Summary
Overview
Work History
Education
Skills
Training And Qualifications
Professional Referees
Professional Overview
Attributes
Timeline
Generic

Greg Melinz

Ringtail Creek,Australia

Summary

SMP Supervisor with extensive expertise in safety management and quality assurance. Demonstrated success in ensuring compliance with WHS procedures while effectively coordinating projects. Skilled in leading teams to achieve timely and successful project completions.

Overview

26
26
years of professional experience

Work History

S.M.P Supervisor/Stand in Superintendent

UGL Engineering Pty Ltd
10.2023 - Current
  • Oversee daily operations on SMP project sites.
  • Supervise structural, cranes, rigging, mechanical, and piping works.
  • Coordinate trades, subcontractors, and site personnel.
  • Monitor work quality, schedule adherence, and safety performance.
  • Conduct daily pre starts, toolbox talks, safety briefings, and site inductions.
  • Liaise with project managers, engineers, and other stakeholders.
  • Ensure compliance with all WHS and site-specific safety procedures.
  • Maintain accurate records, reporting, and documentation.

SMP Supervisor

Sedgman/ CPB JV
06.2023 - 10.2023
  • Company Overview: Olive Downs CHPP.
  • Leading Hand responsibilities including control of daily work schedules, working closely with the client for QA inspection and sign offs, coordination of materials and equipment, attend daily progress meetings and supervision of up to 12 team members.
  • Commissioning of plant equipment.
  • Permit Authority, responsible for drafting Isolation permits for commissioning and maintenance works.
  • Defect rectification works.
  • Olive Downs CHPP.

Site Supervisor

Monadelphous
09.2021 - 05.2023
  • Company Overview: EC East Kawana STP Upgrade.
  • Overseeing safe and productive construction and installation and modification of structural, mechanical and piping components of the Kawana STP upgrade.
  • Overseeing the two-year maintenance and warranty period.
  • Maintain the highest level of safety by conducting regular safety audits, site inspections, development of safe work method statements, delivering pre-start and toolbox talks and encouraging the constant improvement of safe work practices amongst the crew.
  • Ensuring strict adherence to works conducted under permit systems.
  • These works included Installation of associated pipe works throughout the plant.
  • Preventative maintenance scheduling, execution and reactive maintenance of all plant systems, and modification on the needs ongoing design change.
  • Permit Authority, responsible for drafting and issuing Isolation permits for commissioning and maintenance works.
  • EC East Kawana STP Upgrade.

Leading Hand Mechanical Fitter

Monadelphous
04.2019 - 09.2021
  • Company Overview: EC East Kawana STP Upgrade.
  • Leading Hand responsibilities including control of daily work schedules, working closely with the client for QA inspection and sign offs, coordination of materials and equipment, attend daily progress meetings and supervision of up to 12 team members.
  • Commissioning of plant equipment.
  • Permit Authority, responsible for drafting Isolation permits for commissioning and maintenance works.
  • Defect rectification works.
  • EC East Kawana STP Upgrade.

Leading Hand Mechanical Fitter

UGL Limited
06.2018 - 03.2019
  • Company Overview: Talem Bend Solar project.
  • Leading Hand of the construction of 127MW, responsible for the installation and coordination of the mechanical aspects of the project including piling, racking structure installation and PV module installation.
  • Installation of Schnieder inverters.
  • Assist in construction of 132Kv Sub Station in the way of installation of Switch room and Control room buildings and associated structural steel.
  • Stand in for Supervisor when not on site, filling out daily timesheets and capturing dayworks.
  • Implementation of quality control procedures and documentation.
  • Reporting to the Mechanical Supervisors, Construction Manager and Engineering team, co-ordinate and monitor construction activities to ensure effective use of resources and maintain this in alignment with schedule and budget.
  • Promote a safe and productive culture within the crew.
  • Talem Bend Solar project.

