Summary
Overview
Work History
Skills
Timeline
Generic

Daniel McKenzie

South Morang

Summary

i believe i am a dynamic and results-driven Electrical Apprentice with extensive experience, specializing in the installation and maintenance of ITS assets. Proficient in light and power commissioning, with a strong focus on safety, teamwork and punctuality. I love problem-solving and technical testing in high pressure enviroments. Though i have lots of experience in many forms in the industrial and infrastructure sector i believe my best quality's are my ability to work in a team with clear communication, intent to listen and learn while completely my tasks in a safe and timely manner

Overview

3
3
years of professional experience

Work History

First Year Electrical Apprentice

JNI Infrastructure
02.2023 - 12.2023
  • Working in conjunction with the JV to install temporary power
  • Building and constructing varies cable and assets containment spanning across the whole site
  • Learned safety protocols and best practices for working in electrical environments.
  • Familiarized with hand tools, power tools, and testing devices used in electrical work.
  • Adapted quickly to new tasks, demonstrating willingness to learn from experienced staff.
  • Streamlined project completion by accurately interpreting and executing blueprints, sketches, and technical drawings.

Second and Third Year Electrical Apprentice

UGL
01.2024 - 09.2025
  • Installation and maintenance of ITS assets across the project
  • Installed Light and camera poles across the project ranging from 8m,11m and 13m with 3 and 4.5m outreaches
  • Light and Power installation
  • Installed AID and PTZ cameras
  • Installed RC2, RC3, LUMS. and LUS signs
  • Installed VMS signs
  • Installed ECA and ECB cabinets


Third Year Electrical Apprentice

Viridis
09.2025 - 12.2025
  • Light and Power Commissioning across the project
  • Conducted Point to Point, insulation resistance, fault loop impedance and phase rotation testing
  • Completed ITRs and relevant commissioning documentation under the supervision of A grade electricians
  • Worked under permit and lock out, tag out systems
  • MCC, GDB, UDB termination and commissioning
  • Fluke 1664 testing and usage
  • 4-20ma control testing
  • Damping Fans programming and commissioning in conjunction with the asset owner (SICE)
  • UPS terminating and commissioning
  • Fault finding and RCD replacement across various types of distribution boards
  • Relay and control wiring fault finding and commissioning

Fourth Year Apprentice Electrician

SKS
11.2025 - Current
  • Mains power crew
  • Pulling in and installing mains cables to various GDB's across the project
  • Stripping back and terminating mains cables

Skills

    Over 11m EWP license

    LV and CPR rescue

    RIW

    Scissor Ticket

Timeline

Fourth Year Apprentice Electrician

SKS
11.2025 - Current

Third Year Electrical Apprentice

Viridis
09.2025 - 12.2025

Second and Third Year Electrical Apprentice

UGL
01.2024 - 09.2025

First Year Electrical Apprentice

JNI Infrastructure
02.2023 - 12.2023
Daniel McKenzie