Gareth Duggan

Upper Coomera,QLD

Summary

To attain employment within a dynamic organization that enables me to develop my current skills and knowledge base, while working diligently to exceed expectations and targets. I value myself as an innovative, passionate, and dedicated employee. I strive to provide high-quality leadership, modelling to achieve a positive environment that enhances the workplace to produce the best possible results.

Overview

23
23
years of professional experience
1
1
Certification

Work History

General Foreman

Hutchinson Builders
West Village, QLD
02.2025 - Current
  • West Village - Allere Collections- Duo and Uno Towers

2 x 20 Storey Residential Towers with 2 Levels Retail/Commercial Tenancies Levels beneath.

Assist in day to day operations programming, Coordination of Site Labour , Foreman , Crane Lifts/Schedules . Internal Finishes and Facade works

Managing Pool Construction on Roof Top and Resident Facilities .

Site Manager

Hutchinson Builders
PA Hospiital , QLD
11.2024 - 02.2025

Linac Bunker Upgrade

Manage the refurbishment of the Radiation Treatment bunker at Princess Alexander Hospital.

Full Strip out and upgrade in operational Oncology ward.

Including Installation of new UPS Room in Basement and co-ordination of all new service pathways and Installations.

Site Foreman

Hutchinson Builders
Queensland Rail , QLD
10.2023 - 10.2024
  • Station accessibility upgrades at Bundamba and Burpengary.
  • Q.A. Inspections for all off-site inspections with Q.R. inspector: inspection of all off-site construction of precast panels, lift panels, and precast train platforms. All steel fabrication of all elements used onsite, weld prep/welds of stairs, screen and pedestrian bridge over the railways.

Bundamba Station -March 2024 Onsite Full time

  • Installation of Precast Train platforms slabs.
  • Onsite preparation of Pedestrain crossover Bridge . Steel Fabrication, Floor and Screen Installation prior to Lift with 500 Tonne Mobile Crane over Railway Lines on S.C.A.S Shutdown.
  • Structural Ground Slabs Connecting Train Platform Panels
  • Inground Electrical/S.W/Sewer along platforms
  • Civil works for Carpark and drop off Zones upgrade including all inground services ,

Site Foreman

Hutchinson Builders
Tugun Satellite Hospital , QLD
10.2022 - 09.2023
  • 35-million-dollar project.
  • Structures through to Finishes
  • All civil works.

Foreman

Hutchinson Builders
Odyssey- Aged Care Robina , QLD
04.2022 - 09.2022
  • Assist in internal finishes/facade/landscaping and unit defects and client handovers.

Structure/Finishes Foreman

Tomkins Commercial
Silk One Apartments, QLD
10.2021 - 03.2022
  • 21 Storey Apartment Block with Retail and Office Spaces

Site Foreman

Pradella Constructions
Montague Markets
01.2019 - 10.2021
  • Stage 1 Apartment Tower Above Retail and Office Tenancies
  • $110 Million Project

Site Foreman

Hutchinson Builders
Skytower
01.2017 - 12.2018
  • $348 Million Project

Site Foreman

Pradella Constructions
Gardens Riverside
01.2015 - 12.2016
  • $150 Million Project

Leading Hand/Supervisor

Quantum Electrical and Data
Brisbane Airport
04.2011 - 01.2015
  • Manage installs of solar PV systems
  • Brisbane Airport – 140 KW
  • QUT Gardens Point – 3 x 9% trackers and 90Kw of ground mount tilt
  • UQ St Lucia – 140KW and 90 KW

Foreman

Evans Harch
Springfield State High School
10.2010 - 01.2011
  • $20 Million Project
  • Deliver New High School Facilities from Civil through to structures and finishes on a tight 6 Month program
  • Site Establishment/Set out
  • Set out of footings and slabs
  • Tie reo for footings/wall/stairs
  • Concrete cutting
  • Formwork suspended and in ground
  • Fitting of door locks/signage
  • Maintain safety on site

Site Foreman

Project Control Group
Origin Energy Head Office
01.2010 - 09.2010
  • $20 Million Project
  • Fit out of new office workstations, Reception and Staff cafes including all services.
  • Oversee contractors to deliver 3 stages of the job for handover on time.
  • Supervise all contractors from Mechanical, Fire, Electrical, Data, Security, Framers, Plasterers, Plumbers, Tilers, Joiners, Painters, Glass/Windows etc while working with clients occupying the building and liaising with building management on daily construction activities and deliveries.

Structure - Finishing Foreman

Australand
Solito Apartments, Carindale
02.2008 - 10.2009
  • $50 Million Project
  • North and Central Towers
  • 8 storey apartments 2 Towers
  • Set out and levels for Bulk Excavation
  • Co-ordination of all Contractors, Surveyors, Drilling/Piling
  • Concreter’s, Block layers, Crane/Rigging Crews, Scaffold, All Services trades and Finishing trades. All Q.A’s throughout project.
  • Handover Defects and Co-ordination.
  • Maintain buildings through 12 month defect period