Leading Hand Mechanical Fitter

UGL Limited
01.2018 - 06.2018
  • Company Overview: Collinsville Solar project.
  • Leading Hand of the construction of 42.5MW solar farm, responsible for the installation and coordination of the mechanical aspects of the project including piling, racking structure installation and PV module installation.
  • Installation of SMA inverters.
  • Stand in for Supervisor when not on site, filling out daily timesheets and capturing dayworks.
  • Implementation of quality control procedures and documentation.
  • Reporting to the mechanical Supervisors and Engineering team, co-ordinate and monitor construction activities to ensure effective use of resources and maintain this in alignment with schedule and budget.
  • Promote a safe and productive culture within the crew.
  • Collinsville Solar project.

Leading Hand Mechanical Fitter

UGL
12.2016 - 12.2017
  • Company Overview: KENTZ Ichthys Gas Train Project.
  • Leading Hand responsibilities including control of daily work schedules, working closely with the client for QA inspection and sign offs, coordination of materials and equipment, attend daily progress meetings and supervision of up to 25 team members.
  • Level 3 Flange management including tensioning of RTJ flange joints.
  • Confined Space Entry in vessels.
  • Removal and installation of pipe spools and vales weighing up to 32 ton.
  • Removal and installation of PSVs.
  • EWP operation up to 135 feet.
  • Promote a safe and productive culture within the crew.
  • Permit holder and applicant.
  • KENTZ Ichthys Gas Train Project.

Leading Hand Mechanical Fitter

UGL
11.2015 - 12.2016
  • Company Overview: CH2M Ichthys Combined Cycle Power Plant.
  • Leading Hand responsibilities including control of daily work schedules, coordination of materials and equipment, attend daily progress meetings and supervision of up to 20 team members.
  • Turbine alignments.
  • Stand in for Supervisor when not on site, filling out daily timesheets and capturing dayworks.
  • Punch listing for RFC hand overs.
  • Installation of preassembled units including setting out of heights and marking out Eastings and Northings to design drawings.
  • Installation of prefabricated pipe work and Flange management. (JKC Level 3).
  • From December 2016 to January 2017, I was the Permit coordinator for the CCPP construction team. This included setting up of the Permit Register. Writing of permits, keeping up to date with new permits and coordinated SIMOPS with the CCPP commissioning team.
  • CH2M Ichthys Combined Cycle Power Plant.

Senior SMP Supervisor

Kerman Contractors
12.2014 - 11.2015
  • Company Overview: Sino Iron Project.
  • Overseeing safe and productive construction and installation and modification of structural, mechanical and piping components of the Sino Iron project in the Pilbera WA.
  • Maintain the highest level of safety by conducting regular safety audits, site inspections, development of safe work method statements, delivering pre-start and toolbox talks and encouraging the constant improvement of safe work practices amongst the crew.
  • Ensuring strict adherence to works conducted under permit systems.
  • These works included Installation of associated pipe works throughout the plant, conveyor systems, cyclones, Ag Mills, Structural steel and module installation and modification on the needs ongoing design change.
  • Sino Iron Project.

SMP Supervisor

Leighton Contractors
01.2013 - 01.2014
  • Company Overview: APLNG Condabri and Reedy Creek Water Treatment Facilities.
  • Overseeing the safe and productive construction / installation of the structural, mechanical and piping components of the plant including the chemical storage and delivery systems from initial planning and mark outs through to hydro testing and pre-commissioning.
  • Maintain the highest level of safety by conducting regular safety audits, site inspections, development of safe work method statements, delivering pre-start and toolbox talks and encouraging the constant improvement of safe work practices amongst the crew.
  • Ensuring strict adherence to works conducted under permit systems, both Origin Energy and Leighton Contractors, including confined space and hydro testing.
  • Maintain a strict adherence to schedule and budgetary constraints via detailed workforce planning, material, labour and plant allocation.
  • Regular reporting of progress and delays to the construction manager.
  • Capturing and managing change and variation to the scope of works.
  • Liaise directly with the client daily and complete works under site instruction where necessary.
  • APLNG Condabri and Reedy Creek Water Treatment Facilities.

Mechanical Fitter/Leading Hand

Leighton Contractors
01.2012 - 01.2013
  • Company Overview: APLNG Condabri and Reedy Creek Water Treatment Facilities.
  • APLNG Condabri and Reedy Creek Water Treatment Facilities.

