Summary
Overview
Work History
Education
Skills
ABN
Timeline
Generic

Connor Gordon

Peakhurst

Summary

I am a driven young and fit ABN boilermaker subcontractor. I excel in delivering high-quality welds in all positions, showcasing my mastery in hand and power tools and structural steelwork. Renowned for fostering productive team environments and building strong client relationships, my work spans notable projects like the Sydney Luna Park upgrade, Sydney M4, M5 and

M12, emphasizing safety and precision.

Adaptable and reliable with strong attention to detail and safety. Solid understanding of blueprints and welding techniques, combined with skills in metal fabrication and assembly. Dedicated to ensuring optimal performance and efficiency in all projects.

Overview

5
5
years of professional experience

Work History

Boilermaker Subcontractor

Fleetwood Enterprises
09.2024 - Current
  • Maintained compliance with all safety procedures from both client and employer.
  • Upheld company reputation for excellence by consistently delivering high-quality workmanship that met or exceeded client and employer expectations.
  • Welding experience flat, horizontal, vertical, overhead, fluxcore, dualshield and all positional welding.
  • Maintained clean working environment by consistently organizing tools and equipment, promoting workplace safety.
  • Managed and motivated employees to be productive and engaged in work as a leading hand.
  • Developed strong working relationships with clients, vendors, and subcontractors for successful project collaborations

Boilermaker

ESS Engineering
01.2024 - 09.2024
  • Built and repaired process tanks, food storage tanks, conveyers, pipework and general fabrication.
  • Interpreted blueprints, sketches, and specifications for each job.
  • Developed strong working relationships with clients, vendors, and subcontractors for successful project collaborations.
  • Led safety meetings to educate workers on proper protocols, minimizing workplace hazards and injuries.

Boilermaker

ABFI Steel Group
08.2023 - 01.2024
  • Measured old structural parts or assemblies to determine dimensional requirements of parts, including heavy fabrication and forming techniques used.
  • Fabricated pipes for Australia wide projects including Hexam upgrade, Western Sydney M12 and Port of Brisbane cruise terminal

Boilermaker

HFH Constructables
01.2020 - 08.2023

Worked on projects such as:

Sydney Luna park upgrade

Cross river rail

multiple thickener tanks and feedwell shutdowns

multiple brigdes

Sydney M4 nd M5 upgrade

Education

Certificate III - Boilermaking

TAFE NSW
NSW
08-2023

Skills

  • Hand and power tools
  • Structural steelwork
  • Plasma cutting
  • Repair services
  • Pipefitting

ABN

27836840198

Timeline

Boilermaker Subcontractor

Fleetwood Enterprises
09.2024 - Current

Boilermaker

ESS Engineering
01.2024 - 09.2024

Boilermaker

ABFI Steel Group
08.2023 - 01.2024

Boilermaker

HFH Constructables
01.2020 - 08.2023

Certificate III - Boilermaking

TAFE NSW
Connor Gordon