  • Preparing drink orders including cocktails, mocktails in a quick clean manner
  • Maintaining a high level of cleanliness on all surfaces in the restaurant
  • Taking reservations and preparing suitable table arrangements
  • Clearing, cleaning and setting tables
  • End of the day shutdown, bringing outside in, sweeping mopping, stocking wait stations, clearing bins and shutting down electronics.

Stonemason

Ned Helder Limestone and Stonemasonry-Perth WA
02.2012 - 06.2012
  • Daily bobcat maintenance (greasing nipples checking levels)
  • Mixing consistent Mortar
  • Laying and filling backing blocks
  • Tuck pointing joints to professional level
  • Rock pitching
  • Cutting limestone to size using a Quick cut.

Carnarvon banana plantations

05.2011 - 01.2012
  • Banana bunches are harvested when the fruits are fully developed
  • Generally, this stage is reached 75 to 80 days after the opening of the first hand
  • About 15-18 cm of stalk is left on the bunch to serve as a handle for carrying
  • Cultivators work in pairs to hold and remove the bunch without damaging it
  • Once harvested the cultivator will rest the bunch of bananas on their padded shoulder and then hang the fruit on special racks or on cables to be transported to nearby packing sheds
  • Harvesting bananas is very heavy work and requires harvest workers to be extremely strong and fit
  • Other work on the banana plantation will include spraying for weeds between the rows, fertilising or tying plastic covers over the bunches to protect the fruit from wind damage.

Education

Certificate III - Drilling Operations

Training Organisation Apprenticeship
Australind, WA

Certificate II - Drilling Operations

Training Organisation Apprenticeship
Australind, WA
12.2023

Certificate III in Conservation and Land Management -

Polytechnic west Midland
Perth, WA
01.2011

High School (Year 12) -

Havelock North High School
Hastings, VIC
01.2009

Skills

  • ORGANIZATIONAL SKILLS
  • TEAM PLAYER
  • Math
  • Dependable independent worker Troubleshooting
  • Group environments Solid independent worker
  • Basic math skills Solid communication skills
  • Strong organizational skills Strong work ethic
  • Team player Timely project completion
  • Manual labour skills Flexible work schedule
  • Establishing goals and setting priorities Power tools
  • Safety Compliance
  • Equipment maintenance and operation
  • Team Supervision
  • Vehicle Maintenance
  • Hydraulics Management
  • Air Drilling Techniques
  • Torque and Drag Reduction
  • Equipment Operation
  • Safety Management
  • Equipment maintenance and repair
  • Gauge monitoring
  • Log updating
  • Project Support
  • Active Listening
  • Teamwork and Collaboration
  • Problem-Solving
  • Time Management
  • Attention to Detail
  • Multitasking
  • Problem-solving abilities
  • Reliability
  • Excellent Communication
  • Organizational Skills
  • Adaptability and Flexibility
  • Decision-Making
  • Relationship Building
  • Team building
  • Interpersonal Skills
  • Task Prioritization
  • Self Motivation
  • Analytical Thinking
  • Goal Setting
  • Professionalism
  • Interpersonal Communication
  • Time management abilities
  • Problem-solving aptitude

Personaldetails

Yes, Certificate I-IV, 14

Personal Information

Title: Trainee Driller

Timeline

Trainee Driller

Topdrill-Perth WA
03.2020 - Current

Bricklayer

Jolley Construction-Perth WA
09.2018 - 07.2019

Bricklayer

Fitzgerald Bricklaying Pty Ltd-Sydney NSW
12.2017 - 08.2018

Bricklayer

Euro Bricklaying Pty Ltd-Sydney NSW
10.2016 - 12.2017

Contractor

NIJ construction-Perth WA
07.2013 - 08.2016

Food and Beverage Supervisor

Hogs Breath Café Midland-Midland WA
05.2012 - 03.2016

Stonemason

Ned Helder Limestone and Stonemasonry-Perth WA
02.2012 - 06.2012

Carnarvon banana plantations

05.2011 - 01.2012

Certificate III - Drilling Operations

Training Organisation Apprenticeship

Certificate II - Drilling Operations

Training Organisation Apprenticeship

Certificate III in Conservation and Land Management -

Polytechnic west Midland

High School (Year 12) -

Havelock North High School
Beau Valentine