Overview
Work History
Timeline
Generic

Christopher Parkes

Perth,WA

Overview

23
23
years of professional experience

Work History

Rail Network Specialist

Rio Tinto Iron Ore
Perth, WA
11.2018 - Current
  • My primary role as a Network Specialist is the efficient running of the rail network to achieve the daily production and track maintenance plans
  • Leading the Train Control team in the Planning and Safe Production area and being accountable for coordinating the system for best throughput
  • Develop and communicate tactics and production priorities and oversee the efficient execution by the Train Controllers
  • Leading the deviation management for any major faults and system failures and liaising with relevant stakeholders to minimise production impacts
  • My role as Network Specialist is instrumental in mentoring Train Controllers in sharing my system knowledge and strategies and being an important information source to provide Subject Matter Expert advice for various projects and business improvement initiatives.

Train Controller

Rio Tinto Iron Ore
Perth, WA
01.2010 - 11.2018
  • As a Train controller I worked in centralised train operation centre
  • I worked in a team to monitor and control the safe movements of trains remotely
  • Monitoring train driver and track maintenance personnel sign on/off times
  • Issued safe working instructions to field teams and train drivers regarding any Network activities and train movements
  • As a controller I used sophisticated computer systems and specialised signalling and communications equipment.

Maintainer/Operator Technician

Speno Rail Maintenance
Karratha, WA
09.2001 - 07.2008
  • I worked a 2 on 1 off, Roster, 7-day shifts, 7-night shifts, operating the rail grinding machine and maintenance
  • Enhanced safety standards by strictly adhering to company guidelines and conducting thorough equipment inspections
  • Contributed to a positive work environment by fostering open communication among team members and addressing concerns promptly
  • Assisted in achieving production goals by consistently meeting deadlines and maintaining high-quality output
  • Collaborated with team members to troubleshoot issues, ensuring minimal downtime and maintaining productivity
  • Delivered exceptional results, consistently meeting or exceeding production targets while maintaining strict adherence to safety protocols.

Timeline

Rail Network Specialist

Rio Tinto Iron Ore
11.2018 - Current

Train Controller

Rio Tinto Iron Ore
01.2010 - 11.2018

Maintainer/Operator Technician

Speno Rail Maintenance
09.2001 - 07.2008
Christopher Parkes