Summary

Dynamic Civil Supervisor with extensive experience at MPC Kinetic, excelling in project scheduling and quality assurance. Proven track record in supervising complex construction projects, ensuring safety compliance, and fostering team collaboration. Adept at problem-solving and managing site operations, delivering projects on time in challenging environments.

Overview

23
23
years of professional experience
1
1
Certification

Work History

Pool Builder

Baldwin Aquatic
Sunshine Coast , QLD
07.2023 - Current
  • Excavate pool shell and plumbing using 5t-12t excavators and posi track.
  • Set out and profiled pools according to specifications, ensuring accurate dimensions.
  • Form, rebar, pre-plumb shell, set out cut strings for sprays.
  • Collaborated with renderers to apply laticrete systems and waterproofing, enhancing pool durability.
  • Set out tiling and install for fully tiled pools.
  • Working with plumbing crews to install pump rooms.
  • Executed concrete work, including screeding and finishing, across multiple construction sites to ensure quality standards.
  • Commercial swimming pool construction.

Pipe Layer

A.S. Plumbing
Sunshine Coast , QLD
04.2022 - 07.2023
  • Installed pipelines for water and sewage systems.
  • Operating excavators 5t-50t (lead digger), loader, dump trucks.
  • Constructed formwork for concrete structures.
  • Interpret drawings.
  • Interacting with head contractor to schedule works and work permits.

Pool Builder

Construction of concrete swimming pools
Sunshine Coast , QLD
04.2021 - 04.2022
  • Interpreted customer expectations and ideas to implement in new pool builds and renovations.
  • Formwork, rebar, plumbing, cap, render and tile install for the following pool builders ( IBS, SERENITY POOLS, MINT CONSTRUCTION, JCO CONSTRUCTION)
  • Interpreted engineers' drawings to ensure accurate construction and alignment with project specifications.

Pipe Layer and Concreter

R.A.D Civil and drainage
Moranbah, QLD
05.2020 - 04.2021
  • Constructed large cell concrete box culverts and corrugated pipe culverts to specifications.
  • Install pipe culverts and concrete box culverts.
  • Operated machinery for formwork, steel fixing, and concrete placement on construction sites.
  • Installed formwork, bracing, and rebar according to design requirements.
  • Poured, screeded, and finished concrete surfaces to achieve high-quality results.
  • Interpret construction drawings and steel schedules.
  • Operated 5t-12t excavators for excavation and earthmoving tasks on construction projects.
  • Adani rail project, Queensland.

Civil supervisor

MPC Kinetic
01.2018 - 01.2020
  • Supervised EBA and subcontractors in constructing 43 turbine foundations and access track in challenging wet and muddy farmland, ensuring project adherence to timelines.
  • Quality assurance of reinforcing steel, formwork and concrete for 480m3 gravity foundations.
  • Managed hazards for EBA and subcontractors on site
  • Coordinated plant and machinery logistics, tracking servicing and maintenance to minimize downtime.
  • Liaising with client, contractors in updating scheduled works and deliveries onsite
  • Reported on construction progress, quantities, and site issues to management, facilitating informed decision-making.
  • Berrybank Windfarm, Victoria.

Piling supervisor/Substation construction supervisor

RCR O'Donnell Griffin
05.2017 - 07.2018
  • Supervised substation construction crews across formwork, rebar, concrete, earthworks, lifting, and fencing to maintain project timelines and quality
  • Managed daily operations of piling crews on construction sites to ensure efficient workflow and adherence to safety standards
  • Schedule and organise equipment and work crews to carry out works
  • Understand and interpret drawings to crews
  • Apply safe work procedures onsite
  • Identify site hazards and implement appropriate controls
  • Identify construction issues and solutions to move forward with safe construction
  • Reported daily construction progress to management, highlighting key milestones and addressing any immediate concerns
  • Contributed to construction efforts at Darling Downs Solar Farm

Civil Supervisor

MPC Kinetic
09.2018 - 01.2018
  • Supervised subcontractors (earthworks, formwork, rebar, concreters, trenching) in constructing 39 turbine foundations and access tracks through hilly terrain, ensuring quality and safety standards were met
  • Monitored work progress to ensure adherence to project schedule, facilitating timely project delivery
  • Report daily construction to management and client
  • Oversaw onsite construction, enforcing safe work procedures to minimize risks and ensure compliance with safety regulations
  • Crowlands Windfarm, Victoria.

Yard hand, Forklift/Loader operator, Dogman

McConnell Dowell
10.2016 - 04.2017
  • Load and unload freight using forklifts
  • Load and unload plant and equipment
  • Coordinated crane operations by signaling for franna lifts to enhance safety in transporting fuel cells.
  • Organised and maintained laydown yard, ensuring safe unloading areas and optimal space utilization.
  • Directed incoming plant and freight deliveries, enforcing safe work practices and compliance with regulations.
  • Complete all associated paperwork machinery prestart, JHA, take 5
  • NGP Gas pipeline. Tennant Creek, Northern Territory.

Civil Supervisor

Electrix
02.2015 - 07.2016
  • Supervised trenching, concrete, conduit installation, and cable hauling for NBN bulk drop and node construction, ensuring project compliance and safety standards
  • Oversaw subcontractor activities on job sites, coordinating efforts to align with project timelines and specifications
  • Identifying underground services according to dial before you dig drawings and carrying out excavation with minimal impact
  • Acquired knowledge of permitting processes and compliance procedures to facilitate project execution and adherence to regulations

Civil Supervisor

McConnell Dowell
07.2014 - 02.2015
  • Supervised earthworks, concrete, crane crews, and subcontractors for installation of coal valve, underground conveyor, and stacker rail extension, ensuring timely project milestones.
  • Oversaw project tasks, adapting approach based on project size and complexity to meet specific requirements.
  • Organized work crews and schedules for up to 30 employees on site.
  • Ensured compliance with safety procedures and obtained permits for Rolleston coal operations.
  • Communicated project progress and challenges to engineering and management teams, facilitating informed decision-making.
  • Working closely with client to carry out construction
  • Rolleston Coal Mine Expansion.

