Enthusiastic boilermaker offering several years of experience interpreting work orders and applying information to project needs. Promoting safety in every task. Sharp and highly trained with desire to work within the field sector.
Overview
17
17
years of professional experience
Work History
Boilermaker/Welder
Samaras Structural Engineers
96-106 Grund Trunkway Gilman, SA
01.2023 - Current
Assembled parts into complete units by welding them together.
Measured and marked cutting lines on material using a ruler or scribe.
Cut materials to size with torches and hand tools.
Constructed steel structures according to blueprints provided by engineers.
Used oxyacetylene torch to cut through steel plate for fabrication purposes.
Marked reference points for columns and plates on foundations using master straightedge.
Operated manual or semi-automatic flame-cutting equipment to cut metal for fabrication of products.
Constructed templates and jigs for fabrication according to blueprints.
Preparing selecting and cleaning metal stocks for use.
Boilermaker/Draftman
Wayoe Engineering And Construction Ltd
Takoradi , Western Ghana
02.2010 - 07.2021
Design of warehouse structures, materials handling conveyors and hoppers.