Stained woodwork including cabinets, doors and furniture pieces upon request.
Used sandpaper to scrape walls and other surfaces to remove old paint.
Performed series of surface preparation techniques to maximize paint durability.
Maintained thorough inventory of paint equipment and supplies by checking product levels.
Filled cracks, holes or joints using caulking guns or putty knives.
Removed fixtures such as door knobs, light switch covers, window sashes and hardware prior to painting.
Sanded down existing finishes that were peeling or cracked before repainting them.
Completed high-volume weekly painting jobs with consistently positive customer feedback.
Spread undercoats and finish materials using rollers and spray equipment.
Inspected work sites to measure dimensions, lay out work and estimate materials for each job.
Calculated cost and quantities of required materials based on surface measurements or work orders.
Calculated amounts of required materials and approximate time to complete each project to estimate project costs.
Protected floors and furniture from paint spills using drop cloths.
Met with clients to discuss color and finish options and other design details.
Selected and purchased tools or finishes for surfaces to be covered.
Operated airless spray equipment and motorized lifts.
Cleaned and properly stored paint equipment and supplies at end of each workday.
Smoothed and finished surfaces on walls, trim and cabinetry.
Measured wall area accurately to determine amount of material needed for each project.
Cleaned and smoothed surfaces prior to painting.
Repaired drywall defects prior to painting by patching holes or sanding rough spots.
Applied primers or sealers to prepare bare wood or metal for finish coats.
Covered surfaces and furnishings with cloth and plastic to protect from paint drops.
Used putty knives and caulking guns to fill cracks, holes and joints with plaster, putty and caulk.
Sanded, stripped, brushed and power washed surfaces to clean and smooth, ensuring adherence of paint and primer.
Sprayed prepared surfaces with specified amounts of primers and finish coatings.
Removed fixtures and electric switch covers prior to painting.
Provided work order cost estimates based on anticipated type and quantity of materials needed and total project surface area.
Selected appropriate materials such as primers, paints, thinners, varnishes and stains in accordance with job requirements.
Covered floors before prepping, priming and painting walls and ceilings to protect them from chemicals and paint.
Readied surfaces and surrounding areas for painting with sandpaper, tape and other materials.
Mixed paints and solutions and monitored consistencies.
Inspected areas for needed repairs before applying primer or final coat of paint.
Monitored paint supplies, placing orders whenever needed and properly and safely disposed of old paint.
Removed pictures, door knobs or electric switch covers prior to painting.
Prepared surfaces for painting by filling cracks, holes and other imperfections with caulk or putty.
Applied paints, sealers and solvents to plaster, sheetrock, concrete and wood.
Used power and hand tools safely and effectively.
Calculated amounts of materials and estimated cost based on surface measurements or work orders.
Performed repairs to defects in walls by patching holes and scrapes prior at project start.
Mixed paint according to manufacturer's specifications and applied coats of paint using brushes, rollers, and spray guns.
Applied paint, stain and varnish to wood, metal, plastic and drywall both inside and outside of residential dwellings using sprayers, brushes and rollers.
Mixed and applied paints, varnishes and sealants to promote lasting finish.
Performed minor plaster repair, blending newly renovated wall surfaces with existing plaster.
Primed and sealed unfinished wood, plastic and metal surfaces to prepare for additional coats of paint and other finishing substances.
Selected, mixed and applied surface coatings to match and restore interior or exterior surfaces.
Used brushes, spray guns and paint rollers to paint exterior surfaces.
Provided estimates on labor costs based on customer requests.
Applied primers or sealers to prepare new surfaces for finish coats.
Chose correct brushes and materials for jobs and purchased from vendors.
Received work orders from supervisors and clients to determine scope of work, materials needed and other job requirements.
Calculated the amounts of materials required to complete each job accurately.
Painted walls and other surfaces using traditional and sprayer methods and worked efficiently to complete jobs within required timeframes.
Smoothed surfaces using sandpaper, scrapers or sanding machines.
Vacuumed up dust after sanding surfaces prior to painting them.
Identified surface to be covered and characteristics of finish to properly select roller, power sprayer and right size brush.
Primed, smoothed and cleaned trim, walls and ceilings to prepare for painting tasks.
Applied sealants to protect painted surfaces from weathering elements.
Completed day-to-day duties accurately and efficiently.
Maintained open communication with team members and stakeholders, resulting in successful project outcomes.
Assisted with customer requests and answered questions to improve satisfaction.
Planned and completed group projects, working smoothly with others.
Recognized by management for providing exceptional customer service.