Motivated Quantity Surveyor Intern with background in all aspects of quantity surveying. Skilled in cost management, contract administration, and procurement strategies. Proven ability to analyze blueprints and technical documents, negotiate contracts and monitor construction progress. Demonstrated impact on project efficiency through effective cost control and resource allocation.
Implemented the Last Planner System, utilizing pull planning sessions to reduce project execution times and costs.
Resolved a contractual dispute with a contractor, resulting in a $30,000 cost reduction for the construction of a 1 km concrete canal.
Developed schedules using Primavera P6 from conception to implementation, including reprogramming, and baseline comparisons.
Monitored the project's S-curve, identified risks, schedule deviations, and took corrective action as needed.
Maintained open communication by presenting weekly, bi-weekly, and monthly reports on project status, and reviewing KPIs using earned value methodology.
Projects: waste rock dumps, tailings, crushing plant, and camps.
Budget: $8,500,000.00 USD.
Project Management Office Graduate
Barrick Gold Corporation
01.2021 - 12.2021
Facilitated successful project completion through interdepartmental collaboration.
Reduced operating costs by $20,000 on mine closure projects through technical-economic studies on aggregate production.
Streamlined procurement flow using macros to enhance material control and estimates.
Identified design issues before construction for 'Equalization Box - Civil Work' project using Revit and Slide.
Mine closure projects: Re-profiling of leach pad slopes, closure of the waste dump, wastewater equalization basin, and relocation of the 13.8 kV medium voltage line.
Analista Del Sistemas De Gestión De Calidad (JCF) at Consorcio Minero Benito Juárez Peña ColoradaAnalista Del Sistemas De Gestión De Calidad (JCF) at Consorcio Minero Benito Juárez Peña Colorada