
Safety focused licensed advanced rigger with up to 19 years
experience in construction and mine site maintenance. In search of a new opportunity My skillset includes hands on proven ability on large scale projects conducting heavy and dual crane lifting ,techniques. Proven ability to manage complex SMP Rigging operations and ensure safety and compliance.
Proficiency in telehandler and Franna operations supporting mine site logistics and Dual crane lifts Erect and Dismantle Diverse Scaffold systems includibg Etect quick stage scaffolds inside confined space vessels A multi-skilled and diligent team player i possess strong technical and problem solving skills with the ability to work in remote areas under challenging conditions with the flexibility to work various shifts adhering to OH&S standards Policies and Procedures and a %100 focus on safety engaging in courageous conversations.
(RESPOSIBILITIES-
RESPONSIBILITIES
Piping and mechanicle rigging
monkey load into position in piperack, communicate instructions to work group for successful completion of task.
Lift large bore pipes onto pipe stands and join pipes ready for boilermakers
RESPONSIBILITIES
RESPOSIBILITIES
RESPONSIBILITIES
pipeline project, slurry pipeline and return water pipeline large bore pipe install .
RESPOSIBILIYIES
RESPONSIBILITIES
Pre Shut activities - train one and train two modules, MR and PR compressor decks and STG combined power power plant.
RESPONSIBILITIES
Maintenance and shutdown support
RESPONSIBILITIES
Remove and Reinstall pipes with chainblocks
RESPONSIBILITIES
SCM21 Deconstruct / Reconstruct - Smelter building shutdown works
RESPONSIBILITIES
MR compressor deck Frame 7 Change Out
PR compressor deck Hot Gas Path Inspection -
RESPONSIBILITIES
Walkway Tunnel Assembly -
RESPONSIBILITIES
(OHP)
(NPI)
RESPONSIBILITIES
Eliwana
RESPONSIBILITIES
Shutdown maintenance -
Pre works - install chainblocks ready for load transfer
- Dogman 20 ton franna mobilise structural steel to job front.
- Remove and install pipe bracing transferring load from crane hook to chain blocks - - - 220 Ton all terrain crane - remove / reinstall head chute from conveyor
- high pressure water blast to descale Thickener tank
- Assist knife gate install using gantry crane
- TA for boilermakers
structural 004 crew
RESPONSIBILITIES:
Steel Erection, mechanical and piping rigging
Dom Gas line blowing and Reinstatement crew -
Dom Gas reinstatement
Train 2 and Dom Gas compressor deck roof crew
RESPONSIBILITIES
120ton All Terrain Crane conduct lifts, Co-ordinate and unload trucks
PGA GOLF PROFESSIONAL FULL MEMBER 2002 LEVEL 3 COACH