Summary
Overview
Work History
Education
Skills
Personal Information
Education
Timeline
Generic
DANIEL  O'CONNELL

DANIEL O'CONNELL

Perth,WA

Summary

Experienced and enthusiastic site civil superintendent/construction manager with a diverse background in underground services, drainage, bulk earthworks, and concrete works. Solid history of managing large-scale construction projects and ensuring adherence to safety and quality standards. Proven ability to lead teams, coordinate resources, and maintain project schedules for successful outcomes and operational excellence. Recognized for strong teamwork and adaptability. Proficient in computing applications and programming such as AutoCAD Civil 3D, Navisworks Freedom, and Excel. Knowledgeable in GPS systems and site applications. Capable of delivering projects on time and within budget while prioritizing safety. Committed to upholding the integrity and core values of the company. Determined to continually develop skill set and enhance business efficiency.

Overview

20
20
years of professional experience

Work History

SITE SUPERINTENDENT/CONSTRUCTION MANAGER

Primero Group
01.2024 - 12.2024
  • Collaborated with engineers, and subcontractors for seamless project execution and timely completion.
  • Developed detailed project schedules to manage resources effectively and ensure milestones were met consistently.
  • Conducted risk assessments regularly during project phases to proactively mitigate potential issues causing delays or cost overruns.
  • Improved project efficiency by implementing streamlined construction processes and effective communication strategies.
  • Led project teams to ensure timely and efficient completion of construction projects.
  • Conduct site leaderships meetings to ensure HSE compliance and coordinate site activities between all stakeholders

SITE SUPERINTENDENT

PCH Civil
07.2023 - Current
  • Oversaw Quality Control (QC) for construction teams, delivering results in line with project specifications.
  • Completed projects on time and within budget by collaborating with contractors
  • Prepared risk assessments to support safe and stable construction sites.
  • Estimated quantities and cost of materials, equipment and labour requirements to determine project feasibility.
  • Visited sites to review work progress and drive process improvements.
  • Maintained a high level of Safety and QA on multiple work fronts
  • Implemented cost control and tracking of individual projects


SITE SUPERINTENDENT/SUPERVISOR

Primero Group
10.2015 - 07.2023
  • Manage direct hire personnel and subcontractors adherence to the Project HSMP.
  • Co-ordinate with Project Controls personnel to understand and produce detailed forecasting and scheduling of future activities.
  • Overseeing the daily activities across the entire work site, including scheduling of works, delivery of equipment and materials, and progress reporting
  • Building relationships and liaising with the client to determine project requirements and objectives
  • Assist Project Managers and Estimators to bid projects, including implementing innovative cost-saving ideas
  • Monitoring progress to determine timely completion aligned to progress schedules
  • Maintaining project QA/QC
  • Supporting Project Mangers and other site superintendents to achieve project goals

CIVIL PLANT OPERATOR

Primero Group
01.2014 - 10.2015
  • Installation and relocation of stormwater Pit and pipes
  • Reading plans and ensuring work is carried out to industry standard and job requirements
  • Suggested solutions for continuous improvement of plant safety, reliability and overall efficiency.
  • Install of multiple site services electrics/Water and waste
  • Operated allocated company vehicles and equipment in line with requirements.
  • Installation and Modifications to pipework, install valves, pump alignments, hydro testing and general maintenance replacing gaskets etc. Flange management
  • Excavated trenches and moved earth to assist groundwork preparation.
  • Carried out thorough equipment inspections, maintaining consistent productivity in line with site targets.

DRAINER / PLANT OPERATOR

PIHA
08.2013 - 01.2014
  • Pipeline install for the various services on site, which included portable water/fire booster systems/pump stations and dust suppression systems
  • Duties included:
  • Trenching/backfilling and compacting
  • Load and align poly pipe and shaving preparation for wielding
  • Reported safety or environmental issues to site management.
  • Performed thorough pre-start checks to identify mechanical and safety issues prior to excavation works.
  • Loading moxys/rock breaking
  • Loading and unloading poly wielding machines
  • Set up and Hydro-testing of finished pipeline
  • Precisions lifts of large loads with excavator
  • Installing pit and pipe services
  • Locating existing services
  • Poly Pipeline construction installation of valves/air breathers/blinds

PLANT OPERATOR | AUTOHAUL PROJECT

RAILWORKS
05.2013 - 08.2013
  • Operating plant, excavators and skid steers for all different job tasks trenching to lifting concrete slabs
  • Digging to levels and preparation of the site to ensure rainwater didn't affect the electrical boxes serving the rail signal system
  • Conducted cable install along the rail line
  • Spotter along heavy haul rail line
  • Working in isolated areas
  • Ensuring health and safety guidelines were adhered to at all times
  • Manual tasks including Cad Wielding, grinding, cutting, use of power tools
  • Pit and Pipe installation, Hydro Excavation for locating services

CONCRETE FINISHER

KERBING WEST
01.2013 - 05.2013
  • Ensuring concrete products were finished to a high standard
  • Reporting any defects to supervisor
  • Maintenance of extruded kerbing machines
  • Working as part of a team to ensure the job was completed under strict time restraints
  • A detailed finisher of all our products ramps/kerbs/barriers
  • Site set up/ pouring/ screeding/ trowelling/floating and curing etc.

DRAINER/PLANT OPERATOR

MARK FERRITER
09.2008 - 08.2012
  • Installation of Sewerage and Effluent systems on residential, agriculture and commercial builds
  • Construction of pits as well as installing pre-cast pits
  • Excavating spoon/V drains for agriculture land drainage
  • Installing percolation for surface water run off
  • Excavating and installation of septic tanks
  • Operating machinery, digging to levels preparation of trenches prior to install of pipe
  • General maintenance of all machinery

GENERAL LABOURER

SEAN O'CONNELL GROUND WORKS
01.2005 - 01.2008
  • I worked in my Father's company in the ground-works sector, which specialized in providing the complete service package consisting of surface water (including inceptor's) and foul water sewage including sewage treatments schemes in private, residential and commercial sectors

Education

Civil Construction

Plumber

NVQ Level 3 - Computer science

National University of Galway

Skills

  • Strong communication
  • Engaging leadership style
  • Microsoft Excel, Project and Visio
  • CAD software proficiency
  • Exceptional attention to detail
  • Safety compliance
  • Job site management
  • Contract Management
  • Construction supervision

Personal Information

Education

Perth,Ireland

Timeline

SITE SUPERINTENDENT/CONSTRUCTION MANAGER

Primero Group
01.2024 - 12.2024

SITE SUPERINTENDENT

PCH Civil
07.2023 - Current

SITE SUPERINTENDENT/SUPERVISOR

Primero Group
10.2015 - 07.2023

CIVIL PLANT OPERATOR

Primero Group
01.2014 - 10.2015

DRAINER / PLANT OPERATOR

PIHA
08.2013 - 01.2014

PLANT OPERATOR | AUTOHAUL PROJECT

RAILWORKS
05.2013 - 08.2013

CONCRETE FINISHER

KERBING WEST
01.2013 - 05.2013

DRAINER/PLANT OPERATOR

MARK FERRITER
09.2008 - 08.2012

GENERAL LABOURER

SEAN O'CONNELL GROUND WORKS
01.2005 - 01.2008

NVQ Level 3 - Computer science

National University of Galway

Civil Construction

Plumber
DANIEL O'CONNELL