Summary
Overview
Work History
Skills
Certification
Timeline
Training & Certifications
Generic
Darren Sanders

Darren Sanders

Taren Point,NSW

Summary

Darren brings to the project team, 16 years of civil construction experience on large transport infrastructure projects in NSW and Queensland. He is a safety orientated, deadline driven and quality focused professional with expansive experience in leading an efficient team, while ensuring compliance with WHS standards, and meeting project deadlines to achieve business growth and profitability.

Overview

17
17
years of professional experience
1
1
Certification

Work History

Civil Supervisor

GartnerRose
04.2025 - Current
  • Supervised daily operations on construction sites, ensuring compliance with safety regulations and quality standards.
  • Coordinated workflow among teams to optimize project timelines and resource allocation.
  • Conducted regular inspections to assess work progress and adherence to engineering specifications.
  • Trained and mentored junior staff in operational procedures and safety practices.

Supervisor

Polytan
11.2023 - 06.2024
  • Bulk earthworks, remediation, asbestos, sports field construction, concrete construction work

Supervisor

Ward / Ventia
02.2024 - 07.2024
  • Supervising SRAPC scope of works across multiple project sites for Ward / Ventia. Scope of works include reshaping of batters and installation of soil nails

Senior Supervisor

Ertech Pty Ltd
01.2021 - 01.2023
  • Heathcote Road Upgrade $77 million
  • Utilities
  • Pavements (Flexible & Rigid)
  • Temporary Works
  • Concrete strutures
  • M6 Early Works – Community Recreational Facilities, Warragamba Dam Pipeline upgrade works and URBNSURF

Supervisor

Downer EDI
01.2018 - 01.2021
  • Canterbury Road Easing Sydney’s Congestion Program ($10m).
  • Downer were engaged by the Easing Sydney’s Congestion branch of TNSW to undertake the upgrade of two pinch point intersections, between Canterbury Road & New Canterbury Road and Canterbury Road & Bexley Road. The upgrade included the relocation of sewer, water, HV, LV and comms infrastructure as well as stormwater drainage to facilitate the widening of both intersections which in turn improved traffic flow. Downer also installed new ITS infrastructure at both intersections.
  • The project was a mixture of self perform and subcontracted works, which Darren supervised as the senior supervisor on the project. Darren managed the crews of workers, the subcontractors and direct staff (other supervisors and leading hands) during the construction works.

Supervisor

Downer EDI
01.2016 - 01.2018
  • Mona Vale Road, Terry Hills Upgrade $8-$10M.
  • Downer was engaged by DM Roads to undertake the upgrade of Mona Vale Road and Forest Way intersection in Terrey Hills. The works formed part of the Easing Sydney’s Congestion program of works falling under TNSW, with DM Roads engaged as the Principal Contractor, who in turn engaged Downer EDI to complete the full scope of works. The works included the widening of Forest Way over approximately 500m leading up to the intersection with Mona Vale Road, the widening of Mona Vale Road westbound and the extension of the right turn lane into Forest Way on Mona Vale Road Eastbound.
  • As part of the scope of works and in addition to the earthworks and pavement works, Downer had to relocate a large number of live services, namely: LV, HV, water and sewer mains and comms lines (both overhead and underground). There was also the integration of new ITS infrastructure at a busy intersection of Mona Vale Road and Forest Way as well as a smaller business park intersection. During the works, there was incredibly heavy traffic especially during peak hours and the staging of each corner of the major intersection was critical to the success of the project which Darren managed alongside the Project Manager to bring the project in under budget and on time.
  • Darren supervised subcontractors and direct staff during the construction works. He managed the concrete pavement works and undertook weekly programming to ensure that scope was resourced to meet program.

Supervisor

Downer EDI
01.2016 - 01.2018
  • Cumberland Highway Upgrade $9-$12M
  • Darren was responsible for supervising subcontractors and direct staff, weekly programming, and daily site safety inspections in association with the concrete pavement works

Supervisor

Pacifico
01.2015 - 01.2016
  • Pacific Highway Upgrade $600M
  • Pacifico is an Acciona Ferrovial Joint Venture (JV) established to deliver the Warrell Creek to Nambucca Heads (WC2NH) section of the Pacific Highway upgrade on the Mid-North Coast of NSW. The scope included the design and construction of 19.5km of new dual carriageway road.
  • Bulk earthworks, subcontractor supervision, client meetings, drainage installation (box culverts, RCP)

Foreman Supervisor

Leighton Contractors
01.2010 - 01.2015
  • Gateway WA $1B
  • The project scope upgraded the road network around Perth Airport. Darren was responsible for supervising subcontractors and ensuring that adequate resources such as plant and equipment was available to complete the concrete and drainage works. Bulk earthworks, pavements flexible and rigid, retaining wall installation.

Leading Hand

Origin Alliance
01.2009 - 01.2010
  • Connecting Dinmore to Goodna $1.8B
  • The project involved the upgrade of a major four lane highway to a six-lane motorway with the capacity to further increase to eight lanes in the future, thereby supporting current transport needs while allowing for anticipated growth in the region.
  • Darren was involved in setting up for the excavation works, preparing bedding, installing RCP’s and box culverts, precast pit installation, and headwall installation.

Skills

  • Site Management
  • Resource Programming
  • Stock Control and Procurement
  • Mentoring Colleagues
  • Workplace Health and Safety
  • Risk Management
  • Quality Assurance
  • Management of Machinery/Equipment
  • Concrete Structural Works
  • Earthworks
  • Roadworks
  • Concrete Pavements
  • Drainage

Certification

Certificate IV in Supervision and Management

Timeline

Civil Supervisor

GartnerRose
04.2025 - Current

Supervisor

Ward / Ventia
02.2024 - 07.2024

Supervisor

Polytan
11.2023 - 06.2024

Senior Supervisor

Ertech Pty Ltd
01.2021 - 01.2023

Supervisor

Downer EDI
01.2018 - 01.2021

Supervisor

Downer EDI
01.2016 - 01.2018

Supervisor

Downer EDI
01.2016 - 01.2018

Supervisor

Pacifico
01.2015 - 01.2016

Foreman Supervisor

Leighton Contractors
01.2010 - 01.2015

Leading Hand

Origin Alliance
01.2009 - 01.2010

Training & Certifications

  • MR Drivers Licence
  • Powerline Awareness Training
  • Safe Tilt Up Work
  • Concrete Paving Crew Course
  • White Card
  • Excavator Ticket
  • Backhoe Ticket
  • Loader Ticket
  • Roller/Compactor Ticket
  • Permit Acceptors Course
  • Senior First Aid Certificate
Darren Sanders