Diligent Site Manager with solid background in leading teams and ensuring project completion to high standards. Successfully supervised multiple projects, demonstrating reliability and precision in task management. Proven ability in team coordination and problem-solving to maintain workflow efficiency.

Overview

2025
2025
years of professional experience

Work History

Leading Hand

Draycon Construction
01.2013 - 04.2014
  • Fitout six levels Suncorp building
  • Liaised with the building manager on a daily basis
  • Day/night works were required to achieve a restricted timeline.

Leading Hand

Draycon Constructions
  • Project Cost $67m - 3 tower building 155 apartments for TopPlace
  • Assisted the SM with all day to day activities/ ITPs

General Foreman

Growthbuilt
  • Project Cost $37m – 67 residential units with street level commercial and retail tenancies
  • 3 split level basements with a communal pool
  • Site Safety Officer/ Site First Aider
  • Liaising with consultants prior to fitout commencing
  • Preparing and checking Inspection and Test Plans (ITPs)
  • Responsible for constructing defect list for all apartments
  • Worked closely with the developer to assist in the handover of apartments.

Site Manager

Growthbuilt
  • Project Cost $1.5m 23 bathroom fitout across 10 levels and two towers
  • Liaising with trades, security and building management on a daily basis
  • Organizing works in specific times to ensure businesses were not interrupted or interfered with
  • Constant communication with trades and security regarding logistics of all deliveries.
  • Consistently going between day/night shift to ensure programme dates were meant

Site Manager

Growthbuilt
  • Project cost $8m - 3 Luxury apartments across the road from Balmoral beach with a single level basement
  • Boundary to boundary site with no crane or forklift
  • Liaised with client on a weekly basis to ensure quality and programme were upheld
  • Responsible for various tasks including concrete pours, external facades, programming and subcontractor supervision
  • Coordinating logistics on an hourly basis
  • Strategically organizing all works and deliveries to ensure work flowed without interference

Site Manager

Lords Group
11.2019 - 04.2021
  • Project cost: $12m - 9 Luxury Apartments with a double height above ground basement
  • Complex project as situated on a main road and set back in a battle axe driveway surrounded by 5 other apartment complexes
  • No workzone or permanent crane onsite
  • Client - 'FORTIS' a renowed developer in the Eastern suburbs
  • Master Builders Association of NSW 'Excellence in Housing Award' WINNER - Home Units $2 million- $3 million "Marmont Double Bay"

Site Manager

Apollo Square
  • Project Cost $300k - house renovation of an existing single storey dwelling for myself
  • Completely stripped back an existing house to expose the timber framing and installed new roof, wiring, plumbing, mechanical ducts, relocated many walls and replaced the existing flooring

Site Manager

Younis Constructions

Site Manager

Lords Group
07.2022 - 03.2024
  • Project Cost $25m - 14 luxury apartments across from Bellevue Hill golf course
  • All external walls were made from RC moulds - no hebel was used on the project externally
  • Communal pool as well as a private pool on penthouse rooftop
  • Worked closely with interior designs, architects, engineers and other consultants in design meetings as well as through any RFIs
  • Complex site logistically due to large amount of heritage trees and vegetation surrounding the site which made it difficult to use the crane to take deliveries and store material around site
  • Boundary to boundary site
  • Shoring wall used a CASTEC system instead of a typical sheet piling due to the conditions of the site (sand)
  • Client - Made by Clutch


Site Manager

Lords Group
04.2024 - Current
  • Project cost $30m - 12 luxury apartments in Rose Bay
  • Took over project from a previous SM who left the company- currently in the process of obtaining OC
  • 2 x swimming pools/ rooftop terrace with 12 private garages on a single level basement
  • Client - FORTIS

Education

Bachelor of Construction Management -

University of Western Sydney
01.2016

Higher School Certificate -

Parramatta Marist High
01.2012

Skills

  • Team Development/ Working in a team
  • Safety Management/ Safety identification
  • Innovation Skills/ Problem solving
  • Site Logistics/ Microsoft Project (Programming)

Awards

Master Builders Association of NSW 'Excellence in Housing Award' WINNER Lords Group Home Units $2 Million - $3 Million "Marmont" Double Bay

Timeline

Site Manager

Lords Group
04.2024 - Current

Site Manager

Lords Group
07.2022 - 03.2024

Site Manager

Lords Group
11.2019 - 04.2021

Leading Hand

Draycon Construction
01.2013 - 04.2014

Higher School Certificate -

Parramatta Marist High

Leading Hand

Draycon Constructions

General Foreman

Growthbuilt

Site Manager

Growthbuilt

Site Manager

Growthbuilt

Site Manager

Apollo Square

Site Manager

Younis Constructions

Bachelor of Construction Management -

University of Western Sydney