Working on and offsite with significant expertise in overseeing projects and ensuring timely delivery. Skilled in strategic planning, budget management, and risk assessment.
Strong focus on team collaboration, results-driven environment, and adapting to changing needs. Known for reliability, leadership, and effective communication.
Overview
7
7
years of professional experience
Work History
Project Manager/Water Restoration Technician
Ethos Building and Restoration
03.2025 - Current
Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
Planned, designed, and scheduled phases for projects.
Met project deadlines while keeping build quality and workplace safety.
Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
Monitored progress, adjusting schedules when necessary and resources as needed to keep projects on track.
Creating scopes by establishing clear boundaries on requested changes while keeping projects aligned with original objectives and budgets.
Maintained accurate records of all work performed, ensuring proper documentation for audits or inspections when necessary.
Install drying equipment and monitor moisture levels
Mitigate water ingress
Labourer/ Water Restoration Technician
Amrick/ Boongalla Group
10.2020 - 12.2023
Plaster works.
Caulking building exteriors, windows, doors, skirtings and wet areas with quality materials.
Paint surfaces using brushes, spray guns, and paint rollers.
Ability to conduct water restoration projects.
Moisture mapping.
Inspect building materials.
Install drying equipment.
Mitigate water ingress.
Monitor drying works.
Refurbish areas.
Set up engineering controls.
Remove mould effected building materials.
Conduct fire restoration projects.
Conduct microbial re-mediation projects.
Conduct bacterial re-mediation projects.
Inspect OHS on site.
Respond to emergency service calls per On-call rotation schedule.
Demolition.
Oversee sub-contractors works.
Electrical Team
Exponet
10.2019 - 03.2020
Company Overview: (Previously worked with the same company in a different location)
(Previously worked with the same company in a different location)
Electrical TA
Davis Contracting
04.2019 - 10.2019
Processing incoming stock.
Stock counts.
Building and installing equipment.
Labelling for cables.
Rolling and pulling 3 phase cables.
Clipping cables.
Housekeeping.
Printing plans.
Variety of power/hand tools used.
Trenching.
Assisting with electrical installations.
Cable works.
CPR and LVR training received for this role.
Driving equipment to different location on the solar farm.
Adherence to health and safety requirements always and helping to maintain and improve safety standards across the solar plants.
Carry out reactive maintenance, fault diagnosis and resolution in a timely manner.
Worked well in a team setting, providing support and guidance.
Electrical Team
Exponet
05.2018 - 08.2018
Installation of temporary power.
Internal and external work for event installation.
Installing high power LED lighting systems.
3 Phase installation including flat cables under carpet to prevent trip hazards for exhibitors.
Using 10AMP and 15AMP cables after determining the power usage for equipment.
On call for any issues at the event.
Installing switchboards.
Testing and tagging of electronic equipment.
Installing festoon lighting.
Completing customer order and amendments.
Building scaffolding.
Fly in fly out to on occasion to other states in Australia.
Using electrical order diagrams to make sure the relevant power is going to the correct customer.