Summary
Overview
Work History
Skills
Reference
Timeline
Generic

Ivan Katusa

Mollymook,Australia

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

2026
2026
years of professional experience

Work History

General brick labourer

  • Working with concrete mix carying bricks around the site
  • Mixed, applied, and smoothed mortar onto work surfaces to achieve coverage and good bonding
  • Worked with clamps and anchoring attachments to fasten brick facades to building structures for safety and durability.

Laborer,Trade Assistance

John Holland,,Zenith Workforce
10.2023 - Current
  • Performed general housekeeping and cleaning tasks.
  • Loaded and unloaded materials onto trucks and trailers.
  • Cleaned and maintained tools, equipment and worksites.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Grinding And Cutting Steel
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Helped with erecting scaffolding and ladders.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Improved worksite efficiency by maintaining clean and organized work areas.
  • Used variety of hand and power tools to complete tasks.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Pressure Gun Cleaning
  • Using Brick's And Blocks Cutting Machine
  • Working With Water Pump's,,(Dewatering)
  • Concrete Pour Finishing Touches
  • Exclusions Zone's Setup

SHOALHAVEN HOSPITAL

Delta Group
09.2023 - Current

-Under ground Pipes Install

-spotting for Machinery Operations

-Cleaning the Site

-Working With D.P.U Unit

-Fence Paneling

-Steel Cutting

-

  • Worked alongside team to accomplish work goals according to schedule.
  • Understood and followed verbal and written instructions to complete work correctly.
  • Dug trenches, ditches and holes to allow for utility, water and sewer installation and proper foundation for structures.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Mixed and poured concrete for variety of projects.

Nowra Bridge Project

Fulton Hogan
05.2021 - 08.2023
  • Dug trenches and set up forms to specified requirements for concrete pours.
  • Mixed and poured concrete for variety of projects.
  • Assisted in digging, trenching and backfilling trenches and foundations
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction
  • Fixing Road Defects Around the Site
  • Drilling Concrete
  • Environmental Controls
  • Installing Bridge Handrails and Medium Barriers
  • Operating DPU Unit For Compaction
  • Spread asphalt, gravel and other materials at work locations using variety of tools and equipment.
  • Clear areas in preparation for laying down asphalt.
  • Used variety of hand and power tools to complete tasks.
  • Spotting For Machinery on Site
  • Steel Cutting
  • Grinding
  • Manual trench Digging
  • Eco Drain Install
  • Sanding Concrete Barriers
  • Using HB-70 and FC Render
  • Fence Panels Setup And Removals on the Site
  • Installing noise reduction panels
  • Storm water Pipes Install
  • Pressure Gun Cleaning
  • Delineating Around Deep Excavations Area's

Trade assistant

Duratec
06.2020 - 01.2021
  • Used power tools on the job, including drills and saws
  • Drilled holes in walls, dug trenches, and broke up concrete to prepare structures for installation
  • Performed work independently without direct supervision
  • Cleaned and maintained the worksite and complied with applicable safety regulations
  • Lifted, positioned, and secured materials and components required
  • Set up and broke down temporary structures such as scaffolding, barricades, and hoists
  • Used hand and power tools such as shovels, drills and air hammers to break up existing materials, dig trenches and drill holes
  • Drilled holes and threaded wires and cables through ducts or conduits using hand and power tools
  • Finished building grounds by assisting with landscaping and pouring concrete or spreading asphalt
  • Cleaned, coated and sealed surfaces to complete construction jobs
  • Insulation install and Removal cleaning the site
  • I
  • Flagging the Area building demolition
  • References: Mark Candles

General Laborer

Ace demolition, Hmass
05.2019 - 05.2020
  • Coordinated traffic around work areas for team safety and to protect general public
  • Set up simple and complex ladder systems and scaffolds to help workers reach work locations
  • Completed tasks wearing respirators or other personal protective equipment to defend against hazardous conditions and dangerous elements
  • Prepared site by putting up rails and safety screens, laying dust sheets, and separating re-usable building materials after demolition
  • Utilized specialist equipment to safely remove hazardous materials, including asbestos and toxic chemicals
  • Stripped out fittings, removed doors and windows, and dismantled roof structures to prepare for demolition
  • Complete building demolition
  • References:Rami

