Dynamic Plaster/Frame Builder with extensive experience at NT Construction industry, excelling in framework assembly and structural reinforcement. Proven ability to implement safety protocols and manage time effectively, ensuring high-quality project completion. Skilled in drywall installation and adept at collaborating with teams to achieve project goals efficiently.
Overview
20
20
years of professional experience
1
1
Certification
Work History
Plaster/Frame Builder
NT Linings
Darwin, Northern Territory
04.2025 - Current
Assembled and nailed together the framework of studs, headers and sills.
Fitted door jambs, window casings and other trim pieces using shims as necessary to level them correctly.
Attached insulation material between wall studs or ceiling joists to provide thermal protection.
Laid out patterns of interior partitions onto the floor before assembling the framing components that make up each partition wall.
Installed drywall, plasterboard or paneling over interior walls and ceilings.
Removed old framing components from buildings undergoing renovation work.
Reinforced structural elements with metal ties when required by local building codes.
Analyzed problematic installations and implemented appropriate solutions for quick remediation.
Completed tear-down of existing construction to prepare for new construction.
Analyzed blueprints and drawings to determine structural dimensions of framework.
Mixed mortar, plaster, and grout according to standard formulas.
Took accurate measurements to calculate size and amount of materials needed for project completion.
Verified trueness of construction using plumb and level.
Anchored and braced forms and other structures in place using nails, bolts, anchor rods, steel cables, planks, wedges and timbers.
Plaster/Framer
Hawkins and clements
Darwin, Northern Territory
05.2022 - 04.2025
Collaborated with team members on large scale projects requiring multiple workers.
Climbed ladders and scaffolding to reach roofs for inspection, repair, or installation.
Implemented safety protocols during every phase of the job process.
Installed underlayment, shingles, metal roofing systems, and other materials to construct roofs.
Performed preventive maintenance on tools and equipment used in job activities.
Removed old roof coverings in preparation for new installations.
Loaded and unloaded trucks with building materials required for each job site.
Measured and cut materials according to specifications with hand tools such as hammers, saws, chisels.
Worked safely and effectively under difficult conditions and completed projects under various kinds of weather.
Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
Created work crew schedules and delegated assignments.
Plaster/Gyprocker
DJM Interior Linings
Darwin, Northern Territory
05.2018 - 05.2022
Internal and external steel framing for walls and ceilings.
plasterboard/villaboard sheeting to walls and ceilings.
Worked collaboratively with other tradespeople on construction sites.
Measured and cut plasterboard to fit into walls or ceilings.
Adhered strictly to all building codes and regulations while performing the installation tasks.
Communicated effectively with supervisors and co-workers regarding project updates and timelines.
Trained team members in proper installation methods to meet project quality and efficiency standards.
Executive Officer to the Deputy Chief Executive at NT Regional Health Services, NT Health, NTGExecutive Officer to the Deputy Chief Executive at NT Regional Health Services, NT Health, NTG