Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Cheynne Mitchell

Peregian Springs,QLD

Summary

Hard-working Supervisor with exceptional experience leading teams, delivering results and exceeding expectations. Creative and motivated leader adept at utilizing exceptional design and planning strengths to accomplish complex projects. Skilled in teaching new concepts and best practice strategies.

Overview

21
21
years of professional experience
1
1
Certification

Work History

Supervisor

Icbs
06.2023 - Current

Brisbane, Mackay, Townsville, Gold Coast


  • Install pressure piping, steam boilers and thermal oil boilers
  • Measure and design site run piping and valve trains
  • Generated reports detailing findings and recommendations.
  • Organise daily works and liaise with clients
  • Monitored workflow to improve employee time management and increase productivity.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Identified unsafe or unhealthful workplace conditions or hazards to enforce safe work practices and procedures.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Delivered services to customer locations within specific timeframes.

Leading Hand Carpenter

Niepe
04.2022 - 06.2023

Carpenter/Dogman


  • Read and interpreted blueprints and construction documents to determine project directives.
  • Ensured compliance with building codes and regulations through diligent adherence to industry best practices and guidelines.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Expedited project timelines by efficiently prioritizing tasks and managing resources effectively.
  • 20+ 22 tonne Franna & 130 + Slew Crane
  • Collaborated closely with architects, engineers, and other trades professionals to deliver cohesive project outcomes aligned with client expectations.
  • Managed inventory of tools, supplies and equipment.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Demonstrated strong organizational and time management skills while managing multiple projects.

Supervisor

APMSS
12.2021 - 04.2022


  • Tank floor replacement and inspections
  • Major shutdown coordinations
  • Generate permits and work packs for work crews
  • Generated reports detailing findings and recommendations.
  • Devised and implemented processes and procedures to streamline operations.
  • Oversaw daily operations of the department, ensuring smooth workflow and timely completion of tasks.
  • Inspect all isolations and safety gear
  • Communicate with plant operations and adjacent contractors
  • Identified operational inefficiencies and implemented corrective measures, leading to an overall increase in effectiveness.
  • Gained strong leadership skills by managing projects from start to finish.

Carpenter

Heinrich Constructions Pty
04.2020 - 12.2021

Queens Wharf Casino Project

  • Carpenter/Dogman
  • Dile capping, basement structures through to level 32
  • Conventional formwork and barrier screens, tower cranes and mobile cranes
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Facilitated harmonious working relationships with crew members to prevent problems and conflicts.
  • Followed established job site safety regulations and maintained safe and clean work area.

Fitter

APMSS
01.2020 - 04.2020

Fitter TA/Dogman Rigger

  • Work in highly hazardous areas, using B/A
  • Cleaning and inspecting storage tanks
  • Lock on to isolations and comply with permit procedures
  • Developed safe and efficient workflows for construction projects.
  • Decommission pumps and replace pipework
  • Punch list and commission plant for operations
  • Measured, marked, cut, bored, fitted and installed various piping or structural components in accordance with blueprints and job specifications using hand and power tools.

Trades Assistant

Monodelphous
09.2019 - 12.2019

Mechanical TA/Dogman

  • 20 tonne franna, 250 rought terrrain crane
  • Unload and bolt mechanical components together
  • Torque, flange management and tagging
  • Stainless steel press fit service lines
  • Formwork and structural grouting
  • Compressor pump installation
  • Make furnishings and mobilisation
  • Performed maintenance and minor repairs to various machines under supervision.

Carpenter

Adcon
07.2019 - 09.2019

Carpenter/Rigger

  • Level 3 carpark underground with ramps and pump station
  • Build jumpform, walls, curves columns, large beams and stairs
  • Level safe work screens
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Planned projects by identifying necessary equipment, tools, and required assistance.

