Summary
Overview
Work History
Education
Skills
Secondary Qualifications
Plant Shutdowns
References
Attributes
Previous Experience
Timeline
Generic

DARREN BREW

Forster,NSW

Summary

I have excellent skills in managing time, setting priorities and planning. I have the ability to be innovative and flexible, leadership/mentoring skills, excellent written and verbal skills and the ability to work within and contribute to a team environment. I am also competent with all Microsoft Office applications. I am extremely passionate about my work and I take pride in all I do. I believe that all personnel should be treated with respect and this approach has helped me develop an excellent working relationship with the workforce that encourages employees to take ownership of safety and come to me with safety issues. I also believe there is a time to be firm and resolved to address safety concerns and breaches because it’s not only the safety of personnel at stake but also my reputation and the reputation of the company that I represent. I have the ability to deal with difficult contractors and Project personnel.

Overview

34
34
years of professional experience

Work History

Construction Supervisor

UGL Limited
03.2022 - Current
  • Over seeing Pressure part works on various Power Stations preparation of permits and associated paperwork to ensure the safety of the employee’s Works including Boilers, Duct Work, Air Heaters, Headers, Blow down tanks, conveyors
  • Eraring, Mount Piper, Bayswater, Pine Creek NT, Torrens Island SA- Power Stations

HSE Advisor Nightwork

PPW Projects
01.2019 - Current
  • Overseeing 150 employees Managing all aspects of Safety on Nightshift.Meeting KPI’s organising workpacs and Critical Control Audits. I have worked for PPW for 19 years doing various shutdowns in Power Stations between my other work, mainly as either Supervisor or Boilermaker

Construction Supervisor

Infrabuild Mayfield
11.2022 - 03.2022
  • Client Side overseeing Civil and Mechanical works on site, Preparation of permits, jsea Supervising of multiple disciplines in both Civil and Mechanical

SMP Supervisor Olympic Dam

Downer EDI
07.2021 - 11.2021
  • Organising crews, Permits and all associated paperwork, issuing and Supervising tasks, Running of Feed Prep removal of redundant machinery and installation

L/H Boilermaker

TW Power Services
12.2021 - 10.2021
  • Tube leaks and general maintenance of plant and equipment, holding of work permits, creating work pacs and issuing of planned tasks.

Boilermaker

UGL Power
10.2020 - 12.2020
  • Tube Fitting and Boiler repairs on Unit 1

Supervisor

PPW Projects
12.2020 - 09.2020
  • Supervision of Combined Ducts and Ducting systems, work permits and all associated paperwork client and contractor sides

Boilermaker

UGL Power
08.2019 - 11.2019
  • Nightshift Boilermaker rebuilding Air Heaters and general repairs of associated equipment

SMP Supervisor

Farrelly Construction Services
01.2018 - 01.2019
  • Managing Small Bore installation at Woodlawn Zinc and Copper Mine at Goulburn, $160 Million Contract, 45 Direct and 10 indirect employees, Liasing with Sedgman OCM running of all Pipework for all services. Planning and executing daily tasks ensuring safety standards are maintained. Work permits, client meetings building all new infrastructure for the plant.

Site Supervisor

HMA Singleton
01.2017 - 01.2018
  • Supervising crews throughout Singleton and Boggabri working in Various CHPP, Pipe installations, Chutes, Conveyors, Cyclones, Structural Repairs, looking after the OHS Requirements of the crew and clients, Permits, JSA, writing reports

Site Supervisor

Brauntell Engineering
01.2017 - 01.2018
  • Supervising Rebuilds of Dump trucks, Excavator shutdowns, Washeries, All Mining Equipment, OHS of the many Mining sites throughout Hunter Valley, All associated paperwork and Mentoring of staff

Supervisor Boilermaker

Monodelphous Engineering
01.2016 - 01.2017
  • Repairs and maintenance on various Mining equipment on various mine sites and workshop
  • Dump Trucks, Excavators, Loaders, Draglines, Scrapers, Shovels. Overhauling machinery back to manufacturers specifications

Supervisor/Boilermaker

RIG INSTALLATIONS
01.2013 - 01.2016
  • Rig is responsible for the maintenance and project work of Bulga Washery.
  • As the Supervisor I was responsible for the planning Liasing with clients, running of site crews and maintaining Procedures and Paperwork are executed correctly and executing of daily tasks, ensuring safety standards are maintained.