Structure/Finishing Foreman

Watpac
Single L.E.A.P Accommodation
04.2007 - 02.2008
  • $70 Million Project
  • Oversee all works-Mark out and clear site ready for civil works.
  • Cut/Fill pads for buildings and start Stormwater and Sewer lines.
  • Co-ordinate in-ground services electrical, gas, water, fire with S.W and sewer construction.
  • Co-ordinate Surveyor, Drilling Rig for Bored piers, Soil Engineer, Steel and Concrete delivery.
  • Responsible for bored pier heights.
  • Oversee Pre-cast construction of Walls and Floors on site and all Q. A’s
  • Builders Q As on all in ground services, Pre casts, Pre-Sheet etc
  • Co-ordinate 180t Crawler Crane and erection of Walls and Floor Panels and Engineer Sign offs
  • Co-ordinate Roofing Contractor and rough-ins of electrical, Data, Gas. Water and all finishing Trades

Structure/Finishing Foreman

Mirvac Group
Orion Springfield Shopping Town Centre Stage 1
06.2005 - 02.2007
  • $180 Million Project
  • 195 working days, 115 personnel, 2300t Reo, 33,700m3 concrete, 38,000m2 slab on ground, 58,000m2 suspended slabs, 2t Reo/day, 2t stressing cable/day, 300m2 formwork/day, 120m3 concrete/day. Structure delivered nearly 2 months ahead of program.
  • Plan, organise and manage set-outs.
  • Levels of all ground works.
  • Manage all trades.
  • Involved; pile cappers, surveyors, steel fixers, plumbers, concreters, carpenters, electricians, excavators, cranes etc
  • Coordinate on-site delivery of pumps & concrete for pours up to 900m3.
  • Manage & update short term programs using Sure Track.
  • Handover of Big W, Best & Less, McDonalds and more.
  • Ensure all retail outlets were handed over on time & managed defects and coordination of subcontractor deliveries, changes & maintenance issues with little disruption to client.
  • Maintained high standard of Safe Work Environment through good housekeeping with a no nonsense approach to safety.

Structure/Finishing Foreman

J.M Kelly
Swell Residential & Hotel Apartments, Burleigh Heads QLD
07.2004 - 04.2005
  • $170 Million Project
  • Plan & organise cranes / delivery of pre-cast panels.
  • Manage and run Formwork crew
  • Managing and co-ordination of formwork, labour & rigging crews, all employed by the builder, while following work method statements and strict guidelines.
  • Plan & organise concrete pours while overseeing quantities and delivery to site
  • Manage set-out levels of all formwork, footings & slab levels in addition to wall panel erection, build suspended swimming pool on podium level.

Foreman

Rubicon
Byron Bay Services Club, NSW
07.2004 - 10.2004
  • $12 Million
  • Plan & organise fit out of new bistro while allowing Club to maintain trade.
  • Involved demolition of old Bistro which involved demolition of old kitchen, timber floors under tiles.
  • New F.C floor and drainage fitted with new feature ceiling and lighting.
  • All new bayonets, carpet, tiles, data & communication systems etc installed.
  • All new Bain Maries, Serving area etc
  • Toilets also demolished and re-tiled with new cisterns and partitions

Apprentice/Leading Hand

Mirvac Group
Cutters Landing - Refinery, New Farm QLD
03.2002 - 06.2004
  • $300 Million
  • Restoration of 100yr old Heritage listed building into million dollar award winning riverside apartments.
  • Many challengers were faced with the extensive refurbishment of all; brickwork, removals of lead paint (along Brisbane River).
  • Demolition of old timber floors.
  • Constructing suspended slabs inside the existing structure.
  • All original timber columns, beams & steel restored & used as features throughout the structure.

Education

Apprentice Carpenter -

01.2003

Senior Certificate -

Alexandra Hills SHS
01.1998

Skills

  • Construction operation support
  • Team leadership
  • Time management
  • Problem solving
  • Subcontractor management
  • Construction supervision
  • Commercial and residential projects
  • Worksite safety
  • Project planning

Certification

  • Course in General Safety Induction QLD (Construction Ind.)
  • Certificate 3 in Construction (2003)
  • First Aid/CPR
  • E.W.P Ticket
  • Low Voltage Rescue

References

  • Peter, Haideley, Site Manager, 0419 762 392, Hutchinson
  • Peter, Meland, Site Manager, 0409 812 613, Mulpha Group
  • Nathan, Sianidis, Project Manager, 0419 023 474, Watpac

Timeline

General Foreman

Hutchinson Builders
02.2025 - Current

Site Manager

Hutchinson Builders
11.2024 - 02.2025

Site Foreman

Hutchinson Builders
10.2023 - 10.2024

Site Foreman

Hutchinson Builders
10.2022 - 09.2023

Foreman

Hutchinson Builders
04.2022 - 09.2022

Structure/Finishes Foreman

Tomkins Commercial
10.2021 - 03.2022

Site Foreman

Pradella Constructions
01.2019 - 10.2021

Site Foreman

Hutchinson Builders
01.2017 - 12.2018

Site Foreman

Pradella Constructions
01.2015 - 12.2016

Leading Hand/Supervisor

Quantum Electrical and Data
04.2011 - 01.2015

Foreman

Evans Harch
10.2010 - 01.2011

Site Foreman

Project Control Group
01.2010 - 09.2010

Structure - Finishing Foreman

Australand
02.2008 - 10.2009

Structure/Finishing Foreman

Watpac
04.2007 - 02.2008

Structure/Finishing Foreman

Mirvac Group
06.2005 - 02.2007

Structure/Finishing Foreman

J.M Kelly
07.2004 - 04.2005

Foreman

Rubicon
07.2004 - 10.2004

Apprentice/Leading Hand

Mirvac Group
03.2002 - 06.2004

Apprentice Carpenter -

Senior Certificate -

Alexandra Hills SHS
Gareth Duggan