Adept at driving operational excellence, I significantly enhanced team productivity and customer satisfaction at Avopiling Australia through strategic planning and effective leadership. My expertise in safety protocols and adaptability, coupled with a talent for mentoring, fosters a culture of continuous improvement and achievement.
My accomplishing as a person I’m a loving and dedicated father of four awesome children ranging from the youngest and 18 through to the oldest at 24 two boys two girls
In my career as a piling / foundation worker I started on the ground as an offsider to a drilling rig and a crane. I worked very hard to achieve my goals became an operator early in my piling career then onto becoming senior operator with a new company that started in 2002 and which was AFS with AFS? I worked on a number of New South Wales government projects Lane Cove Tunnel Glenfield rail Williamstown Air Force Base and the big achievement with AFS spent 2 1/2 years supervising the Barangaroo project on Sydney Harbour from 2009 to 2012 in which I looked after over 55 workers which included crane operators steel fixes drill operators
Avopiling achievements with Avopiling was employed as a supervisor moving onto being a senior supervisor. I ran in controlled a number of New South Wales tier one major projects starting in 2016 with the M4 cut cover moving onto Saint Peter‘s interchange Roselle interchange Gateway project at botany and a number of railway projectsalong with major projects in W.A. in which were D wall based projects on Elizabeth Key along with major rail infrastructure in W.A. continued with more major projects and dealing with clients in New South Wales until recently was sent to Melbourne, as Victorian superintendent on the north Eastlink project at Bulleen Victoria in which I had to deal with with local stakeholders/union in negotiations with moving forward on the project a project in which had interface with all other trades
I have a very broad range of experience in the piling industry and it’s development throughout the years and new technologies-Dwall , Cased cfa , bored piles , working with drilling fluids bentonite and polymers , establishing site with new equipment being that of drilling rigs, cranes, cutters, and grabs