Summary
Overview
Work History
Skills
Certification
references
Timeline
Generic

Jason Murphy

Grovedale,VIC

Summary

Knowledgeable and ambitious facade installer with over 10 years experience in leading hand and supervisor roles, projects range from high end custom homes to iconic facades that stand out in the Melbourne sky-line, with everything in between.

Bringing with me many years of experience in the construction industry, with expansive knowledge of multiple facade systems and strong trade background.

Strong pipeline of professional contacts in the industry, from full contractors to equipment hire, material suppliers and labour solutions.

Overview

11
11
years of professional experience
1
1
Certification

Work History

Carpenter/ Installer

DACA Construction
07.2023 - Current
  • General carpenter duties for well respected facade company
  • Specialising in difficult glass installation and complicated facade types
  • Current work located in Domain Station on afternoon shift

Site Supervisor Facade

Innovative Window Solutions
03.2023 - 07.2023
  • Site supervisor for Everton Rd school Truganina, for Hutchinsons builders. Project value $30
  • Project consists of window wall awning and door panels for multiple single level school buildings, D&C contract from local supplier using AWS aluminium system.
  • Improved construction project efficiency by effectively managing labour delegation and delivery of materials.
  • Achieved timely completion of handovers by coordinating with contractors and ensuring adherence to schedules.
  • Working closely with builder appointed designers and engineers to correct structural changes and having materials made to suit before manufacture stage.
  • Close partnership with internal and external trades to provide seamless flow of work to aid other supervisors to meet targets.

Site Supervisor Facade

Apex Install
02.2022 - 03.2023
  • Site supervisor for major project in Geelong CBD, Ryrie Quarter for Maxcon construction. $200m project
  • Facade consisting of curtain wall, window wall and GRC panels.
  • Management of workforce of 20-30 tradesmen, delegating work areas to ensure fast completion of project.
  • Organization of plant and equipment hire, ordering of consumables and fixings, coordination with labour hire companies when extra labour required.
  • Maintaining delivery schedule to provide continuous flow of works.
  • Attend subcontractors meeting to provide accurate progress updates to builder and coordinate target areas with other subcontractors to aid in total handover of project.
  • Hands-on approach to providing accurate set out for framing crews, and consultation with manufacturer engineers to ensure all plans, methodology and problems are solved before workers get to any certain task.

Site Supervisor Facade

Facade Design International
04.2018 - 03.2022
  • Site supervisor for major tier 1 project, 447 Collins street "Collins arch", for Multiplex construction. project value $1.25b.
  • Project consisting of full facade window wall panels with curtain wall spandrels
  • Manage crew of installers ranging from 30 men to 120 at the peak of the project. Working day shift, night shift, weekends and RDOs with 5 separate mastclimber crews.
  • Ensure maximum productivity across multiple live edge areas and adhere to strict drop zone requirements.
  • Strong knowledge of lifting capacity for mini cranes and glass lifters to ensure safe install of panels over high traffic area of Melbourne CBD.
  • Implementation and enforcement of strict health and safety protocols, ensuring all works adhere to Swms and and tools and materials to be tethered.
  • Attend 2 weekly subcontractors meetings to provide updates and programs to builder and other trades
  • Attend daily facade, drop zone and mastclimber meetings to provide constant updates to builder about target area completion
  • Constant communication with window supplier to have appropriate materials delivered to site daily to provide continuous flow of work for installers over multiple areas and facade types.
  • Coordination with manufacturer engineer to provide plans, install methodology and engineering solutions in advance of time of install.
  • Coordination with formworkers, waterproofers and surveyors so that work areas are ready for teams to start on new areas.
  • Organising delivery of plant and equipment to site when needed.
  • Ordering of fixings and consumables to ensure fully stocked inventory

Self Employed Carpenter

Self Employed
08.2016 - 02.2018
  • Subcontracting carpenter to Top Knot carpentry and MD projects.
  • General Carpentry duties including;
  • Timber framing
  • Roofing
  • Skirting and architraves
  • Cabinet install
  • Door installation
  • General site carpentry

Leading Hand Carpenter

Summit Auminium
01.2013 - 07.2016
  • Leading hand Carpenter for local manufacturer of aluminium windows and doors.
  • Install of subframe and panels over multiple mid-rise building over the Melbourne metro area.
  • organisation of materials and consumables to supplement my crew of 4 installers to ensure timely completion of tasks.
  • coordinate day to day works over multiple jobs at any given time. Ensuring all projects are ahead of target and satisfy Builders that other trades can complete works in our finished areas.

Skills

  • Project Planning
  • Work best in a fast paced environment
  • Able to handle pressure
  • Plan interpretation, strong understanding of grids and RLs
  • Understanding of plant lifting capacity and capabilities
  • Orginisational skills, labour delgation and sequence of works
  • Coordination across multiple trades, and understanding their scopes
  • Health and safety requirements and procedures
  • Working at height and live edge protocol
  • Good communication skills
  • Proffesional manner with trades, builders and clients
  • Strong understanding of engineering solutions

Certification

White card

Pegasus

RIW

SWIRC

EWP

Boom Lift over 11m

Working at Heights

Dogman

references

Justin Finch

Owner Apex Install

0409400888


Roman Scheiwiller

Site Manager Facade Designs International

0421274748


Professional References


Dennis Yuliadinata

Project coordinator Yuanda/ JMC facades

0432589167


Artie VanHensbergen

Owner Insight Install

0415634671


Akis Kritikos

Site Manager Maxcon/ Ironside

0437718887

Timeline

Carpenter/ Installer

DACA Construction
07.2023 - Current

Site Supervisor Facade

Innovative Window Solutions
03.2023 - 07.2023

Site Supervisor Facade

Apex Install
02.2022 - 03.2023

Site Supervisor Facade

Facade Design International
04.2018 - 03.2022

Self Employed Carpenter

Self Employed
08.2016 - 02.2018

Leading Hand Carpenter

Summit Auminium
01.2013 - 07.2016

White card

Pegasus

RIW

SWIRC

EWP

Boom Lift over 11m

Working at Heights

Dogman

Jason Murphy