General labourer

11.2018 - 06.2019
  • Set up simple and complex ladder systems and scaffolds to help workers reach work locations
  • Followed instruction for assigned tasks from foreperson and lead teams in performing new phases of the work
  • Ensured proper operation of tools and equipment at the site following safety requirements
  • Concrete patching cleaning the building site cutting the steel mesh
  • Digging flagging the building area using power tools
  • References:Mick peters

Bridge General Laborer

BGC Construction, Burill
07.2016 - 11.2018
  • Used grinders, sanders, and polishing compounds to achieve desired finishes on different surfaces
  • Finished building grounds by assisting with landscaping and pouring concrete or spreading asphalt
  • Cleaned construction sites to prepare for new installations
  • Followed established guidelines and procedures
  • Completed assigned tasks with little or no supervision
  • Communicate with site supervisors and team members to complete project objectives on schedule
  • Trench digging
  • Fence installation and removal underground water pipe installation
  • Concrete patching picking pieces of steel with magnet
  • Built forms for concrete pour and assisted carpenters with rough carpentry tasks
  • Cleaned construction sites to prepare for new installations
  • Rocks removal under the bridge flagging the area
  • Road signs installation
  • Ground compaction using Trench rammer
  • Road lane markings
  • Ensured proper operation of tools and equipment at the site following safety requirements
  • References:Greg

Concrete Laborer

Stylish Concreting
02.2015 - 02.2016
  • Used edging tools and jointers to mold expansion edges and joints
  • Spread, leveled, and smoothed concrete using rakes, shovels, and power trowels
  • Monitored the weather to predict its impact on the concrete curing process
  • Created the necessary smooth or rough finish with tools such as trowels and brooms
  • Repaired damaged concrete by cutting out the problem areas and inserting reinforcing rods
  • Compacted concrete with use of power vibrator.

Laborer

Brick
09.2009 - 04.2014

Skills

  • Concrete patching Equipment maintenance
  • Materials handling Safety understanding
  • Hand tool operations Creative thinking
  • Organization Verbal communication
  • Waterproofing trench digging
  • Power tools operating A high level of physical fitness
  • Strenght to lift heavy objects ability to work in all weather
  • Flexibility to work with different crews
  • PROFESSIONAL SUMMARY
  • I am a fast learner and willing to follow instructions,I have experience in
  • Bricklaying,Construction labour work bridge and Road works
  • Grinding Work
  • Hammer Drills
  • Adhesive and Grouting
  • Pressure Washing
  • Tools and Equipment
  • Cement Mixing
  • General Housekeeping
  • Safe Handling
  • Heavy Labor

Reference

Mark Candles-0422-007-625

DURATEC FOREMAN.


Rami-0416-662-444

ACE DEMOLITION SUPERVISOR.


Mick Peters-0448-861-576

UGL SUPERINTENDENT


GREG-0457-737-036

BGC SUPERINTENDENT


TED ZORAJA-0425-812-067

A1 STYLIST CONCRETE.


Regan Boyle-0412-257-561

FULTON HOGAN FOREMAN.


JAY-0432-194-763

DELTA GROUP SUPERINTENDENT.


Chris Sikes 0400-146-219

John Holland Shoalhaven Hospital Project Manager

Timeline

Laborer,Trade Assistance

John Holland,,Zenith Workforce
10.2023 - Current

SHOALHAVEN HOSPITAL

Delta Group
09.2023 - Current

Nowra Bridge Project

Fulton Hogan
05.2021 - 08.2023

Trade assistant

Duratec
06.2020 - 01.2021

General Laborer

Ace demolition, Hmass
05.2019 - 05.2020

General labourer

11.2018 - 06.2019

Bridge General Laborer

BGC Construction, Burill
07.2016 - 11.2018

Concrete Laborer

Stylish Concreting
02.2015 - 02.2016

Laborer

Brick
09.2009 - 04.2014

General brick labourer

Ivan Katusa