Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.
Overview
4
4
years of professional experience
1
1
Certification
Work History
Advanced Scaffolder
APS Industrial Services Pty Ltd
Melbourne, VIC
06.2023 - 05.2025
Erected guard rails around hazardous areas where workers could be exposed to danger.
Performed regular maintenance checks on scaffolding equipment and tools.
Ensured compliance with health and safety regulations in relation to scaffolding operations.
Inspected existing buildings prior to erecting new scaffolds, ensuring that they were fit for purpose.
Maintained records of all inspections carried out on site including any repairs undertaken.
Communicated effectively with other members of staff involved in the same project.
Provided advice on design modifications which could improve safety levels during construction works.
Maintained a safe working environment by adhering to safety regulations and standards.
Interpreted technical drawings to determine the most suitable type of scaffold required for a project.
Installed temporary access platforms such as ladders, stairs, bridges, and ramps as required.
Trained personnel in basic principles related to working safely at height while using a variety of access equipment.
Planned efficient work processes to ensure timely completion of tasks within budget constraints.
Followed detailed instructions from supervisors when constructing complex scaffolding designs.
Assembled and erected scaffolding structures for various projects.
Assisted in the loading, unloading, and transportation of materials needed for scaffolding jobs.
Checked the safety of scaffolding structures and ensured that they met industry standards.
Secured all necessary permits prior to beginning any job involving the use of a mobile crane.
Safely constructed hung, tube and clip and modular scaffolding systems.
Alleviated safety accidents by operating according to strict schedules and safety guidelines.
Safely and accurately built scaffolding in confined spaces like cooling towers.
Cleaned and organized work areas to prevent accidents and dangerous situations.
Checked material inventories and ordered new items as needed to prevent shortages.
Read and utilized blueprints for correct scaffolding construction.
Broke down structures following project completion.
Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
Leading Hand
Scope Access Scaffolding
Altona, VIC
04.2023 - 06.2023
Constructed scaffolds in appropriate positions and secured completed structures in place.
Cleaned and organized work areas to prevent accidents and dangerous situations.
Broke down structures following project completion.
Analyzed base surfaces to identify potential obstructions or safety hazards.
Inspected structures to locate potential weak points or safety hazards.
Cut down boards and plywood panels to meet appropriate size requirements.
Read and utilized blueprints for correct scaffolding construction.
Operated machinery in busy environments and maintained safety around equipment, people and other projects.
Designed new employee training program to share best methods for assembling and disassembling scaffolding.
Advanced Scaffolder
MI Scaffold Access & Rigging
Brisbane, QLD
07.2022 - 01.2023
Unloaded equipment and materials and moved supplies around on job sites in various weather conditions.
Safely and accurately built scaffolding in confined spaces like cooling towers, zinc thickeners, concentrator tanks and power stations.
Worked efficiently at ground height and at levels as high as 80 meters.
Safely constructed hung, tube and clip and modular scaffolding systems.
Safely assembled scaffolding in and around buildings for multiple different projects.
Removed and disassembled scaffolding and pieces weighing over 20kg at end of each shift or project and loaded all materials into trucks.
Operated machinery in busy environments and maintained safety around equipment, people and other projects.
Have efficiently worked 5 years in the industry without any safety incidents while operating according to strict schedules and safety guidelines.
Learned and are still learning skilled trade specialties under guidance of expert mentors. (Refer to references provided)
Demonstrated best safety practices working at heights and lifting various objects.
Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
Understood how to operate and maintain job site equipment safely and for maximum productivity.
Assisted with diverse construction challenges to help team and customer.
Performed demanding physical work over extended periods and modeled positive attitude.
Displayed high standards for quality workmanship and routinely double-checked work.
Worked productively as lead or helping team member and drove customer satisfaction.
Gained independent working skills and guided and mentored less experienced team members.
Executed construction tasks from detailed written and oral instructions.
Always in the process of adapting to different teams and methods used to carry out all scaffold works in a safe and positive manner.
Able to construct scaffold from a detailed plan or by eye to tailor to the task at hand.
A broad level of experience across the residential, commercial and industrial sectors in my time in the industry.
Safely assembled scaffolding in and around buildings for multiple different projects.
Cleaned and organized work areas to prevent accidents and dangerous situations.
Checked material inventories and ordered new items as needed to prevent shortages.
Continuous works on stacker/reclaimer, transfer towers, dump stations, trestle & ship loader terminals offshore.
Used different variations of cranes to assist our crew in getting scaffold to the requested location/s.
Used different types of slings/chains to safely lift loads of various sizes.
Forklift operating to assist with transporting scaffold to various locations wherever it is required for build/dismantle or where the crane is located.
Intermediate Scaffolder
Dawson's Engineering
Cairns, QLD
04.2022 - 07.2022
Safely constructed hung, tube and clip and modular scaffolding systems.
Read and utilized blueprints for correct scaffolding construction.
Constructed scaffolds in appropriate positions and secured completed structures in place.
Repaired and replaced faulty or damaged scaffold materials.
Cut down boards and plywood panels to meet appropriate size requirements.
Inspected structures to locate potential weak points or safety hazards.
General pre/post shutdown works.
Erected safe access in major plant areas (Granulator, Acid Plant, Ammonia Plant, Feed belts, Transfer Towers)
Rail Operator
Martinus Rail
Brisbane, QLD
01.2021 - 12.2021
Flashbutt production line (off siding for flashbutt welding head, all forms of grinding including roughs & finals)
SLM (Sleeper Laying Machine) Operator & all works involved maintenance, repairs & servicing
Building of turnouts both temporary and permanent including construction of rail sidings
Rail dragging and sleeper deliveries at designated lay down areas
Clipping/unclipping up via applicators, hammers & harleys
Line marking on formation for sleeper pack spacing
Cutting and blending overlap rail
Distribution of clips pads and biscuits
Sleeper & clip corrections to measurement
Ballast distribution and loading of ballast wagons
Wagon assembly with plant fitters
Dragging/rolling rail via vortex rollers
Traffic control/spotting loaders & other plant
Dogging
Excavator/skid steer operation as a greenhorn under supervision of a industry expert for 2 months
Have current SARC, WET & RIW Card, Open class drivers license + 7 cores
Inspected parts of tracks to identify areas needing repair or maintenance service.
Adjusted previously laid track parts to promote long-term maintenance objectives and maintain safety targets.
Lubricated machines, changed oil and filled hydraulic reservoirs to specified levels.
Completed maintenance and repairs on tracks and adjacent equipment.
Reshaped worn or damaged railroad switch points with portable power grinders.
Welded newly laid track parts to existing parts and verified proper joining and work quality.
Studied work schedules to plan and carry out timely and efficient repairs.
Verified leveling indicator arms to align tracks.
Worked closely with team members to deliver project requirements, develop solutions and meet deadlines.
Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.
Juggled multiple projects and tasks to ensure high quality and timely delivery.
Demonstrated self-reliance by meeting and exceeding workflow needs.
Provided excellent service and attention to customers when face-to-face or through phone conversations.
Exceeded customer satisfaction by finding creative solutions to problems.
Motivated and encouraged team members to communicate more openly and constructively with each other.