Safety focused licensed advanced rigger with up to 19 years

experience in construction and mine site maintenance. In search of a new opportunity My skillset includes hands on proven ability on large scale projects conducting heavy and dual crane lifting ,techniques. Proven ability to manage complex SMP Rigging operations and ensure safety and compliance.

Proficiency in telehandler and Franna operations supporting mine site logistics and Dual crane lifts Erect and Dismantle Diverse Scaffold systems includibg Etect quick stage scaffolds inside confined space vessels A multi-skilled and diligent team player i possess strong technical and problem solving skills with the ability to work in remote areas under challenging conditions with the flexibility to work various shifts adhering to OH&S standards Policies and Procedures and a %100 focus on safety engaging in courageous conversations.

Overview

13
13
years of professional experience

Work History

Adv Rigger/Adv Scaffolder

ALTRAD SERVICES APAC
12.2024 - 04.2025

  • Executed core crew coverage of live plant and GTG3 Hot Gas Path rigging and scaffolding support
  • Erect / Dismantle Quick Stage scaffold inside confined space vessel
  • Dogman for 20 ton franna lift and safely transport loads throughout site,
  • conduct lifts with 120 ton crane Lift and safely place filter disposal containers adjacent to GTG3 mid level platform for safe removal of filters.
  • Remove / install PSV’s and Actuators from inside modules using chainblocks
  • -Transformer Extraction pre works, Demarcation and Set up 220 ton crane
  • Lift and install structural support beams
  • Extract Transformer from substation using come alongs to within Radius of 220 ton crane.
  • -Conduct heavy lift of 32 ton transformer safely onto trailer and sexure for transport.
  • GTG3 Hot Gas Path Inspection rigging team member in the Romavall and storage of Chutes, panels, Turbine components & structural steel
  • Lift 34 ton Rotar from turbine and place securely into frame
  • - Conduct dual crane lifting operations with 20 ton franna and gantry crane - lift and Ritate 9 ton turbine components onto flatracks at GTG3 loading bay
  • Area 12 Workshop -conduct lifts with 20T franna Lift and rotate turbine parts for cleaning maintenance and transport,
  • Ensured compliance with OSHA regulations by implementing safe work practices at all times during rigging operations.
  • Assisted in the development of lift plans, considering factors such as load weights, rigging capacities, and crane positioning.

Rigger (Shutdowns)

FREO GROUP PTY LTD
09.2024 - 12.2024

(RESPOSIBILITIES-

  • Port Hedland Port Authority MOF– Lift 20 meter 30 ton large bore pipes onto truck, secure load for transport to laydown yard remove pipes and store for demobe in laydown yard
  • Northern Star Gold Mine Dogman 25 ton franna Lift ball mill liners, tooling and machinery onto ball mill deck
  • Mineral Resources Bald Hill 90 ton crane - pump maintenance in Situa ifts as required, remove and reinstall pumps, change out screens, install cyclones and general lifts scaff stillages, lifting cage, redundant materials
  • South Flank Area C 25 ton franna - remove and reinstall 5 ton drive motor for stacker reclaimer
  • Whaleback 750 ton crane heavy lifts - remove crusher, chute and bin liners,
  • 120 ton all terrain crane general lifts removre tooling and rolller frames from top level of conveyor

Adv Rigger /Adv Scaff

ALTRAD
11.2023 - 05.2024

RESPONSIBILITIES

Piping and mechanicle rigging

  • Pre works for Large bore Pipe install
  • scope task and install chain blocks into correct position in piperack
  • Set up crane and rigging configeration and conduct test lift
  • Lift and rotate load into correct orientation using chain blocks, slew load to entrance of piperack, transfer load from crane hook to chainblocks,

monkey load into position in piperack, communicate instructions to work group for successful completion of task.

  • Remove & Install valves and blinds
  • nstall compressor (80 ton crane)
  • Dogman 25ton franna lift and safely transport loads throughout site,

Lift large bore pipes onto pipe stands and join pipes ready for boilermakers

  • Assist Erect and dismantle tube and clip scaffolds

Advanced Rigger (Shutdown Support)

MONADELPHOUS
09.2023 - 11.2023

RESPONSIBILITIES

  • remove / reinstall dust suppression chutes with chainblocks
  • remove and reinstall Drive Motor for stacker reclaimer with 120 ton crane
  • assist with reworks for train rail welding machine using chain blocks and 80 ton crane

Advanced Rigger/Scaffolder (Shutdown)

