Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

David James Gilyeat

Douglas Park,NSW

Summary

Mining Mechanical Fitter with extensive experience with Tahmoor Coalliery, excelling in hydraulic systems associated with longwall equipment, Gas drainage Clarks air/hydraulic drill rigs and VLI/CH4 electric/hydralic inseam drill rigs, outbye services, diesel equipment and development coverage maintenance and repairs.Proven leader in team coordination and operations management, ensuring high safety standards and efficient troubleshooting. Recognized for optimizing equipment performance and driving successful project outcomes in challenging environments.

Overview

34
34
years of professional experience

Work History

Mining mechanical fitter

Tahmoor coal
Tahmoor
04.2005 - Current
  • Performed preventative maintenance, troubleshooting, and repairs on longwall hydraulic equipment to ensure operational efficiency during production
  • Longwall relocations
  • longwall shift coordinating roll
  • Operated gas drainage equipment while maintaining and repairing Clarks air rigs and VLI/CH4 electric hydraulic inseam drill rigs to support safe and effective mining operations.
  • Conducted maintenance and repairs on all underground diesel equipment to maintain safety and reliability in operations.
  • Development coverage maintenance and repairs
  • Outbye services conveyor system n outbye infrastructure maintenance and repairs

Heavy vehicle mechanical fitter

Cummins
Wetherill park
01.1992 - 04.2005
  • Performed various roles
  • Team Coordinating n planning
  • Supervisor of workshop n personal
  • Operation manager at Cummins Wollongong Branch service,spares and sales
  • Customer relations
  • Service manager fill in roles at queanbyan and Penrith branches
  • Work scope Troubleshooting and repair of diesel equipment covering areas in Mining, heavy haulage automotive , marine, power generation sectors
  • Executed comprehensive equipment overhauls

Education

Hydraulic Systems

TTASS
Tahmoor
10-2013

Certlll Mechanical Trade - Heavy Equipment

Certlll Heavy Vehicle Fitter
Wetherill Park
10-1996

Electrical Disconnect Reconnect Qualification

Wetherill Park Tafe
Wetherill Park

Skills

Operation and repairs of below equipment

  • Hydraulic systems
  • Longwall equipment
  • Development equipment
  • Gas drainage drill rigs clarks air rigs and VLI/CH4 electric operated hydraulic inseam drill rigs and associated gas drainage systems
  • Conveyor maintenance
  • Electronic engine management system
  • Diesel equipment
  • Fast n efficient in troubleshooting n repairs
  • Team leadership n coordinating and supervision roles
  • Operation manager experienced in managing people and equipment
  • Fork lift
  • Dogging
  • Strong safety standards

References

  • David Waldock

Mechanical engineer tahmoor colliery

0400522923

  • Jason Byrne

under manager Tahmoor colliery

  • Rick Brittain

Mining deputy Appin west colliery

0403668633

  • Rodney Taplin

Mining deputy Appin West colliery

0402473094

  • Andrew Cook

Gas drainage mechanical supervisor tahmoor colliery

0410426950

Timeline

Mining mechanical fitter

Tahmoor coal
04.2005 - Current

Heavy vehicle mechanical fitter

Cummins
01.1992 - 04.2005

Hydraulic Systems

TTASS

Certlll Mechanical Trade - Heavy Equipment

Certlll Heavy Vehicle Fitter

Electrical Disconnect Reconnect Qualification

Wetherill Park Tafe
David James Gilyeat