Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Gary Watson

Belgian Gardens

Summary

Accomplished Formwork Carpenter with extensive experience .specializing in constructing complex concrete structures. Proficient in Peri systems and conventional formwork, and delivering high-quality results under pressure. My strong attention to detail and collaborative approach ensure successful project completion, including significant contributions to major mining sites.

Overview

27
27
years of professional experience
1
1
Certification

Work History

Formwork Carpenter

Melchor contracting
Karratha
09.2023 - 03.2026
  • Constructed formwork for concrete structures using various formwork systems. Perdaman urea site karratha , Greenbushes lithium mine and west Musgrave BHP .
  • Built structural components including walls, pedestals, ductbanks, and suspended slabs to support construction efforts.

Formwork Carpenter

Whittens group
Snowy hydro 2.0
02.2018 - 07.2023
  • Completed workers camp tantangarra and lobs hole snowy hydro 2.0.
  • Carrapateena SA , all formwork duties including peri systems and conventional formwork.
  • Mach energy mine NSW , train loadout construct and escape tunnel works .

Formwork Carpenter

Fremantle construction
Barrow Island
05.2013 - 11.2017
  • Gorgan gas project carried out extensive wall construction around condensate tanks .
  • Inpex Darwin gas project , carried out works on stab joints and suspended compressor desks.

Formwork Carpenter

Shoreform
Sydney
02.2009 - 02.2013
  • Construction of electrical substation
  • Construction of water treatment plant . All types of formwork performed

Formwork Carpenter

Mwren formwork
08.2003 - 09.2008
  • Residential and commercial formwork. Suspended slabs , columns ,walls and slabs .

Combat Engineer

Australian army
Sydney
04.1999 - 06.2003
  • Conducted demolition operations to neutralize hazards and threats.
  • Constructed and maintained defensive positions for operational readiness.
  • Operated and maintained specialized engineering equipment on-site.

Education

Mater Maria Collage
Warriewood

Skills

  • Formwork and steel fixing
  • Peri and RMD systems
  • Walls and slabs

Certification

  • White card 462557
  • Excavator R11MD0320F
  • MR Truck licence
  • Working at heights R11WHS204D.
  • Confined space R11WHS202D .

Timeline

Formwork Carpenter

Melchor contracting
09.2023 - 03.2026

Formwork Carpenter

Whittens group
02.2018 - 07.2023

Formwork Carpenter

Fremantle construction
05.2013 - 11.2017

Formwork Carpenter

Shoreform
02.2009 - 02.2013

Formwork Carpenter

Mwren formwork
08.2003 - 09.2008

Combat Engineer

Australian army
04.1999 - 06.2003

Mater Maria Collage
Gary Watson