KAEFER
04.2023 - 08.2023

RESPOSIBILITIES

  • Pre shut works Conduct Visual assessmemt of all shutdown rigging job scopes with supervision team and discuss methodology
  • set up job fronts with rigging, structural steel for letdown station, crane lifts for scaff gear
  • assist mech fitters with installation and removal of hi torque tensioning equipment,
  • ift and rotate 5 ton spool with 25 ton franna and chain blocks and place into frame
  • operate 2.5ton and 4ton telehandler load and unload trucks, attach jib attachment and lift valves into tight locations
  • et up job fronts for work groups with tooling, machinery, rigging
  • Assist workgroups with Housekeeping upon completion of tasks
  • emove / reinstall 6 ton valve
  • 85 ton tube bundle rigging support removal and reinstall 6 ton spooll, visually Scope task with rigging team, discuss methodology, source correct rigging gear, Collaborate with rope access for rigging install, emove 6 ton elbow beneath Tube Bundle with chain blocks
  • descale inside tube bundle with high pressure water cleaner
  • Heat Exchanger Structural integrity upgrade with 200 ton crane and chain blocks
  • Remove / reinstall gridmesh, install brackets, braces and beams

Advanced Rigger (Short Term Contract)

MONADELPHOUS
02.2023 - 04.2023

RESPONSIBILITIES

pipeline project, slurry pipeline and return water pipeline large bore pipe install .

  • pre works set up job front with correct tooling, compressor, Generator and bolts for task.
  • positive communication with excavator operators into position
  • mplement correct rigging practices for pipeline install
  • Conduct dual lifts with excavators connect pipe flange faces and secure
  • Install bolts and tension with pneumatic rattle gun
  • assist fitters clean flange faces prior to install
  • assist fitters in the use of hi torque equipment tension bolts to spec
  • general housekeeping.

Advanced Rigger (Shutdown Support)

KARRIDALE GROUP PTY LTD
09.2022 - 01.2023

RESPOSIBILIYIES

  • Provided advanced rigging support during shutdown activities at the Karara mining site.
  • Performed dogman duties to facilitate general crane lifts in accordance with safety procedures.
  • Assisted in the safe removal of cyclones as part of scheduled maintenance operations.
  • Removed and reinstalled critical components including launders, pumps, and spools.

Advanced Rigger (Shutdown Train 1)

SKOUT SOLUTIONS (VENTIA)
04.2022 - 08.2022

RESPONSIBILITIES

Pre Shut activities - train one and train two modules, MR and PR compressor decks and STG combined power power plant.

  • conduct visual inspections of mechanical rigging job scopes
  • Capture job scope item location and document methodology, conduct lift studies to ensure safe rigging practices and rigging gear, mobilise rigging gear to job front,
  • Lift rigging gear to job front with 80 ton crane and 25 ton franna
  • install rigging gear where applicable, collaborate with rope access team to implement rigging ready for shutdown execution
  • Remove / replace spools, PSV's, Actuators, End caps, blinds, spades, strainers, overhaul of Biffi actuators for O ring change out including end plate and cylinder removal.
  • permit acceptor - collect permits from permit office conduct safe work checks implementing ISSO2 procedures, continuous monitor of PGM gas testing at job front, communicate with Area Authority prior to commencing tasks with information and awareness of any new localised hazards

Advanced Rigger (Shutdown Support)

TAYLORS ENGINEERING & WELDING SERVICES
11.2021 - 12.2021

RESPONSIBILITIES

Maintenance and shutdown support

  • remove and reinstall blades from shaft inside tank using chainblocks
  • conduct vrane lifts 80 ton crane - Remove / reinstall shaft from inside tank, install large bore pipe for tailings dam, remove / reinstall spools
  • steel erection stick build module for pilot plant.
  • Dogman 25 ton franna lift and rotate raker arm, pump maintenance lifts as required
  • Operate forklift

Advanced Rigger (Shutdown)

AGC | AUSGROUP | MAS
09.2021 - 10.2021

RESPONSIBILITIES

  • Preworks - Visual scope of task and install chain blocks into correct position and remove manway covers and blinds, r
  • replace psvs on top of NA module
  • 120 ton crane lifts - remove / reinstall structural beams, 3 ton spooll
  • Install 5 ton Elbow onto top of vessel install bolts and assist fitters to tension bolts with hi torque
  • Install KBSS Grammaphone machinery to flange face with chain blocks.

