Caltex Northern Products Pipeline Project, Fairview Switchyards, North Eveleigh 11KV Relocation, Geelong Crude Tank Construction Work on these sites included: Procurement and maintenance for civil and mechanical crews, QA and document control, LV and communications installation and fit out
Electrician
National Cable Installations
01.2012 - 06.2013
Brisbane Airport Link Tunnel QLD, FMG Solomon Power Station WA, QGC camps Dalby QLD, Woleebee Creek QLD Work on these sites included: Working from plans, cable selection and run lengths, Terminations and conduit work, Switchboard installation, Cable installation using a variety of hydraulic and electric winches (up to 60kn), Wide range of cable installation (HV, optic fibre, sensor cables, RF cables)
Laborer
Shannon Construction Pty Ltd
01.2011 - 01.2012
Caltex Kurnell NSW and Lytton QLD Refineries, Warragamba Dam Deep Water Access Project NSW, Lindfield NSW Substation Upgrade, Pioneer Valley QLD Substation Upgrade Work on these sites included: Steel fixing and formwork, Concreting, Operating machinery such as bobcats, telehandlers, excavators and small trucks
Electrical Apprentice
WH Electric Co
01.2007 - 01.2011
Schools, Office blocks and high density residential buildings Tasks included: Fault finding, Submain and switchboard upgrades, Power, lighting and data, Refurbishments and new installations
Licenses And Tickets - Licenses
NSW Car License
OH&S General Induction Card
NSW Electrical Contractors License
RIW / RISI Trained
Senior First Aider
Working At Heights
Low Voltage Rescue / CPR
QLD High Risk Forklift Ticket
Excavator VOC
Telescopic Handler VOC
Work Profile
11 years’ experience in the electrical and civil industries including Infrastructure projects, Oil refineries and terminals, Domestic, commercial and industrial electrical installations, FIFO experience, Excellent record for safety and workmanship, Substation/ HV experience, Reliable and adaptive to situations, Experience running a small work crew
Personal Information
Date of Birth: 12/19/88
References
Jason Shaw, Supervisor, Downer EDI, 0422 227 368
Brian Warde, Manager, Galway Civil, 0497 073 030
Chris Toman, Operations Manager, Shannon Australia, 0415 620 615