Fitter

APMSS
04.2019 - 06.2019

Fitter/Dogman


  • Check isolations
  • Complete permits, air and oxygen level testing
  • Working in hazardous areas wearing full chemical suits and breathing apparatus to break apart pipework and install new pipework
  • Clean sulphur boilers and check lines
  • Repair stacks, dampeners and ducts
  • Clean and inspect acid storage tanks

Leading Hand

John Holland Group
12.2018 - 04.2019

Sunshine Coast Airport Expansion

Leading Hand/Formwork/Steel Fixing


  • Mark out excavations
  • Establish RL
  • Pour Blinding
  • Edgeboards
  • Apron slabs rebates for box culverts
  • Wing Walls
  • Tie Steel
  • Place and screed concrete to height
  • Mix grout and land box culverts
  • Organise crew for daily works and report to supervisor
  • Keep work area clean and safe


Formwork Carpenter

Heinrich Constructions Pty
01.2018 - 12.2018

Formwork/Dogman


  • Conventional framing for beams and class 1 decks
  • Ishuebeck system for decks, columns, lift shafts, shearwalls, updstand walls, up turnbeams, ramps, kerbs, falsework
  • Liffting shutters with small crane

Formwork Carpenter

Bossform
11.2015 - 01.2018
  • General formwork
  • Table forming
  • Framework
  • Decking
  • Installing generators, water pumps and pipework
  • Staircores lift shafts
  • Upstandwalls jug handle ramps
  • Shear Walls
  • Columns
  • Kirbing
  • All conventional formwork
  • Laser levelling
  • Managed inventory of tools, supplies and equipment.
  • Communicated daily with job site supervisor to discuss milestones and update project schedule.

Mechanical Fitter

Fluor Construction
09.2013 - 07.2014

Mechanical Fitter / Hydrostatic/Pneumatic Testing


  • Navigate maps and comply with State and SANTOS road rules to locate well pads
  • Check pipe work with drawings
  • Organise and be responsible for working under Green or Brownfields permits, monitoring gas dectectors
  • Interpret P&I drawings Isometric plans, piping test packs to identify pipe spools for testing,
  • Pneumatic leak tests on seperators Set up manifolds and gauges for testing
  • Dismantle and remove spools, preservation,Rigging and lifting spools and valves with crane
  • Inspect flange faces,gaskets and fittings
  • Prep and clean pipes for welding
  • Bolt and torque blinds to spools, flange management
  • Prestart all pumps and mechanical equipment
  • Fill test with water and bleed air , pressurize and check for leaks
  • Reinstate pipework torque and tag
  • Prep and paint pipes
  • Flange management
  • Commissioning /isolations
  • Attend daily prestarts and weekly toolbox meetings
  • Record all data from test using Chrystal Guage,
  • Keep crew trucks clean and complete weed declerations

Mechanical Fitter

Downer Engineering
12.2012 - 08.2013
  • Interperate site and engineers plans for footings ,slabs,plinths and colums,build formwork, tie in reinforcing steel and cages with holddown bolts,establish heights off an RL,pour and finish concrete,
  • Install strusctural steel,pipe racks and torque bolts
  • Design, fabricate and install site run S/S mapress pipe system, from existing diesel farm through existing processing plant and controlled areas to holding tanks in the concentrator area,
  • Shutdown diesel service to mine, disamble existing spools reinstate new bolt up spools ,valves , gates and actuaters, assist with pipe support fabrication,
  • Liase with mine operations and area supervisers to co ordinate area shut downs and permits with safety rescue plans in controlled radiation areas, to install pipework and supports,
  • Install and fabricate screwed and pressfit pipe (blucher nova press) , from isometric drawings, connecting pumps to holding tanks, sumps, boilers and compressors
  • Isolations for commissioning,hydrotesting and punch list items, bolt on ai instrumentation,
  • Attend ,daily prestarts , weekly toolbox meetings , workers representative for project improvments,at meetings with construction and project managers, write JHA’s for areas and specific tasks, report to supervisor
  • Complied with Rio Tinto and ERA site policies and procedures,

Mechanical Fitter

Downer Engineering
05.2012 - 12.2012
  • Pipe Fitting, Rigging and installation of associated pumps, pipe work and structural steel modules in the tailings processing area of the CHPP plant
  • Site run of S/S Victaulic and Rolled Grooved piping and associated pipe supports
  • Fabrication and installation of screwed service lines, Air, Water, Fire
  • Involved with construction of Tailing and Coal Thickener Tanks and vessels
  • Torqueing of pipework during punch listing stage of project
  • Working at heights
  • Working off isometric drawing while punch listing of piping systems
  • Flange management
  • Commissioning
  • Attend weekly toolbox meeting
  • Involved in the construction of work method statements and JHA’s for task
  • Report to supervisor
  • Complied with BMA and Bechtel site policies and procedures

