Summary
Overview
Work History
Skills
Timeline
Generic

Dorde Pajicic

Liverpool,NSW

Summary

Skilled Formwork Carpenter with experience in commercial and residential construction. Strengths include knowledge of building codes, blueprint analysis, and project management. Demonstrated proficiency in constructing and repairing formwork structures, along with contributing to successful completion of projects on time. Self-starter proudly offering many years of commercial concrete knowledge. Committed to working hard and a job well done. Looking to join an organization as a Formwork Carpenter. Resourceful Formwork Carpenter recognized for high productivity and efficient completion of tasks. Possess specialized skills in constructing, assembling, and dismantling formwork systems for concrete structures, reading and interpreting blueprints, and ensuring compliance with safety standards. Excel in teamwork, problem-solving, and time management to deliver projects on schedule.

Overview

7
7
years of professional experience

Work History

Formwork Carpenter

DAMCON PTY LTD
Liverpool, NSW
10.2017 - 12.2024
  • Identified potential problems before they arose through careful inspection of work areas.
  • Attended regular team meetings in order to discuss progress updates on projects.
  • Repaired damaged or weakened formworks using appropriate materials like wood glue, epoxy resin or screws.
  • Measured and cut timber to size in order to create formwork components.
  • Cleaned up all tools and equipment used during construction projects.
  • Installed steel ties and walers, as well as other reinforcing components.
  • Fashioned frameworks or props using hand tools and wood screws, nails or glue.
  • Studied blueprints or building plans to prepare layout and materials required.
  • Consistently constructed square and level projects.
  • Applied protective coatings such as paint or waterproofing membrane to finished surfaces.
  • Adhered to project blueprints and requirements to deliver quality work.
  • Checked levelness of finished surfaces using spirit levels or laser levels.
  • Ensured the accuracy of the formwork prior to pouring concrete.
  • Removed all debris from work area after completion of each job.
  • Delivered proper materials and equipment to job site in preparation for project.
  • Collaborated with other tradespeople onsite in order to ensure that all tasks were completed correctly and safely.
  • Cut and set anchor bolts into wet concrete according to blueprints.

Skills

  • Blueprint reading
  • Formwork installation
  • Concrete pouring
  • Material selection
  • Tool maintenance
  • Safety compliance
  • Effective communication
  • Time management
  • Attention to detail
  • Site cleanup
  • Problem solving
  • Team collaboration
  • Project planning
  • Quality control

Timeline

Formwork Carpenter

DAMCON PTY LTD
10.2017 - 12.2024
Dorde Pajicic