Tiler TA
Joshua Gardner Floor and Wall Tiling
Gladstone, QLD
12.2021 - 04.2022
- Waterproofing
- Prepared tiling surfaces using waterproofing materials and lath.
- Utilized a variety of powered and hand specialized tools including levels, spacers, cutters and grinders.
- Retrieving tools and assisting with manual labour
- Cleaned finished surface after installation by scrubbing with detergent solution or steam cleaner.
- Filled joints between tiles with grout according to specifications, using trowel and rubber float.
- Maintained cleanliness in the job site throughout the duration of the project.
- Adhered to safety regulations while handling hazardous materials such as glues or sealants.
- Cut flooring material to fit around obstructions using hand tools, dies and special equipment.
- Created straight, even and precise patterns using straightedges, levels and squares.
- Applied plaster and other troweled materials to walls and other surfaces and finished to smooth condition.
- Used hammers and masonry saws to construct, repair and demolish concrete walls and bases.
- Used a variety of hand tools such as knives, saws, chisels, floats.
- Mixed mortar by operating mixing drills and tools.
- Smoothed rough spots on wall surfaces using trowels and other hand tools.