Maintenance Manager

Cooroy Mountains Spring Water
01.2003 - 01.2012

Maintenance Fitter

Camilleri Stock Feeds Pty Ltd
01.2000 - 01.2003

Education

Cert IV -

Competitive Manufacturing

Welding Tungsten Inert Gas -

TAFE

Fitting and Turning Certificate of Proficiency -

Trade Certificate

Skills

  • Safety management
  • Quality assurance
  • Project coordination
  • Permit management
  • Equipment commissioning
  • Construction supervision
  • Resource allocation
  • Team leadership
  • Complex Problem-solving
  • Workflow management
  • Multitasking Abilities

Training And Qualifications

  • RIICOM301E communicate information (S1)
  • RIIRIS301E apply risk management process (S2)
  • RIIWHS301E conduct safety and health investigation (S3)
  • RIIRIS402E carry out the risk management process (G2)
  • One HSE Leadership
  • RIIVEH305A – Operate and maintain a four-wheel drive vehicle
  • Cert IV in Competitive Manufacturing
  • Welding Tungsten Inert Gas (TAFE)
  • Fitting and Turning Certificate of Proficiency (Trade Certificate)
  • Section 44 Western Australian Mines Safety and Inspections Act 1984 Certificate.
  • Forklift Ticket (High Risk)
  • EWP (High Risk Over 11 meters)
  • Telehandler Gold card
  • Working at heights
  • Skid Steer Ticket
  • QLD HC Driver’s License
  • QLD White Card
  • Electrical Test and Tag Ticket
  • Confined Space
  • Gas Testing
  • Poly welding Electrofusion ticket

Professional Referees

  • Sean Riddiford, UGL Limited, Construction Director, 0410 311 591
  • Nic DePalma, UGL Limited, General Superintendent, 0418 555 130
  • Leigh Puschmann, CPB, Senior Supervisor, 0413 643 837
  • Glenn Flanagen, UGL Limited, Area Manager, 0499 451 105

Professional Overview

Highly skilled and experienced SMP supervisor with a trade background in Mechanical Fitting demonstrating a solid career history across the CSG, power generation, construction, mining, renewables and commercial sectors. Maintaining a firm commitment to completing projects on time with attention to detail and adherence to regulatory standards and industry best practice. Excellent communication and time management skills, leading by example to contribute to successful team operations. Technical trade skills are consolidated by positive and professional demeanor, a strong work ethic and an ongoing commitment to safe work practices.

Attributes

  • Experienced SMP supervisor/Leading Hand
  • High level people management skills
  • Able to conduct ‘difficult’ conversations for conflict and personnel management.
  • Sound analytical skills
  • Computer literate with experience in E7, Word, Excel, Visio

Timeline

S.M.P Supervisor/Stand in Superintendent

UGL Engineering Pty Ltd
10.2023 - Current

SMP Supervisor

Sedgman/ CPB JV
06.2023 - 10.2023

Site Supervisor

Monadelphous
09.2021 - 05.2023

Leading Hand Mechanical Fitter

Monadelphous
04.2019 - 09.2021

Leading Hand Mechanical Fitter

UGL Limited
06.2018 - 03.2019

Leading Hand Mechanical Fitter

UGL Limited
01.2018 - 06.2018

Leading Hand Mechanical Fitter

UGL
12.2016 - 12.2017

Leading Hand Mechanical Fitter

UGL
11.2015 - 12.2016

Senior SMP Supervisor

Kerman Contractors
12.2014 - 11.2015

SMP Supervisor

Leighton Contractors
01.2013 - 01.2014

Mechanical Fitter/Leading Hand

Leighton Contractors
01.2012 - 01.2013

Maintenance Manager

Cooroy Mountains Spring Water
01.2003 - 01.2012

Maintenance Fitter

Camilleri Stock Feeds Pty Ltd
01.2000 - 01.2003

Cert IV -

Competitive Manufacturing

Welding Tungsten Inert Gas -

TAFE

Fitting and Turning Certificate of Proficiency -

Trade Certificate
Greg Melinz