Passionate about renewable energy technology and possessing a positive competitive personality, this individual's presence in Australia since February 16, 2023, has been driven by a commitment to advancing this industry.
Confident in their ability to perform duties correctly and accurately, their keen interest lies in contributing to the implementation side of projects, specifically in installation and commissioning, which showcases their remarkable flexibility.
Daniel firmly believes that every employee represents a valuable asset within a company. The selection of the right assets can undoubtedly lead to significant improvements for the company.
Overview
18
18
years of professional experience
1
1
Certification
Work History
Senior Electrical Engineer
Electro Jam Pasargad Company_2,5MW Solar PP
01.2022 - 01.2023
Checking plan with software to determine power output of power plant based on environmental factors and project site dimensions.
Investigating solar panel placement and optimal spacing considering shadow conditions.
Coordinating with mechanical team to assess existing structure's capacity for additional weight and conducting structural calculations.
Inspecting wiring conditions, installing cable trays and bases, and preventing interference with existing structures and wiring.
Offering modification and optimization suggestions as needed.
Providing technical expertise and recommendations based on prior experience to designer.
Uploading 134 project design-related documents to EDMS site.
Reviewing employer comments on produced documents and making necessary corrections.
Supervising power plant construction in compliance with Iranian standards.
Proposing structures for purchase and sale and introducing potential sellers and producers.
Managing sudden employer-requested changes, documenting meeting minutes, and determining agreement or disagreement based on technical considerations and instructions.
Preparing technical documentation for operation, troubleshooting, and maintenance of industrial systems.
Applying appropriate engineering methods in accordance with project discipline standards.
Evaluating electrical installations and systems to identify faults and implement corrective measures.
Analyzing blueprints and project documentation to develop workflows and strategies.
Designing concepts that incorporate module placements, conduit routing, and inverter locations using [Software] to create three-dimensional prototype designs.
Senior Electrical Engineer
ELECTRO JAM PASARGAD_5MW Solar PP
01.2021 - 01.2022
Project5MW
Providing daily planning and agenda to the supervisor of each team.
Checking the quality of team members’ work and receiving reports from the team supervisor.
Installation of electrical connections at very sensitive points such as transformers and main panels.
Insulation test, voltage test, polarity test, ground resistance test.
Preparing a checklist and checking all the electrical parts of the project.
Constant attendance at meetings
Lead Electrical Engineer
ELECTRO JAM PASARGAD Company
01.2019 - 01.2021
Officially, plan involves:
Installing 150 off-grid projects with capacity of 5 kW each within span of 2 years.
Providing training for installation of off-grid solar systems.
Forming teams specialized in installation of solar systems.
Sourcing equipment from equipment sales companies based on number of projects.
Establishing communication channels with customers, attracting new clients, and offering explanations in line with guidelines provided by Ministry of Energy and Electricity Distribution Organization.
Verifying customer's location and creating location-based maps (for houses).
Estimating project costs.
Coordinating shipment of equipment to project location through the respective team leaders.
Offering services to support installation teams and addressing any issues that arise during installation process
.Ensuring safety of installation teams by either sending pictures or physically being present at project site.
Collaborating on installation and electrical connections, including:
Mounting structure on roof top
Installing solar panels on structure while following installation instructions
Wiring strings
Installing DC protection switchboard
Performing necessary tests as per checklist
Establishing AC connections and conducting relevant tests.
Completing all stages of installation, sealing, and delivering the finished system to customer.
Providing customers with basic information and ongoing support.
Monitoring project progress through remote control and installed system application.
Continuously offering support and assistance as required.
Performed maintenance procedures and repairs on existing electrical products and systems
Identified specific cables, fuses and circuit breakers required for assigned installations
Electrical Engineer
Electro Jam Psargad COMPANY_7MW Solar PP
01.2018 - 01.2019
Connect solar panels and create strings.
Wire DC strings from solar panels to combiner box based on provided map.
Route DC wiring from combiner box to inverter within earth channels through cable burial.
Perform voltage, polarity, short circuit, and insulation testing.
Wire SMA AC 60KW inverter as per designated plan and instructions, utilizing earthen channel and burying cable in soil.
Connect three-phase AC inverter cables to LV_400V panel and conduct necessary tests.
Conclude installation of connections within transformer panel.
Install 20 kV cables from substation 1 to GRC 6, culminating in substation Room Central.
Supervise drilling of earth wells and reduce ground resistance to 1 Ohm.
Number both ends of all cables for precise connections.
Wire network cables and oversee control and monitoring of inverters and LV panels for intelligent management of low-pressure and high-pressure switches.
Mount projectors around power plant and position CCTV cameras at designated locations in accordance with plan.
Complete wiring for lighting and procure necessary components for each substation room.
Perform health and quality assessments of electrical team equipment, including testing devices.
Attend all project meetings.
Offer recommendations to expedite project progress.
Resolve issues that arise during project.
Electrical Engineer
Electro Jam Pasargad Company 7MW Solar PP
01.2017 - 01.2018
Connecting solar panels and forming strings.
Wiring DC strings from solar panels to combinerbox according to map.
DC wiring from combiner box to inverter inside earth channels by cable burial method.
Testing voltage, polarity, short circuit, insulation.
KACO inverter 50KW wiring AC&DC according to the plan and instructions by the method of implementing the earthen channel and burying the cable in the soil.
Connecting three-phase AC inverter cables to LV_400V panel and performing required tests.
Complete installation of connections inside transformer panel.
Running 20 kV cables from substation 1 to GRC 6 and finally substation Room Central.
Monitoring drilling of earth wells and reducing ground resistance to 1 Ohm.
Numbering beginning and end of all cables for accurate connection.
Wiring of network cables and control and monitoring of inverters, LV panels for intelligent control of low pressure and high pressure switches.
Installing projector around power plant and placing CCTV cameras at all three distances and placing cameras according to plan.
Lighting wiring and parts required for each substation room.
Health and quality control of electrical team equipment such as testing devices.
Attending all project meetings.
Providing suggestions to accelerate progress of project.
Solve problems during project.
Performed maintenance procedures and repairs on existing electrical products and systems
Electrical Technician
ELECTROJAM PASARGAD
01.2010 - 01.2017
Supplying equipment based on the project manager's list, by the company's vehicle and loading in the company's warehouse.
Working with the team to install projects from 5 kW to 20 kW.
Transferring the customer's equipment to the project site.
Checking the condition of the roof, to create safety with my colleagues.
Structure installation.
Installing a solar panel on the structure.
Installation of ducts, bases, ladders, and covering and holding cable trays.
DC & AC wiring.
Installation of hybrid inverter based on the plan and conditions of the installation site.
Do the relevant wiring.
Installing the battery box and connecting the batteries.
Testing and commissioning.
Collecting equipment based on the list.
Delivery of the car, equipment, list to the company.
Maintenance Repairman
Self-employed In The Repair Workshop
01.2005 - 01.2010
Repairs of household and industrial electrical appliances.
Repairing home refrigerators and freezers.
Repair of industrial refrigerators.
Types of domestic and commercial heating systems (thermal and cooling).