Dynamic Estimator with a proven track record at Total Insulation QLD/WA, skilled in cost estimation and project planning. Expertly managed budgets, achieving financial efficiency while ensuring compliance with industry standards. Strong decision-making and time management abilities foster collaboration with teams, driving successful project outcomes and client satisfaction.
Overview
17
17
years of professional experience
Work History
Estimator
Total Insulation QLD / WA
01.2017 - Current
Accurately measure project quantities, ensuring material calculations align with required specifications and minimizing wastage or shortages in procurement.
Estimate labor, material costs, and equipment rentals based on industry standards to develop precise project budgets and financial planning.
Track project expenses in real-time, preparing detailed cost variance reports to identify budget deviations and ensure financial efficiency.
Collaborate with project managers, engineers, and clients to verify cost accuracy and ensure smooth project execution without financial overruns.
Analyze current market data and supplier pricing trends to determine cost-effective procurement strategies for required materials and resources.
Maintain accurate cost estimation documentation, updating records regularly to reflect project progress and financial changes.
Ensure compliance with all relevant safety regulations, building codes, and industry standards to uphold quality and regulatory requirements.
Site Supervisor
Total Insulation QLD / WA
01.2010 - 01.2017
Supervised and coordinated daily site operations for insulation and sheet metal installation across multiple industrial and commercial projects.
Interpreted technical drawings and ensured precise execution of insulation (thermal, acoustic) and cladding systems.
Directed a team of 10 workers, assigning tasks and monitoring progress to ensure timely project completion.
Enforced strict compliance with occupational health and safety regulations, including conducting toolbox talks and site safety audits.
Managed material inventory, ensured timely delivery of supplies, and minimized wastage.
Conducted on-site inspections to ensure work quality, adherence to specifications, and readiness for client or QA/QC review.
Liaised with project managers, engineers, and other trades to coordinate tasks and resolve site issues effectively.
Maintained accurate documentation including work logs, progress reports, and incident records.
Trained junior staff in proper installation methods, safety practices, and tool usage.
Implemented time-saving techniques and quality improvements, contributing to project efficiency and client satisfaction.
Sheet Metal Apprentice
Total Insulation QLD / WA
01.2008 - 01.2010
Assisted journeymen and supervisors in the installation of thermal and acoustic insulation on piping systems, ducts, tanks, and vessels.
Measured, cut, and fitted insulation materials (e.g., fiberglass, mineral wool, elastomeric) according to specifications.
Supported the fabrication and installation of sheet metal cladding (aluminum, galvanized steel, stainless steel) for protective finishes.
Prepared surfaces for insulation by cleaning, securing materials, and applying adhesives or mechanical fasteners.
Loaded, unloaded, and organized tools, materials, and equipment to support daily work activities.
Followed detailed instructions and blueprints under close supervision to complete assigned tasks accurately.
Observed and followed all safety procedures including wearing PPE, maintaining clean work areas, and identifying hazards.
Participated in toolbox talks, safety briefings, and on-the-job training sessions.
Maintained and cleaned tools and equipment after use, ensuring proper storage and maintenance.
Demonstrated a willingness to learn new skills, ask questions, and take initiative on the job site.