Remove and Reinstall pipes with chainblocks

  • dogman - Mach 25 ton franna nstall and remove high-torque equipment For fitters,

Advanced Rigger (shutdown)

MONADELPHOUS
07.2021 - 08.2021

RESPONSIBILITIES

SCM21 Deconstruct / Reconstruct - Smelter building shutdown works

  • install working at heights gear,
  • emove pipe bracing, handrails & columns
  • install platforms using 120 ton slew crane and chain blocks
  • Install rail beams for smelter removal using chain blocks & pull lifts
  • erect dribble chute in laydown yard, mobilise chute to gantry crane lift zone, Transfer dribble chute from gantry crane to chain blocks for install

Advanced Rigger (Shutdown Train 2)

SKOUT SOLUTIONS (VENTIA)
04.2021 - 06.2021
  • Inpex LNG Train two Major Turnaround

RESPONSIBILITIES

  • Pre Shut - Assist set up of Rigging and tool store compound,
  • Dogman for 25ton franna - lift containers into position
  • Operate 16 ton forklift
  • Set up 120 ton all terrain crane and conduct crane lifts various locations around site scaff stillages and tooling

MR compressor deck Frame 7 Change Out

  • involved in successful completion of Dual gantry crane heavy lift 109 Ton (frame 7 change out A WORLD FIRST)
  • Pre works - removal of fire suppression unit panels, piping, turbine housing,
  • Assist with mobilise loads to lifting bay and to grade for storage
  • Assist with setting up test lift for 107ton dual gantry cranes prior to 107 ton frame 7 change out.

PR compressor deck Hot Gas Path Inspection -

  • assist with removal of turbine components with gantry crane and chainblocks
  • secure and barricade lift zone and assist with mobilising loads to loading bay,
  • Conduct crane lifts with 25 ton franna or gantry crane and safely lift loads to ground level for storage
  • Operate forklift- lift and safely store turbine parts and machinery
  • Set up and maintain PR deck rigging gear
  • Housekeeping
  • Assist scaffolders dismantle scaffolds

Advanced Rigger

CPB CONTRACTORS
02.2021 - 03.2021

RESPONSIBILITIES

Walkway Tunnel Assembly -

  • install panels together into large sections and lift into position, bolt out tunnel assembly and tension bolts
  • General Lifts - 80 ton crane unload rio bar from trucks, Lift Compressors, generators, Form work into position


Advanced Rigger/Dogman

CLOUGH
10.2020 - 01.2021

RESPONSIBILITIES

(OHP)

  • 25ton franna Dogman - lift and safely transport loads throughout site such as transport steel, heavy lift spreader bars and rigging.
  • Load & Unload trucks unload containers, install pumps at water pond,
  • Conduct lifts with franna for transfer station module
  • ROM pad Erect conveyor section and install rollers
  • general housekeeping

(NPI)

  • Gantry crane structural integrity Upgrade -
  • pre works -demarcation for install of brackets onto columns
  • Mag Drill bo;t holes, install brackets and secure
  • locate tag and mobilise structural Braces within radius for crane lifts.
  • Install structural bracing using Spider crane and chain blocks and, tension bolts
  • Assist boilermakers with reworks

Advanced Rigger

CIVMEC
09.2020 - 10.2020

RESPONSIBILITIES

Eliwana

  • 200ton crawler - Lift and safely travel with 44meter conveyor sections place load into radius for Install
  • 500 ton crawler - conduct heavy lift 44 meter Gallery and install with surveyor, install shims and secure load
  • 200 ton crawler Install 99 ton crusher and realign ith come alongs
  • Plan and document heavy lift methodology and submit lift study
  • punch list items - install and align gridmesh, kickplates and handrails

Advanced Rigger (Shutdown)

MONADELPHOUS
08.2020 - 08.2020

RESPONSIBILITIES

Shutdown maintenance -

Pre works - install chainblocks ready for load transfer

- Dogman 20 ton franna mobilise structural steel to job front.

- Remove and install pipe bracing transferring load from crane hook to chain blocks - - - 220 Ton all terrain crane - remove / reinstall head chute from conveyor

- high pressure water blast to descale Thickener tank

- Assist knife gate install using gantry crane

- TA for boilermakers

TRAVEL AND RECONNECT WITH FAMILY AND FRIENDS

TRAVEL, R & R AND PERSONAL DEVELOPMENT
08.2018 - 07.2020

Advanced Rigger

BECHTEL
01.2015 - 07.2018

structural 004 crew

RESPONSIBILITIES:

