Extremely competent in all things formwork, from bridges, slabs, footings and walls, to high rise apartments, and am looking forward to a change in the Oil and Gas industry.
Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level Oil Rig position. Ready to help team achieve company goals.
Strong understanding of safety protocols and compliance in remote and high-risk environments.
Adaptable to work in challenging weather conditions and isolated settings.
Experience working in a team-based environment and maintaining high levels of collaboration.
Skilled in problem-solving and critical thinking to troubleshoot complex issues.
Overview
15
15
years of professional experience
1
1
Certification
Work History
Formwork Carpenter
FSC Civils
07.2019 - Current
My first 13 months work with FSC civils was FIFO on the following sites
BHP Southflank, general formwork for mine extention
Rio Tinto Gudai Darri, formwork slabs and pads for stackers and reclaimers
Roy Hill forming of footings and slabs for new crusher and electrical transformer pit
During my time with FSC Civils I have also worked on metro projects
NEWest Ranford Rd bridge, concrete placement on bridge deck and forming of crash barriers
MELconnx Beechboro Rd bridge leading hand form worker i over saw tasks of set out, installation and stripping of form work and placement of thousands of cubic meters of concrete for footings, walls and the bridge deck. managing task, materials and job preparation for 12-17 workers following all SWMS procedures.
NEWest Yanchep station R16 retaining walls leading hand form worker i over saw tasks of setting out, installation and stripping of formwork shutters and steel mats were installed and striped correctly while following all SWMS procedures. managing materials and a work crew of 12-17 workers
Perma-cast pre cast yard.
form work for pre cast headstocks for Bayswater Metronet project
Formwork Carpenter
Australian Concrete Constructions
06.2018 - 07.2019
During my time with ACC I performed a wide range of tasks covering all aspects of traditional form work including
Erecting bearer and joist decks with acrow props and H beams
Sheeting out the decks and cutting in between tables working with a harness
Forming up very technical beams and soffits using timber and ply
Forming up edge board and laying down fillet
Construction of control joints using hi-rib and inclusion points for post-tension strands
Forming up structural columns and walls
Cutting in ply around piles in the basements
Leveling with laser level
Instillation of wet area FFl steps.
Formwork Carpenter
Advance Formwork
05.2018 - 07.2019
reading plans and erections of base slab footings
reading plans, set out, forming and striping of stair cases
set out forming and striping of structural columns
forming, striping and cutting in of peri sky deck
interaction with luffer cranes in installation of formwork shutters
K Wallace Constructions Pty Ltd
01.2009 - 01.2013
General residential construction and renovations tasks such as Hanging doors and furniture, Skirting and architrave, Patios, Roof plumbing (sheeting, gutter and down pipes) Timber decks, General maintenance, Plaster sheeting walls and ceilings
Education
La Salle College
Perth
Skills
Strong understanding of safety protocols and compliance in remote and high-risk environments
Adaptable to work in challenging weather conditions and isolated settings
Experience working in a team-based environment and maintaining high levels of collaboration
Skilled in problem-solving and critical thinking to troubleshoot complex issues