Energetic professional successful at motivating and building positive team dynamics to accomplish aggressive goals. Dedicated to open, communicative culture where employees feel empowered to contribute to company's success.
Led a crew of 8 in gyro rebuilds, oversize replacements, and maintenance tasks.
Executed MP1000 rebuilds and routine maintenance efficiently.
Performed screen changeout and conducted thorough maintenance checks.
Managed motor changeout, pully alignments, and belt tension adjustments.
Conducted coupling inspections to ensure operational reliability.
Executed laser alignment of pumps, motors, and couplings for precision performance.
Troubleshot breakdowns while coordinating communication among all relevant parties.
Completed daily critical control verifications and SAP data entries accurately.
Executed rigging removal and installation of MP1000 head chute, bowl, arm guards, and liners.
Recharged accumulators and connected hydraulic lines to ensure optimal performance.
Removed and installed clamp cylinders to facilitate maintenance activities.
Replaced hydraulic needle valves, check valves, pumps, and hoses to enhance system reliability.
Rebuilt and installed lube pumps for improved lubrication efficiency.
Conducted internal and external micrometer measurements of bushes and main shafts for precision fitting.
Performed heat exchanger and filter replacements to maintain system integrity.
Laser aligned couplings and shimmed as necessary to achieve precise tolerances.
Forming keyway for precast tunnel arches
Installation of precast tunnel arches
Steel panel wingwalls with reinforced earth straps
Pouring blindings for tilt panels
Installation of culverts- landing, formwork and pouring of stabe sand
Installing MSC bridge wall panels
Forming and installing headstock formwork
Installation of bridge beams and bracing
Dogging 20T Franna and 50T slew crane
Building and stripping Peri Skydeck
Cutting in deck
Forming beam edges and edge board
Installing decking
Installing donga patios and sheds
Installing gutters and downpipes
Constructed and erected timber trusses, floor cassettes, and stud walls.
Performed cutting and installation of cladding materials.
Executed highrise formwork projects.
Erected decks utilizing Peri Tables, PANS, Quick stage, and Bondek materials.
Constructed and poured Ritek walls to meet structural specifications.
Formed set downs, edge boards, and wet areas for effective drainage.
Positioned and poured columns to ensure stability and support.
Built and formed ground beams.
Worked as part of the concreting team to pour blindings, beams, and finishing concrete.
Worked closely with surveyors, positioning beams, bolts, and their heights.
Roof Carpentry – setting out the ceiling, cutting and pitching the roof (stick and truss) battening, lining carports, alfrescos and also stud walls and framework (steel and timber)
Shop fit outs, installing doors, skirting, architraves, bulk heads and flooring
Decking, pergolas and renovations
Formwork
Equipment maintenance
Laser alignment
Hydraulic systems
Troubleshooting techniques
Critical control verifications
Project management
Team leadership
Safety compliance
Quality assurance
Time management
Data entry
Preventive maintenance
Training and mentoring
Task delegation
Frontline Management
Working at heights
Confined spaces
Forklift
Intermediate rigging
EWP
Tilt-up
Rio Tinto inducted and lock holder
Skill Hires Tony Harvey excellence award 2014
Master Builders most outstanding 2nd year apprentice 2015
Trade Qualified 2018
Shannon Clark-Maintenance Superintendent
Mobile-0409 444 490
E-mail-shannon.clark@karridalegroup.com.au
Zachary James- Senior Supervisor
Mobile-0475 208 251
E-mail-Zachary.james@karridalegroup.com.au