Civil Supervisor

McConnell Dowell
02.2012 - 07.2014
  • Supervising earthworks, concrete and piping crews, crane crews and subcontractors for installation on well pads, holding dams and camp construction
  • Scheduling works and work crews of up to 30 employees (earthworks,formwork and concrete,mechanical,lifting,fencing crews)
  • Acquired and applied quality assurance standards to enhance project compliance
  • Fostered strong working relationships with clients to ensure project alignment and satisfaction
  • Carry out works in accordance with safety procedures
  • Conducting risk assessment workshops
  • Reporting construction progress to engineering and project management
  • Identified construction issues and proposed effective solutions to mitigate risks
  • GLNG - $360 million LNG gas compressor station and gas pipeline.

Pipe-Layer
03.2009 - 11.2011
  • Reading & interpreting plans & ground conditions
  • Working on Stage 2 of the Northern Interconnector water grid
  • Dewatering and trench supports
  • Installation of water pipe and communication conduit
  • Organising trench dig and bedding
  • Northern Network Alliance – McConnell Dowell water pipeline.

Sub-Contractor / Manhole Builder
09.2006 - 12.2008
  • Concreting and benching of sewer pipeline access chambers and valve pits
  • Quote and schedule work
  • Humes Precast Factory Brisbane & Sunshine Coast Regional Council.

Pipe-Layer/Truck Driver
01.2003 - 09.2006
  • Pipeline construction (sewer and water pipelines)
  • Driving of equipment – Hiab truck
  • Trench shield installation
  • Maroochy Water Services.

Concreter/Pipelayer
07.2004 - 01.2006
  • Operating excavators, Backhoes, Front End Loaders
  • Concrete Construction: Stormwater pits, sewer pump stations and manholes, culverts and headwalls
  • Installation of stormwater, sewer and water pipe
  • Suncoast Pipelines.

Education

Cert IV Building And Construction - Construction

SPASA
Online
04-2022

Cert IV Pool And Spa Building - Construction

SPASA
Online
04-2022

Skills

  • Pool construction
  • Concrete placement
  • Steel and formwork
  • Pipelaying and excavation
  • Machinery operation
  • Water management
  • Technical drawings
  • Project scheduling
  • Site management
  • Plumbing installation
  • Tiling installation
  • Site supervision
  • Quality assurance
  • Safety compliance
  • Problem solving
  • Attention to detail
  • Team collaboration
  • Time management
  • Risk assessment

Certification

  • Cert 4 Pool and spa building, CPC40808
  • Cert 4 building and construction, CPC40110
  • High Risk License, 0003085010, Dogging, Forklift
  • Confined Space, RIIOHS202A, 11/03/13
  • Work Safely at Heights, RIIOHS204A, 11/03/13
  • Dozer License, RIIMP0323E, 12/17/08
  • Front End Loader License, RIIMP0321F, 12/17/08
  • Excavator License, RIIMP0320F, 12/19/08
  • Skid steer (VOC), RIIMPO318A
  • Heavy Rigid Truck License, 072312758
  • Operate and Maintain a Four Wheel Drive Vehicle, RIIVEH305A
  • Identify, locate and protect underground services, RIICCM202D
  • Installation of underground services using open excavation, RIICPL401D
  • Haul underground cable, ICTCBL2064A
  • Communicate in the workplace, RIICOM201A
  • Respond to local emergencies and incidents, RIIERR302A
  • Comply with site work processes/procedures, RIIGOV201A
  • Conduct local risk control, RIIRIS201B
  • Work safely and follow OHS policies and procedures, RIIOHS201A
  • Apply risk management processes, RIIRIS301B
  • Conduct Safety and Health investigations, RIIOHS301A
  • Blue Card, 014552, 08/03/03

References

  • Brenton Dennis, Construction manager, MPC Kinetic, 0419956820
  • David Sharp, Electrix Project Manager, NBN, 0419704650
  • Scott Pagett, Area Manager, Roma GLNG, McConnell Dowell, 0407913432
  • Bruce Graham, Project Manager, Rolleston Coal Mine Expansion, McConnell Dowell, 0407715513

Personal Information

Date of Birth: 06/10/75

Timeline

Pool Builder

Baldwin Aquatic
07.2023 - Current

Pipe Layer

A.S. Plumbing
04.2022 - 07.2023

Pool Builder

Construction of concrete swimming pools
04.2021 - 04.2022

Pipe Layer and Concreter

R.A.D Civil and drainage
05.2020 - 04.2021

Civil Supervisor

MPC Kinetic
09.2018 - 01.2018

Civil supervisor

MPC Kinetic
01.2018 - 01.2020

Piling supervisor/Substation construction supervisor

RCR O'Donnell Griffin
05.2017 - 07.2018

Yard hand, Forklift/Loader operator, Dogman

McConnell Dowell
10.2016 - 04.2017

Civil Supervisor

Electrix
02.2015 - 07.2016

Civil Supervisor

McConnell Dowell
07.2014 - 02.2015

Civil Supervisor

McConnell Dowell
02.2012 - 07.2014

Pipe-Layer
03.2009 - 11.2011

Sub-Contractor / Manhole Builder
09.2006 - 12.2008

Concreter/Pipelayer
07.2004 - 01.2006

Pipe-Layer/Truck Driver
01.2003 - 09.2006

Cert IV Building And Construction - Construction

SPASA

Cert IV Pool And Spa Building - Construction

SPASA
Bradley Hall