Summary
Overview
Work History
Education
Skills
Hobbies: Camping, Fishing, Golf, Running & Gym
Timeline
Generic

Daniel Cranitch

Warragul

Summary

Hardworking, reliable and efficient formwork carpenter. I have over 18 years experience in commercial construction, working on large-scale projects including, but not limited to:

- High rise apartment/office complexes

- Olympic size pools and aquatic centres

- Road bridges

- Shopping centres and car parks

I've attained multiple certificates relating to the industry, which help me to better understand the demands of each project.

Overview

9
9
years of professional experience

Work History

Formwork Carpenter

I&D Group Pty Ltd
02.2023 - Current

Builder - Hacer

Project - Apartment Development

Role - Formwork Carpenter


Builder - John Holland

Project - Chadstone Shopping Centre Extension

Role - Formwork Carpenter


Builder - LendLease

Project - Frankston Hospital Redevelopment

Role - Formwork Carpenter



Polywelder

Utility Fusion
07.2022 - 02.2023

Builder - MPK

Project - CRWP Pipeline

Role - Polywelder

Leading Hand Carpenter/Supervisor

Mercav Constructions Pty Ltd
01.2021 - 07.2022

Builder - Ireland Brown Constructions

Project - Korowa Anglican Girls School

Role - Carpenter

- 8 Lane, 25M pool

- Part of a Sports and Wellbeing Centre upgrade

Builder - ADCO

Project - Brimbank Aquatic and Wellness Centre

Role - Leading Hand

- Olympic sized 50 M, 10 lane competition pool with access ramp

- 2 x water slides

- Leisure water/Learn to swim program pool

- Warm water program pool with adjoining spas

- Water play and splash pad

Builder - BJP Constructions

Project - Byron st Apartments

Role - Leading hand/Supervisor

- Multi level complex, including 10 Luxury apartments and underground parking

Builder - KANE Constructions Pty Ltd

Project - Northcote Aquatic and Recreation Centre

Role - Leading Hand

- Indoor 8 Lane 25m pool

- Indoor learn to swim/leisure pool

- Ramp entries to pools

- Indoor aquatic playground and toddler pool

- Indoor warm water hydrotherapy pool

- Outdoor 10 lane olympic sized 50m pool

- Outdoor nature aquatic playground

Carpenter

Aspire Facades
01.2020 - 12.2020

Builder - Construction Control

Project - Constitution Pl, ACT

- Apartment building and premium business project

Plan & Prepare:

- Follow instructions, interpret plans, specifications, quality requirements and operational details. Ensure documents are confirmed and include all relevant information for planning and preparation purposes.

- Safety (OHS) requirements are followed in accordance with safety plans and policies.

- Set out location of curtain wall installation connections to job drawings and specifications.

Installation:

- Install curtain wall fixing brackets to set out points in accordance with manufacturer specifications and site structural drawings.

- Install curtain walling plumb and level and aligned. Fix into position in accordance with specifications.

- Apply sealants to curtain walling and trims, where specified, in accordance with job specifications and relevant MSDS.

Required skills:

Communication skills -

- Determine requirements

- Enable clear and direct communication

- Use questioning to identify and confirm requirement

- Share information

- Listen and understand

- Follow instructions

Read and interpret -

- Documentation from a variety of sources

- Plans, specifications and drawings

- Report faults

Numeracy skills -

- Apply measurements and make calculations

Leading Hand Carpenter

I & D Group Pty Ltd
07.2018 - 11.2019

Builder - ProBuild

Project - Westside Pl

- Luxury living complex in Melbourne's CBD

- Tallest hotel in the southern hemisphere

Having begun working on the project while it was in its foundational stage, my role and responsibilities evolved as was required

Ground slabs, Columns, Core, Walls, Framing, Decking:

Plan & Prepare:

- Follow instructions, interpret plans, specifications, quality requirements and operational details. Ensure documents are confirmed and include all relevant information for planning and preparation purpose

- Safety (OHS) requirements are followed in accordance with safety plans and policies

- Set out to job drawings and specifications

- Calculate material quantity requirements in accordance with plans, specifications and quality requirements

Installation:

- Installed plumb and level and aligned and fixed into position in accordance with specifications (columns were a combination of pre-fab steel column boxes and conventional in-situ shutters)

- Work with crane crew in accordance with safety requirements

- Curved shutters for carpark ramp

- Assist core crew with lock-ups and stripping

Manage Stair & Lobby crew:

Plan & Prepare:

- Interpret plans, specifications, quality requirements and operational details. Ensure documents are confirmed and include all relevant information for planning and preparation purpose

- Safety (OHS) requirements are followed in accordance with safety plans and policies

- Conduct daily toolbox meetings

- Regular JSA reviews

- Set out to job drawings and specifications

- Calculate material quantity requirements in accordance with plans, specifications and quality requirements

- Communicate with site Foreman

Installation:

- Conventional frame and deck landings according to plans and specifications

- Propping

- Install safety rails

- Maintain pour date record for back propping and stripping requirements

- Forward planning for distribution of manpower and rotation of materials

Required skills:

Communication skills -

- Determine requirements

- Enable clear and direct communication

- Use questioning to identify and confirm requirement

- Share information

- Listen and understand

- Follow instructions

Read and interpret -

- Documentation from a variety of sources

- Plans, specifications and drawings

- Report faults

Numeracy skills -

- Apply measurements and make calculations

Carpenter

Mercav Constructions Pty Ltd
06.2015 - 07.2018

2017/18

Builder: Hutchinson

Project: Oak Park Sports and Aquatic Centre, Oak Park VIC

2016/17

Builder: ADCO

Project: Splash Aqua Park and Leisure Centre, Craigieburn VIC

2015/16

Builder: ICON

Project: Adina Apartment Hotel

Education

Certificate IV - Building & Construction

Skilled Up
Melbourne

Certificate III - Carpentry

Kangan Institute
Melbourne

Certificate III - Formwork & Falsework

TAFE
Brisbane

Certificate III - Civil Foundations

TAFE
Brisbane

Skills

    - Leadership

    - Time management

    - Decision making

    - Competent in wide range of hand/power tools

    - Active listening

    - Attention to detail

    - Problem solving

Hobbies: Camping, Fishing, Golf, Running & Gym

I enjoy an active lifestyle with my young family as well as maintaining a sound level of fitness.

Timeline

Formwork Carpenter

I&D Group Pty Ltd
02.2023 - Current

Polywelder

Utility Fusion
07.2022 - 02.2023

Leading Hand Carpenter/Supervisor

Mercav Constructions Pty Ltd
01.2021 - 07.2022

Carpenter

Aspire Facades
01.2020 - 12.2020

Leading Hand Carpenter

I & D Group Pty Ltd
07.2018 - 11.2019

Carpenter

Mercav Constructions Pty Ltd
06.2015 - 07.2018

Certificate IV - Building & Construction

Skilled Up

Certificate III - Carpentry

Kangan Institute

Certificate III - Formwork & Falsework

TAFE

Certificate III - Civil Foundations

TAFE
Daniel Cranitch