Steel Erection, mechanical and piping rigging

  • Erect modules walkways and platforms in Laydown yard ready for transport to job fronts. (100 ton crawler)
  • Install platforms walkways and modules for Heavy Removals Column, CO2 Absorber, Solvent Regen, Oxidiser Heat Exchanger vessels WHRU (cold box) Fin Fan modules, and compressor decks
  • Stick build Staircase access for fin fan modules and compressor decks
  • Train one compressor deck install columns and secure with rigging to concrete blocks
  • Conduct Heavy lifts Install Roof Truss to columns.
  • Remove shipping steel with 20 ton franna and chain blocks ( modules transported from overseas)
  • nstall ladders for access with chainblocks
  • Yard Duties - Locate and tag structural steel, Gridmesh, kickplates and Handrail in laydown yard.
  • (80 ton crane and 20 ton franna) conduct dual lifts rotate chutes in mechanical laydown yard
  • Rigging store - Test and tag rigging and working at heights gear
  • install working at heights gear
  • Punch list items complete to spec - instal gates, remove / reinstall gridmesh for reworks, align gridmesh and secure with Hilti System.

Dom Gas line blowing and Reinstatement crew -

  • secure and barricade pipework line bllowing perimeter radio contact with work group prior to compressed air release

Dom Gas reinstatement

  • Removal and Reinstallation of Pipes, Valves and blinding ready for handover to commissioning

Train 2 and Dom Gas compressor deck roof crew

  • Complete steel erection infill steel braces and beems, bolt out structures and tension bolts
  • Crane lifts - roof mesh, roof sheets, tooling
  • assist roofing crew with install of roof sheets and downpipes, Install and maintain working at heights gear
  • general housekeeping

Advanced Rigger/Scaffolder/Franna & HR Truck Operator

ATCO STRUCTURES AND LOGISTICS
10.2013 - 12.2014

RESPONSIBILITIES

  • Operate 20ton and 25 ton franna load and unload trucks -machinery and parts, firewater tanks and pump, General lifts throughout site

120ton All Terrain Crane conduct lifts, Co-ordinate and unload trucks

  • Erect Bechtel Permanent Office Complex Medical Center, Training Facilities, Security Hut, Crib Rooms and Containers,
  • Involved in designing lift studies with Operator
  • Conduct heavy lift of 35ton weld rod room
  • Operate 9ton truck - secure and safely transport loads throughout site.
  • Erect and Dismantle scaffolds for roof access - Office complex, Cape Wharehouse, Training Facilities, Medical center,
  • Erect edge protection for roofing crew, install and maintain working at heights gear
  • Operate Water Cart for concrete crew and dust suppression

Advanced Rigger/Franna Operator

FORGE GROUP
07.2013 - 09.2013
  • Diesel storage tanks - install rafters, steel panels, gurts, roof petals, centre columns, stairways and platforms install weld machine for tank, (250 ton crawler , 70 ton rough terrain crane)
  • Operate 20 ton franna, conducting daily pre-starts, maintaining rigging gear, lifting and safely transporting loads throughout site, loading and unloading trucks, erecting scaffold platforms around tank.

Advanced Rigger/Franna Operator

FORGE GROUP
06.2012 - 06.2013
  • Steel erection build modules for central facility workshop, HVLV workshop, administration building, stores warehouse, explosives warehouse, light vehicle workshop, tyre maintenance, gas bottle storage and bulk lube storage, substations and transportables.
  • 130 ton all terrain crane and 70 ton Todano - Camp construction Lift and place 30 ton Dongas.
  • Operate 20 tonne Franna - Dual crane lift, Tail module for installation of HVLV workshop (130 tonne All Terrain Crane).
  • Lift and safely transport loads throughout site, load and unload trucks.
  • Erect and dismantle scaffolds.