Construction Supervisor

APA
01.2012 - 01.2013
  • Moomba to Wilton Gas Re-Sleeving Project and was based at Tibooburra NSW. the Moomba to Wilton Gas Re Sleeving Project was stage 14 of the Project
  • As the Project Construction Supervisor I was responsible for supervising digs and sleeving of a live natural gas line. my role also consisted of ensuring that Job Hazard Analysis was developed for various activities, hazard identification was being conducted, procedures was current and assisting in implementing and maintaining safety systems and assisting work crews in continually improving the safety culture through behavioural based safety observations. Daily I was also responsible for the planning and executing daily tasks, supervision of excavations, organising construction activities, installation of pumps, slurry lines and water treatment, containment of ground water and liaising with client and land owners.

Boiler Maker / Leading Hand

Nilsen
01.2011 - 01.2012
  • Construction of new mine, processing plants and installation of complete conveyor systems, desalination plant, crushing units, electrical components.
  • As the Project Boiler Maker and Leading hand my role consisted of developing Job Safety & Environmental Analysis, hazard identification, delivering weekly toolbox and daily pre-start meetings to construction crews and assisting supervisors and work crews in continually improving the safety culture through behavioural based safety observations and recommendations. I was also responsible for fabrication and welding, overseeing construction of the desalination water processing plant and installing components.

Manager

Toot Removal Contractors
01.2005 - 01.2007
  • Running of all logistics and office estimating of all work including, estimation on job locations, vehicle logistics, HR officer, project management, facilitation of work teams, planning and budgeting, day to day forecasting and Implementing safe work practices

Mechanical Supervisor

HF Hand Constructors
01.2004 - 01.2005

Estimator

Toot removal Contractors
01.1999 - 01.2002

Leading Hand Boilermaker

Newcastle Field Maintenance Services
01.1996 - 01.1999

Apprenticeship Boilermaker

A. Goninan & Co
01.1992 - 01.1996

Supervisor Boilermaker

TFS Engineering
01.2017
  • Building new 793 Dump Truck Bodies and Excavator Buckets for Austin engineering, Looking after all OHS requirements

Night Shift / Day Shift Supervisor

Origin Energy
01.2013
  • APLNG Talinga (Pipeline Compressor Facility) PCF Project
  • Nacap is responsible for the underground works construction of the Talinga PCF APLNG compression station which includes preparing the site for the construction of two Gas Compression Trains, common PCF Equipment and PCF Infrastructure.
  • As the night shift day shift Supervisor I was responsible for the planning and executing daily tasks, ensuring safety standards are maintained. I was also responsible for the supervision of Civil and Structural works that was undertaken in Greenfield’s and Brownfield’s.

Boiler Maker

Downer EDI
01.2012
  • $1.6 billion Port Waratah Coal Service Construction of Train 4 installation of conveyor systems, transfer houses, dump stations.
  • As the Boilermaker on this Project my responsibilities consisted of supervision of multi trades, installation of pipe work, preparation of all safety orientated paperwork, installation of thickner tanks and pumps for water treatment. I was also responsible for the installation of equipment, construction of water treatment plant and liasing between client and other contractors.

Boiler Maker

Laing O’Rourke
01.2011
  • Construction of the Western Australian RGP5 Yandi Eastern and Western crushing units and associated
  • As the Boiler Maker on the Project I was responsible for installing components, installation of magnatite pipeline and thickner tanks and pumps. I was also involved in the construction of the desalination water processing plant, fabrication and welding and the installation of the overland conveyor.

Boiler Maker / Supervisor

Trius Constructions
01.2010
  • Boilermaker and Supervisor in charge of multiple sites project managing jobs, estimating new work running of multi trade personel liasing between company and client, ensuring Safe Methods & Practises of work, running of multiple crews, mine sites, construction of water treatment plant and liaison with clients

Site Supervisor

TFP Engineering
01.2010
  • Site Supervisor running multiple coal mine sites throughout the Hunter Valley area construction, maintenance of both processing equipment and fixed and mobile plant, supervising fixed and mobile plant

HSE Advisor / Coordinator

Varley Engineering
01.2009
  • OHS Advisor & Coordinator looking after all safety orientated tasks from implementing procedures to seeing that all of the procedures implemented were carried out including ensuring compliance with Safe Methods & Practises of work, auditing existing procedures, liaising between safety teams.

Night Shift Coordinator

Connell Hatch
01.2008
  • $1.8 billion Connell Hatch Project (NCIG Coal Loader) I was involved in supervision of the construction of stage 1 of the new coal loader implementing safety and cultures within the crews, supervising of contractors (Civil & Mechanical), overseeing dredging operations, dam construction, promoting safe work practices and implementing all state & national guidelines & regulations.