Formwork Carpenter

John Holland Airport Link Tunnel
04.2009 - 04.2012
  • Responsible for the construction of the Jacking Box (World’s Largest Construction) including Blade/Shield Walls and Mining Box
  • Erecting of Peri formwork, RMD formwork and conventional formwork
  • Pouring of concrete
  • Flange management
  • Isolations
  • Hotbolting
  • Pressure testing
  • Commissioning
  • Attend morning toolbox meetings
  • Pre starts
  • Completion of all associated paperwork including timesheets in a timely and efficient manner
  • Report to supervisor
  • Compliance with occupational health and safety regulations in accordance with Thiess/John Holland guidelines, policies and procedures

Carpenter

GNB Builders
01.2009 - 06.2009
  • Responsible for all aspects of carpentry for the construction of Kenya 1 (800 pax) and Kenya 2 (1000 pax) accommodation camp at Windabri gas fields
  • Site setout
  • Attend morning toolbox meetings
  • Installation of water pipes
  • Spotting for excavator and bobcat operators
  • Construction of footings and slabs for pipe stands and compressors
  • Construction of kitchens, all decking around dongers and offices
  • Compliance with occupational health and safety regulations whilst onsite

Owner/Operator

C Mitchell Carpentry
02.2003 - 01.2009
  • Responsible for the construction and renovations of domestic properties including luxury homes and replication of new set house on a macadamia farm
  • Liaise with architect, clients and other tradespersons
  • Measure supply and fit pipework for water extraction and services ,,flange management
  • Provision of quotations and estimations
  • Ordering of materials and equipment
  • Setting out and framework
  • Landscaping
  • Oversee all works including excavations
  • Compliance with occupational health and safety regulations whilst onsite

Education

Certificate III - Construction And Carpentry

TAFE Queensland - Bremer QLD
Bremer, QLD
04.2003

Skills

  • Thorough knowledge of occupational health and safety regulations and how they apply within the work environment
  • The ability to conduct and complete hazard identification and risk assessment
  • Excellent interpersonal and communication skills
  • Able to negotiate at all levels of management
  • Readily adapts to an ever changing working environment Fully adept in the use of a wide range of air, power and hand tools
  • Rapidly acquires new skills allowing me to become an effective and efficient team member within a short period of time
  • Capable of handling multiple tasks and communicating effectively with all levels of management, clients and staff
  • Well developed time management and organisational skills

Certification

  • Perform High Risk Work
  • Working at Heights
  • EWP - Elevated Work Platform
  • DG - Dogman
  • RB - Basic Rigger
  • Confined Space/Breathing apperatus and resuce
  • Forklift
  • Fire Trained
  • Senior First Aid
  • 30125 Course in General Safety Induction (Construction Industry)
  • Gas Atmosphere
  • 4x4
  • Health & Safety Rep Trained
  • Ultra High Pressure Water Blaster Operator permit, authority trained

Timeline

Supervisor

Icbs
06.2023 - Current

Leading Hand Carpenter

Niepe
04.2022 - 06.2023

Supervisor

APMSS
12.2021 - 04.2022

Carpenter

Heinrich Constructions Pty
04.2020 - 12.2021

Fitter

APMSS
01.2020 - 04.2020

Trades Assistant

Monodelphous
09.2019 - 12.2019

Carpenter

Adcon
07.2019 - 09.2019

Fitter

APMSS
04.2019 - 06.2019

Leading Hand

John Holland Group
12.2018 - 04.2019

Formwork Carpenter

Heinrich Constructions Pty
01.2018 - 12.2018

Formwork Carpenter

Bossform
11.2015 - 01.2018

Mechanical Fitter

Fluor Construction
09.2013 - 07.2014

Mechanical Fitter

Downer Engineering
12.2012 - 08.2013

Mechanical Fitter

Downer Engineering
05.2012 - 12.2012

Formwork Carpenter

John Holland Airport Link Tunnel
04.2009 - 04.2012

Carpenter

GNB Builders
01.2009 - 06.2009

Owner/Operator

C Mitchell Carpentry
02.2003 - 01.2009

Certificate III - Construction And Carpentry

TAFE Queensland - Bremer QLD
Cheynne Mitchell