AUTOCAD
8 years of experience on Architectural, Landscape, Civil/ Structural,MEP, Landscaping construction drawings, fit outs , facade works and Project Management role
Has been involved in both the preliminary facade design intent during the early concept stage, working with architects and has gained a diverse range of experienced in Conceptualization, Designing, Detailing, Fabrication and Assembly drawing in coordination with the fabricator, preparing Job material lists, Cutting Lists and Material take-off, has experienced in Material Submittal works, Method Statement works and Supervision and other Technical reports for Project Programming. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.
Prepare and build all project schedules collaboratively with the project team.
Prepare purchase orders from different site projects and
Coordination with subcontractors
Participate in all phases of construction planning and scheduling process, including creating contract, procurement, baseline, and track schedules.
Participate in pursuit opportunities with business development, including interviews, presentations and the creation of proposal schedules.
Conduct regular project visits to review job status and apply construction sequencing knowledge to maintain project schedules accurately.
Identify and effectively communicate schedule challenges, risks, and conflicts to stakeholders and provide corrective suggestions and creative solutions.
Assist project teams in schedule sequencing, methods of construction, project delays and impacts, alternate work plans, and recovery schedules.
Generated department orders and accompanying documentation.
• Undertake client and stakeholder management
•Participating ni Site Progress meetings
•Providing support in contract administration in delivering projects
•Reviewing Contract support for builders
•Responsible for Superintendent Directions for builders as a PM client-side
•Responsible for Meeting Agenda and preparing MOM
•Tracking and updating the Project Registers
•Support role for project claims and deliverables
•Preparing and responses to RFI and RFA
•Overseas the Project claims, Notice of Delay, Extension of times and Variation claims of the builders
•Responsible for checking the plans with CDC (Certificate of Design Compliance)
•Responsible for Subcontractors (materials) with certificates and test to comply in Australian Standards
• Presenting creative concepts to client on behalf of the design team.
• Producing Shop drawings
• Creating architectural concept designs (2D models and 3D models)
• Daily follow ups and coordination with the Head
fo Department
• Preparations of Detail Drawings needed in Site for on-going projects
• Dealing with problems that might come up during the building or design stage and producing shop drawings for submission.
-Stainless steel column cladding, elevator cladding, glass balustrade, aluminum cladding, Stainless steel balustrade and metal door.
Project Manager, Project/ Design Coordinator , draftsman , Architect, Site Supervisor
Australian Visa 482 Subsequent Visa (Dependent)
AUTOCAD
SKETCHUP
LUMION
REVIT
ARCHICAD
PHOTOSHOP
MICROSOFT
White Card -Construction and Induction card Industry - 2027
Western Australia
-Residential Dwellings
-Refurbishment of Schools and Commercial Establishments
-Fit out and Extension of School
-Recreational Park
Doha Qatar
-Metro Rail
-Tram
-Mixed Use developments
- 5 and 6 star hotels
-Place Vendome mall
-Commercial Banks
-Residentials
-Shopping malls