Contributed to the installation of parapets on the 382-meter-long Boyanup-Picton Road bridge and two additional bridges in Collie River, with Liebherr 60t - 130t Mobile Crane.
Set up the crane and secured work areas to prevent unauthorized access, ensuring a safe working environment.
Install parapets on the bridge through radio communication with the operator positioned under the bridge.
Use swiftlift and chain slings to lift and position 400 precast concrete panels with precision.
Collaborated with mechanics to stay aligned on progress and necessary adjustments.
Conducted cutting and bending of rebar structures according to safety standards and engineering specifications to facilitate accurate parapet positioning.
Use chain block to assist in the accurate positioning of parapets, aligning them with designated mounting points, and secured them using bolts.
Worked closely with engineers, safety inspector teams to coordinate tasks and resolve issues, ensuring the alignment and stability of the bridge structure
Fifo Rigger - West Musgrave
Melchor
Ngaanyatjarra-Giles WA
12.2023 - 03.2024
(BHP, Construction of a copper and nickel mine)
Engaged in constructing all in-situ concrete works for BHP, which included the Primary Crusher (28 meters high), two 50-meter-long Reclaim Tunnels, two Vertical Roller Mills (each with 1,600m³ of concrete), and the pre-casting of T-roof beams on-site.
With Franna, pick-and-carry various loads, including reo bar, cages, stillages, scaffold tubes, plywood, oxy bottles, beams, mats, panels, generators, scissor lifts, and container storage, etc.
Utilized chain slings, soft slings, clamps, pins, and shackles for efficient and secure lifting.
Coordinated with steel fixers, carpenters, concreters, scaffolders, and supervisors to lift and place materials across the site.
Demonstrated the ability to perform tasks swiftly and accurately in high-paced work environments
Managed loading and unloading of trailers using an 80t rough terrain crane, using pig ears.
With 200t Crawler crane : formwork and shuttering tasks, including erecting structures for concrete placement and dismantling them after concrete sets.
Lifting bar mats, cages, shutters, and pulling out precast T-roof beams from formwork using a spreader beam, sheave, and soft slings.
Leading Hand Boilermaker/Rigger-Site Installation at Engineering ApplicationsLeading Hand Boilermaker/Rigger-Site Installation at Engineering Applications