Education

High School Diploma -

GRIFFITHS UNIVERSITY
01-2001

PGA GOLF PROFESSIONAL FULL MEMBER 2002 LEVEL 3 COACH

Skills

  • Advanced Rigging, Dogging & Lift Execution: Extensive experience in high-risk rigging, dogging and heavy lift operations using Franna, all-terrain, crawler and gantry cranes across shutdown and construction environments
  • Crane Operations & Load Management: Proficient in load transfer, dual crane lifts, and complex rigging setups including spreader bars, chain blocks, and monorail systems for structural and mechanical components
  • Structural, Mechanical & Piping Installation: Skilled in the installation and removal of structural steel, process piping, valves, pumps, spools, actuators and rotating equipment on major resource projects
  • Shutdown, Construction & Maintenance Works: Proven ability to deliver safe and timely rigging support across large-scale shutdowns, upgrades and plant maintenance projects in remote and offshore settings
  • Scaffolding & Access Systems: Competent in erecting and dismantling tube & clip, modular and quick-stage scaffolds, including confined space and elevated structures in accordance with site safety standards
  • Forklift & Telehandler Operation: Licenced and experienced in operating forklifts and telehandlers to safely transport piping, scaffold gear, containers and nitrogen purge systems across various terrains
  • Working at Heights & Confined Spaces: Fully trained and compliant with procedures for high-risk work areas, including confined spaces, elevated platforms, pressure vessels and exclusion zones
  • Safety, Compliance & Permit Procedures: Experienced SSO2W Permit Holder with demonstrated knowledge of hot/cold permit systems, gas testing, hazard identification and coordination with area authorities
  • Teamwork, Communication & Work Ethic: Strong interpersonal and communication skills with a professional, safety-focused attitude and the ability to collaborate effectively across multidisciplinary teams
  • Heavy Lift Rigging Configuration & Planning: Experienced in interpreting engineered lift studies and assembling customised heavy lift setups including spreader bars, lifting beams and dual crane operations
  • Mechanical Assistance & Equipment Handling: Skilled in supporting mechanical fitters with torque tensioning tools, valve changes, spool alignments, and general shutdown labour requirements
  • Equipment Inspection, Tagging & Compliance: Proficient in inspecting, testing and tagging rigging gear, scaffolding components and working-at-heights equipment in line with site and legislative standards

PROFESSIONAL DEVELOPMENT

  • USI number NUHRZHT8X8
  • HRWL WL702406
  • Fire Attack Fire Training Saferight 04/2025
  • W@H / Gas Test / Con Space Saferight 04/2024
  • EWP VOC STES 07/2024
  • Open Crane Skills Training
  • C6 Crane Construction Skills Training Centre
  • Advanced Rigging Construction Skills Training Centre
  • Dogging Construction Skills Training Center
  • Advanced Scaffolding Construction Skills Training Center
  • EWP Licence Construction Skills Training Centre
  • Inductions FMG, BHP WAIO & RIO, Barrow, Inpex
  • Forklift Licence IFAP
  • Telehandler Site Skills Training
  • Advanced Rigging Advanced Scaff VOC WA Skills Training 2024
  • Certificate I in OHS Australian National Training Authority
  • White Card Aveling 827791

Timeline

Adv Rigger/Adv Scaffolder - ALTRAD SERVICES APAC
12.2024 - 04.2025
Rigger (Shutdowns) - FREO GROUP PTY LTD
09.2024 - 12.2024
Adv Rigger /Adv Scaff - ALTRAD
11.2023 - 05.2024
Advanced Rigger (Shutdown Support) - MONADELPHOUS
09.2023 - 11.2023
Advanced Rigger/Scaffolder (Shutdown) - KAEFER
04.2023 - 08.2023
Advanced Rigger (Short Term Contract) - MONADELPHOUS
02.2023 - 04.2023
Advanced Rigger (Shutdown Support) - KARRIDALE GROUP PTY LTD
09.2022 - 01.2023
Advanced Rigger (Shutdown Train 1) - SKOUT SOLUTIONS (VENTIA)
04.2022 - 08.2022
Advanced Rigger (Shutdown Support) - TAYLORS ENGINEERING & WELDING SERVICES
11.2021 - 12.2021
Advanced Rigger (Shutdown) - AGC | AUSGROUP | MAS
09.2021 - 10.2021
Advanced Rigger (shutdown) - MONADELPHOUS
07.2021 - 08.2021
Advanced Rigger (Shutdown Train 2) - SKOUT SOLUTIONS (VENTIA)
04.2021 - 06.2021
Advanced Rigger - CPB CONTRACTORS
02.2021 - 03.2021
Advanced Rigger/Dogman - CLOUGH
10.2020 - 01.2021
Advanced Rigger - CIVMEC
09.2020 - 10.2020
Advanced Rigger (Shutdown) - MONADELPHOUS
08.2020 - 08.2020
TRAVEL AND RECONNECT WITH FAMILY AND FRIENDS - TRAVEL, R & R AND PERSONAL DEVELOPMENT
08.2018 - 07.2020
Advanced Rigger - BECHTEL
01.2015 - 07.2018
Advanced Rigger/Scaffolder/Franna & HR Truck Operator - ATCO STRUCTURES AND LOGISTICS
10.2013 - 12.2014
Advanced Rigger/Franna Operator - FORGE GROUP
07.2013 - 09.2013
Advanced Rigger/Franna Operator - FORGE GROUP
06.2012 - 06.2013
GRIFFITHS UNIVERSITY - High School Diploma,
Clinton Parnham