Hardworking, reliable and efficient formwork carpenter. I have over 18 years experience in commercial construction, working on large-scale projects including, but not limited to:
- High rise apartment/office complexes
- Olympic size pools and aquatic centres
- Road bridges
- Shopping centres and car parks
I've attained multiple certificates relating to the industry, which help me to better understand the demands of each project.
Builder - Hacer
Project - Apartment Development
Role - Formwork Carpenter
Builder - John Holland
Project - Chadstone Shopping Centre Extension
Role - Formwork Carpenter
Builder - LendLease
Project - Frankston Hospital Redevelopment
Role - Formwork Carpenter
Builder - MPK
Project - CRWP Pipeline
Role - Polywelder
Builder - Ireland Brown Constructions
Project - Korowa Anglican Girls School
Role - Carpenter
- 8 Lane, 25M pool
- Part of a Sports and Wellbeing Centre upgrade
Builder - ADCO
Project - Brimbank Aquatic and Wellness Centre
Role - Leading Hand
- Olympic sized 50 M, 10 lane competition pool with access ramp
- 2 x water slides
- Leisure water/Learn to swim program pool
- Warm water program pool with adjoining spas
- Water play and splash pad
Builder - BJP Constructions
Project - Byron st Apartments
Role - Leading hand/Supervisor
- Multi level complex, including 10 Luxury apartments and underground parking
Builder - KANE Constructions Pty Ltd
Project - Northcote Aquatic and Recreation Centre
Role - Leading Hand
- Indoor 8 Lane 25m pool
- Indoor learn to swim/leisure pool
- Ramp entries to pools
- Indoor aquatic playground and toddler pool
- Indoor warm water hydrotherapy pool
- Outdoor 10 lane olympic sized 50m pool
- Outdoor nature aquatic playground
Builder - Construction Control
Project - Constitution Pl, ACT
- Apartment building and premium business project
Plan & Prepare:
- Follow instructions, interpret plans, specifications, quality requirements and operational details. Ensure documents are confirmed and include all relevant information for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Set out location of curtain wall installation connections to job drawings and specifications.
Installation:
- Install curtain wall fixing brackets to set out points in accordance with manufacturer specifications and site structural drawings.
- Install curtain walling plumb and level and aligned. Fix into position in accordance with specifications.
- Apply sealants to curtain walling and trims, where specified, in accordance with job specifications and relevant MSDS.
Required skills:
Communication skills -
- Determine requirements
- Enable clear and direct communication
- Use questioning to identify and confirm requirement
- Share information
- Listen and understand
- Follow instructions
Read and interpret -
- Documentation from a variety of sources
- Plans, specifications and drawings
- Report faults
Numeracy skills -
- Apply measurements and make calculations
Builder - ProBuild
Project - Westside Pl
- Luxury living complex in Melbourne's CBD
- Tallest hotel in the southern hemisphere
Having begun working on the project while it was in its foundational stage, my role and responsibilities evolved as was required
Ground slabs, Columns, Core, Walls, Framing, Decking:
Plan & Prepare:
- Follow instructions, interpret plans, specifications, quality requirements and operational details. Ensure documents are confirmed and include all relevant information for planning and preparation purpose
- Safety (OHS) requirements are followed in accordance with safety plans and policies
- Set out to job drawings and specifications
- Calculate material quantity requirements in accordance with plans, specifications and quality requirements
Installation:
- Installed plumb and level and aligned and fixed into position in accordance with specifications (columns were a combination of pre-fab steel column boxes and conventional in-situ shutters)
- Work with crane crew in accordance with safety requirements
- Curved shutters for carpark ramp
- Assist core crew with lock-ups and stripping
Manage Stair & Lobby crew:
Plan & Prepare:
- Interpret plans, specifications, quality requirements and operational details. Ensure documents are confirmed and include all relevant information for planning and preparation purpose
- Safety (OHS) requirements are followed in accordance with safety plans and policies
- Conduct daily toolbox meetings
- Regular JSA reviews
- Set out to job drawings and specifications
- Calculate material quantity requirements in accordance with plans, specifications and quality requirements
- Communicate with site Foreman
Installation:
- Conventional frame and deck landings according to plans and specifications
- Propping
- Install safety rails
- Maintain pour date record for back propping and stripping requirements
- Forward planning for distribution of manpower and rotation of materials
Required skills:
Communication skills -
- Determine requirements
- Enable clear and direct communication
- Use questioning to identify and confirm requirement
- Share information
- Listen and understand
- Follow instructions
Read and interpret -
- Documentation from a variety of sources
- Plans, specifications and drawings
- Report faults
Numeracy skills -
- Apply measurements and make calculations
2017/18
Builder: Hutchinson
Project: Oak Park Sports and Aquatic Centre, Oak Park VIC
2016/17
Builder: ADCO
Project: Splash Aqua Park and Leisure Centre, Craigieburn VIC
2015/16
Builder: ICON
Project: Adina Apartment Hotel
- Leadership
- Time management
- Decision making
- Competent in wide range of hand/power tools
- Active listening
- Attention to detail
- Problem solving
I enjoy an active lifestyle with my young family as well as maintaining a sound level of fitness.