Construction Supervisor

Worley Parsons
01.2007
  • Supervision of multiple contractors’ project management, preparation of paperwork JSA etc, direct liaisons with clients, supervising various work teams, construction of new water treatment cooling towers, policy establishment & enforcement, project management, handling quotes & tenders, planning & executing work and the Implementation of safe work practices.

Mechanical Supervisor

Downer EDI
01.2005

Supervising Boilermaker

GE Sault & Sons
01.2004

Education

Skills

  • Supervisor
  • Boiler making
  • Pipe Fitting
  • Fabrication
  • Rigging
  • Safety Advisor

Secondary Qualifications

  • Confined Space
  • Working @ Heights
  • High Risk Licence DG, RA, WP
  • Front line management
  • Cert 4 Business
  • OHS Diploma
  • Supervisor certification

Plant Shutdowns

  • PPI – Eraring Power Station
  • PPW - Bayswater Power Station
  • Transfield Worleys - Various Power Stations

References

  • Lucas Armstrong Cert 10 Supervisor
  • Ph 0429 102 988
  • Scott Sankey Project Manager
  • Ph 0424 841 069

Attributes

  • Excellent skills in managing time, setting priorities and planning.
  • Ability to be innovative and flexible.
  • Leadership/mentoring skills.
  • Excellent written and verbal skills.
  • Ability to work within and contribute to a team environment.
  • Competent with all Microsoft Office applications.
  • Passionate about work and take pride in all tasks.
  • Belief in treating all personnel with respect.
  • Ability to deal with difficult contractors and project personnel.

Previous Experience

  • Mechanical Supervisor, HF Hand Constructors, 2004, 2005
  • Mechanical Supervisor, Downer EDI, 2005, 2005
  • Supervising Boilermaker, GE Sault & Sons, 2004, 2004
  • Estimator, Toot Removal Contractors, 1999, 2002
  • Leading Hand Boilermaker, Newcastle Field Maintenance Services, 1996, 1999
  • Apprenticeship Boilermaker, A. Goninan & Co, 1992, 1996

Timeline

Construction Supervisor

Infrabuild Mayfield
11.2022 - 03.2022

Construction Supervisor

UGL Limited
03.2022 - Current

L/H Boilermaker

TW Power Services
12.2021 - 10.2021

SMP Supervisor Olympic Dam

Downer EDI
07.2021 - 11.2021

Supervisor

PPW Projects
12.2020 - 09.2020

Boilermaker

UGL Power
10.2020 - 12.2020

Boilermaker

UGL Power
08.2019 - 11.2019

HSE Advisor Nightwork

PPW Projects
01.2019 - Current

SMP Supervisor

Farrelly Construction Services
01.2018 - 01.2019

Site Supervisor

HMA Singleton
01.2017 - 01.2018

Site Supervisor

Brauntell Engineering
01.2017 - 01.2018

Supervisor Boilermaker

TFS Engineering
01.2017

Supervisor Boilermaker

Monodelphous Engineering
01.2016 - 01.2017

Supervisor/Boilermaker

RIG INSTALLATIONS
01.2013 - 01.2016

Night Shift / Day Shift Supervisor

Origin Energy
01.2013

Construction Supervisor

APA
01.2012 - 01.2013

Boiler Maker

Downer EDI
01.2012

Boiler Maker / Leading Hand

Nilsen
01.2011 - 01.2012

Boiler Maker

Laing O’Rourke
01.2011

Boiler Maker / Supervisor

Trius Constructions
01.2010

Site Supervisor

TFP Engineering
01.2010

HSE Advisor / Coordinator

Varley Engineering
01.2009

Night Shift Coordinator

Connell Hatch
01.2008

Construction Supervisor

Worley Parsons
01.2007

Manager

Toot Removal Contractors
01.2005 - 01.2007

Mechanical Supervisor

Downer EDI
01.2005

Mechanical Supervisor

HF Hand Constructors
01.2004 - 01.2005

Supervising Boilermaker

GE Sault & Sons
01.2004

Estimator

Toot removal Contractors
01.1999 - 01.2002

Leading Hand Boilermaker

Newcastle Field Maintenance Services
01.1996 - 01.1999

Apprenticeship Boilermaker

A. Goninan & Co
01.1992 - 01.1996

DARREN BREW