Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

James Ryan Donnelly

Perth

Summary

  • Extremely competent in all things formwork, from bridges, slabs, footings and walls, to high rise apartments, and am looking forward to a change in the Oil and Gas industry.
  • Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
  • Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level Oil Rig position. Ready to help team achieve company goals.
  • Strong understanding of safety protocols and compliance in remote and high-risk environments.
  • Adaptable to work in challenging weather conditions and isolated settings.
  • Experience working in a team-based environment and maintaining high levels of collaboration.
  • Skilled in problem-solving and critical thinking to troubleshoot complex issues.

Overview

15
15
years of professional experience
1
1
Certification

Work History

Formwork Carpenter

FSC Civils
07.2019 - Current
  • My first 13 months work with FSC civils was FIFO on the following sites
  • BHP Southflank, general formwork for mine extention
  • Rio Tinto Gudai Darri, formwork slabs and pads for stackers and reclaimers
  • Roy Hill forming of footings and slabs for new crusher and electrical transformer pit
  • During my time with FSC Civils I have also worked on metro projects
  • NEWest Ranford Rd bridge, concrete placement on bridge deck and forming of crash barriers
  • MELconnx Beechboro Rd bridge leading hand form worker i over saw tasks of set out, installation and stripping of form work and placement of thousands of cubic meters of concrete for footings, walls and the bridge deck. managing task, materials and job preparation for 12-17 workers following all SWMS procedures.
  • NEWest Yanchep station R16 retaining walls leading hand form worker i over saw tasks of setting out, installation and stripping of formwork shutters and steel mats were installed and striped correctly while following all SWMS procedures. managing materials and a work crew of 12-17 workers
  • Perma-cast pre cast yard.

form work for pre cast headstocks for Bayswater Metronet project

Formwork Carpenter

Australian Concrete Constructions
06.2018 - 07.2019
  • During my time with ACC I performed a wide range of tasks covering all aspects of traditional form work including
  • Erecting bearer and joist decks with acrow props and H beams
  • Sheeting out the decks and cutting in between tables working with a harness
  • Forming up very technical beams and soffits using timber and ply
  • Forming up edge board and laying down fillet
  • Construction of control joints using hi-rib and inclusion points for post-tension strands
  • Forming up structural columns and walls
  • Cutting in ply around piles in the basements
  • Leveling with laser level
  • Instillation of wet area FFl steps.

Formwork Carpenter

Advance Formwork
05.2018 - 07.2019
  • reading plans and erections of base slab footings
  • reading plans, set out, forming and striping of stair cases
  • set out forming and striping of structural columns
  • forming, striping and cutting in of peri sky deck
  • interaction with luffer cranes in installation of formwork shutters

K Wallace Constructions Pty Ltd
01.2009 - 01.2013
  • General residential construction and renovations tasks such as Hanging doors and furniture, Skirting and architrave, Patios, Roof plumbing (sheeting, gutter and down pipes) Timber decks, General maintenance, Plaster sheeting walls and ceilings

Education

La Salle College
Perth

Skills

  • Strong understanding of safety protocols and compliance in remote and high-risk environments
  • Adaptable to work in challenging weather conditions and isolated settings
  • Experience working in a team-based environment and maintaining high levels of collaboration
  • Skilled in problem-solving and critical thinking to troubleshoot complex issues

Certification

Certificate III in Carpentry and Joinery, 2011

Working at Heights ticket

EWP ticket

Construction Industry White Card

Timeline

Formwork Carpenter

FSC Civils
07.2019 - Current

Formwork Carpenter

Australian Concrete Constructions
06.2018 - 07.2019

Formwork Carpenter

Advance Formwork
05.2018 - 07.2019

K Wallace Constructions Pty Ltd
01.2009 - 01.2013

La Salle College
James Ryan Donnelly