I have specialised experience that I have gained over the years working within the Wind Turbine Industry. I am a qualified HSEQ and currently working as a QA supervisor.
• MACINTYRE Wind Farm
180 x Nordex Delta 4000-N163/5.7
Australia(09/2022 - Current)
• Parep Wind Farm
50 x V150 WTG
Australia (6/2021 – 12/2021)
• Wesley-Ciskei Wind Farm
10 x V126 WTG
South Africa (10/2020 – 02/2021)
• La Flor Wind Farm
9 x V136 Vestas WTG
Chilé (06/2019 – 07/2019)
• Cabo Negro Wind Farm
3 x V112 Vestas WTG
Chilé (07/2019 – 10/2019)
• Miramar Wind Farm
24 x Goldwind WTG
Argentina (12/2019 – 02/2020)
• Anneberg Wind farm 3 x V136 Vestas WTG Sweden (10/2018 – 12/2018)
• Nojoli Wind farm
44 x V100 Vestas WTG
South Africa (01/2016 – 05/2016)
• De Aar 2 Wind farm
96 x 1.5MW UPC WTG
South Africa (05/2016 – 10/2017)
• Nojsomheds Odde Wind farm
9 x V117 Vestas WTG
Denmark (10/2017 – 12/2017)
• Theparak Nakornratchasima T5 Wind farm
30 x V136 Vestas WTG
Thailand (01/2018 – 07/2018)
• Högkölen Wind farm
18 x V126 Vestas WTG
Sweden (08/2018 – 10/2018)