Experienced Turbine Technician with over 2 years in construction and around 4 months in maintenance/reworks. I am highly motivated and have a strong focus on continuous improvement and further development within the wind energy sector.
With a solid foundation in safety protocols and a commitment to industry standards, I consistently prioritise operational efficiency and safety across all tasks. My adaptability to new technologies and work environments has been key to my success in meeting the dynamic demands of the wind industry. Whether overseeing complex installations or conducting regular maintenance, I enjoy working as part of a team and am dedicated to ensuring project success and contributing to the growth of renewable energy solutions.
INSTALLATION TECHNICIAN (MacIntyre Wind Farm) January 2023 to Current
Professional Wind Services - Installation of Nordex Delta 4000 Turbines
MECHANICAL COMPLETIONS
• Performed mechanical tasks by work instructions, including the installation of rotor
guards and high-speed shaft covers
• Thoroughly cleaned and painted flanges to ensure high-quality finishes.
• Connected hydraulic hoses per manufacturer specifications
ECC CABLE PULL
• Prepared tower brackets and loop decks for cable pulling by project requirements
• Installed high-voltage cables within the tower as per work instructions
• Routed and secured low-voltage cables throughout the tower and basement areas
• Utilised appropriate lifting equipment and internal winch to transport tooling and
equipment to the nacelle.
PRE ASSEMBLY TOP TEAM
• Coordinated the arrival of tower sections and components, communicating
effectively with the crane operator to ensure safe and secure placement
• Applied precise torquing and stretching of bolts to specified values
• Managed the slinging of small equipment, tools, and components for lifting
operations
• Conducted tower cleaning and completed all necessary mechanical work before
walk-downs and inspections.
MAIN CRANE INSTALLATION TOP TEAM/GROUND TEAM
• Coordinated the delivery and installation of tower sections and components by
effectively communicating with crane operators to ensure safe and secure
placement.
• Performed precise torquing and bolt stretching to specified values in line with
technical requirements.
• Safely slung and prepared small equipment, tools, and components for lifting
operations.
• Conducted tower cleaning and completed mechanical tasks prior to walk-downs and
inspections.
• Prepared components meticulously before installation, adhering to project timelines.
Great individual & team worker
Time management
Organized
Motivated
Works well under pressure
Physically fit
DIDO / FIFO experience
Current GWO BST
• Rigging Basic
• EWP Operator License (BL) Boom Lift
• EWP Operator License (SL) Scissor Lift
RIIHAN309F – Conduct Telescopic Materials Handler Operations
• Construction Induction Safety Certificate (White Card)
• Current Australian Driver's License